FDEP Division of Water Restoration Assistance, State Revolving Fund program
Rolling
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Request for Inclusion anytime. Priority lists are adopted at quarterly meetings, the second Wednesday of February, May, August and November.
- Funding
- FFY2026: $24.1M base and $83.2M IIJA supplemental capitalization grants. Base grant: 20% to 40% as principal forgiveness; IIJA grant: 49%. Small communities: forgiveness of 50% on planning and 70% to 90% on design and construction by affordability index. Emerging contaminants: $7.2M at 100% forgiveness. Rates from a market-rate formula, minimum 0.2%, 20-year terms.
- Who
- Cities, counties and special districts
- Pays for
- Wastewater treatment, collection systems, reuse, septic-to-sewer, stormwater and nonpoint source projects; planning, design and construction loans.
A Request for Inclusion (email SRFRFI@FloridaDEP.gov) sets eligibility, forgiveness and the priority score; only ready-to-proceed projects go on the fundable list. 15% of funds are reserved for communities of 10,000 or fewer. One sponsor's yearly loans were capped at $20M last year. Construction loans get a 0.5% rate cut for Davis-Bacon and American Iron and Steel, and 0.1% each for green projects and an asset management plan. Terms are from the FFY2026 IUP; confirm in the current plan. Virtual office hours: Dec 2, 2026 and Mar 3, 2027.
How NEER helps: Facility plans built on calibrated sewer models; I/I and capacity studies; septic-to-sewer and stormwater project scoping.
FDEP Division of Water Restoration Assistance, State Revolving Fund program
Rolling
LoanGrant (principal forgiveness)Drinking water
- Next date
- Request for Inclusion anytime. Forgiveness loans are prioritized twice a year, in February and August.
- Funding
- FFY2026-27: $13.9M base and $89.9M IIJA supplemental capitalization grants; 26% to 49% of the base grant and 49% of the IIJA grant go out as subsidy. Small disadvantaged communities: 20% to 90% forgiveness; other disadvantaged communities: 20% if funds allow. Lead service lines: 49% forgiveness for disadvantaged communities, the rest a 0% 10-year loan. Emerging contaminants: 100% forgiveness. Terms 20 years, or 30 for disadvantaged communities; minimum rate 0.2%.
- Who
- Local governments, special districts and private utilities that own public water systems
- Pays for
- Treatment, wells, storage, mains, full lead service line replacement and inventories, and PFAS and other emerging contaminant projects; planning, design and construction loans.
Small disadvantaged means a system serving fewer than 10,000 people with median household income below the state average. If subsidy is left, systems serving 25,000 or fewer also get it. Lead line replacement must cover the whole line, public and private side; inventories are funded as planning loans. At least 25% of emerging contaminant money goes to small disadvantaged communities.
How NEER helps: Lead service line material prediction; water system models for master plans and planning documents.
FDEP State Revolving Fund program
Next cycle
LoanGrant (principal forgiveness)Drinking waterWastewater (sewer)
- Next date
- Applications closed Jun 30, 2025. Ask FDEP whether funds remain.
- Funding
- $806M for clean water treatment works, $36M for septic-to-sewer connections and $845M for drinking water. 50% forgiveness and 0% interest; 100% forgiveness for financially disadvantaged communities and septic-to-sewer projects.
- Who
- SRF-eligible entities and public water systems damaged by, or that lost a mission-essential function in, Hurricane Helene or Milton
- Pays for
- Resilience projects that reduce flood or other disaster risk at treatment works and water systems, and connecting homes on septic to sewer (public right-of-way only).
Planning, design and construction go under one loan agreement, and time extensions are not allowed.
How NEER helps: Flood risk analysis for treatment plants, lift stations and wells.
FDEP State Revolving Fund program
Rolling
GrantWastewater (sewer)
- Next date
- Through the Clean Water SRF Request for Inclusion, anytime
- Funding
- Planning 50%; design and construction 70% to 90% of the loan amount by affordability index (90% below 65, 80% from 65 to 100, 70% above 100). Capped at 25% of the year's available funds per project.
- Who
- Municipalities, counties or authorities with 10,000 or fewer people and per capita income below the Florida average
- Pays for
- Wastewater planning, design and construction, paired with a Clean Water SRF loan.
The project must also take a CWSRF loan. The grant drops to 0% if the sponsor hasn't adopted and implemented an asset management plan before the final construction disbursement; Florida Rural Water Association helps small systems write one at no charge.
How NEER helps: Facility plans and sewer models for small systems.
FDEP Resilient Florida Program
Next cycle
GrantMatch helpStormwater & floodWastewater (sewer)Drinking water
- Next date
- 2026 portal for Statewide Plan projects was open Jul 1 to Sep 1, 2026. Planning grants were not offered in 2026. The 2027 cycle is expected to close Sep 1, 2027.
- Funding
- Check the agency. Statewide Plan projects need a 50% cost share unless the community qualifies for a reduced share.
- Who
- Counties, municipalities, special districts with specific responsibilities and regional resilience entities; water management, drainage and flood control districts can also submit Statewide Plan projects
- Pays for
- Planning grants: vulnerability assessments, adaptation plans and resilience planning. Statewide Plan: flooding and sea level rise adaptation projects for critical assets.
Implementation projects need a vulnerability assessment that shows flood or sea level rise risk to the asset. Reduced cost share applies to municipalities of 10,000 or fewer and counties of 50,000 or fewer with per capita income below the state's, or any community at 75% or less of state per capita income. Projects from the 2026 cycle will be funded from FY2027-28 money. FDEP sends the plan to the Governor and Legislature leaders by Dec 1 each year.
How NEER helps: Vulnerability assessments, flood and sea level rise models, and project scoring support.
FDEP Division of Water Restoration Assistance
Next cycle
GrantWastewater (sewer)Stormwater & flood
- Next date
- FY2026-27 proposals are closed. The portal reopens with each year's appropriation; last year it ran Jul 7 to Sep 1, 2025.
- Funding
- FY2026-27: $25M for the Indian River Lagoon and $20M for Biscayne Bay. No set limits; most awards are $500K to $6M. No required match.
- Who
- Florida governmental entities such as cities and counties
- Pays for
- Septic-to-sewer, upgrades to advanced waste treatment, wastewater collection and reuse, enhanced nutrient-reducing septic systems, and stormwater treatment.
Formerly the Wastewater Grant Program. Priority goes to nutrient load reduction in impaired waters, BMAP and similar plan areas and rural areas of opportunity. Local cost share counts in scoring. Septic-to-sewer projects must require connections, and impact fees aren't eligible. For FY2026-27, FDEP offered only the Indian River Lagoon and Biscayne Bay programs through this portal.
How NEER helps: Septic-to-sewer planning and nutrient load estimates; sewer and stormwater models.
FDEP, with the water management districts
Next cycle
GrantWastewater (sewer)Stormwater & floodDrinking water
- Next date
- FY2026-27 awards announced Oct 28, 2026. Next portal expected summer 2027.
- Funding
- $50M for FY2026-27 (23 projects). No set limits; most awards are $100K to $5M. No required match.
- Who
- Local governments and nonstate entities
- Pays for
- Capital projects and land acquisition that protect spring water quality or flow: septic-to-sewer, septic upgrades, wastewater treatment upgrades, stormwater treatment, aquifer recharge, reuse and agricultural BMPs.
Apply only through the Protecting Florida Together portal; the districts help evaluate. Feasibility studies and data collection aren't eligible. Large projects can be phased under a multi-year plan.
How NEER helps: Septic-to-sewer planning and wastewater models for springsheds.
FDEP, with the water management districts
Next cycle
GrantDrinking water
- Next date
- FY2026-27 awards announced Oct 28, 2026. No set opening date for the next portal.
- Funding
- $50M for FY2026-27 (22 projects). No set limits; no required match.
- Who
- Counties, municipalities, special districts, public utilities, public universities and colleges, and nonprofits
- Pays for
- Reuse, conservation and other water supply and water resource development projects.
Priority goes to regional projects in areas of greatest need. The districts also submit projects from their own cost-share cycles, so don't send the same proposal twice unless it has changed.
How NEER helps: Water system models for reuse and supply projects.
FDEP Nonpoint Source Management Program
Next cycle
GrantStormwater & floodWastewater (sewer)
- Next date
- FY2026-27 proposals were due Sep 1, 2026; awards expected fall 2026
- Funding
- About $5M a year in state funds (no match) and about $3M in federal 319 funds (generally 40% non-federal match; a CWSRF loan can be the match)
- Who
- Governmental entities, public universities and colleges, and nonprofits
- Pays for
- Shovel-ready stormwater treatment, green infrastructure and other nonpoint source BMPs for impaired waters; with 319 money, septic-to-sewer laterals and connections on private property.
319 money can't pay for anything an MS4 permit requires and needs water quality monitoring of the finished BMP. Federal projects take about 18 months from proposal to available funds.
How NEER helps: Stormwater models and pollutant load estimates for BMP design.
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- FFY2025 cycle ran Apr 6 to May 20, 2026. Next cycle expected spring 2027.
- Funding
- Recent Northwest Florida awards ranged from $622K to $1.77M
- Who
- Non-entitlement cities under 50,000 and counties under 200,000; most activities must benefit low- and moderate-income residents
- Pays for
- Neighborhood Revitalization (water, sewer, drainage), Commercial Revitalization, Housing Rehabilitation and Economic Development.
Recent awards paid for wastewater plant upgrades, sewer extensions and well and waterline replacement. The program rule is Chapter 73C-23, F.A.C. Confirm cycle dates with FloridaCommerce.
How NEER helps: Engineering reports and water and sewer models to define the project.
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2026-27 cycle opened in June 2026 and awards were announced Oct 13, 2026. Next cycle expected mid-2027.
- Funding
- $27M awarded to 14 communities in 2026. Up to 75% of project cost, or 100% in a rural area of opportunity or a rural community in a fiscally constrained county. Planning, feasibility and design grants up to $300K.
- Who
- Rural communities, rural counties and rural areas of opportunity
- Pays for
- Infrastructure that supports jobs and capital investment: stormwater systems, water and wastewater extensions, roads and site work.
FloridaCommerce got 141 applications asking for $193M in 2026, so tie the project to a named business or job outcome. The 2026 awards included a $300K stormwater resiliency study and a $100K wastewater treatment evaluation.
How NEER helps: Feasibility studies and water, sewer and drainage models for site readiness.
Florida Division of Emergency Management, Bureau of Mitigation
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
- Next date
- FY2026 FMA subapplications due in FEMA GO Dec 18, 2026, 5 p.m. ET. BRIC opens after FEMA's next NOFO.
- Funding
- Passes through FEMA funds. Helene (DR-4828) HMGP county allocations total $298M and Milton (DR-4834) $448M. FMA: 75% federal, 90% for repetitive loss and 100% for severe repetitive loss properties. BRIC: 75% federal, 90% for small impoverished communities.
- Who
- Local governments with a FEMA-approved mitigation plan, state agencies, tribes; private nonprofits for HMGP
- Pays for
- Flood risk reduction, drainage and infrastructure retrofits, generators for critical facilities, elevation and acquisition.
HMGP projects must first be endorsed by the county's Local Mitigation Strategy Working Group; applications without the signed letter are denied. Helene and Milton HMGP applications closed Jul 25, 2025, and allocations were locked by county in January 2026. FDEM took FMA and BRIC Notices of Interest from Jul 13 to Aug 14, 2026. For the restarted FY2024-25 BRIC round, FDEM invited only earlier subapplicants. Hurricane Isaias (DR-4955, declared Oct 27, 2026) lists only Individual and Public Assistance on FEMA's page; ask FDEM about HMGP.
How NEER helps: Benefit-cost analysis and H&H modeling for drainage and flood projects.