Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Michigan water infrastructure funding

Federal, state and local grants and loans that communities in Michigan can use for drinking water, wastewater and stormwater projects.

18Grant programs
4Loan programs
12Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 18Loans 4Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  2. Dec 18, 2026
    Deadline
    Michigan DWSRF FY2027 milestone schedules dueProjects in the FY2027 fundable range must sign the milestone schedule from their WIFFS project manager or be bypassed.Drinking Water SRF, incl. lead service lines and PFAS
  3. Dec 18, 2026
    Deadline
    Michigan Dam Risk Reduction Grant pre-proposals dueUp to $10M. Priority projects are invited to send full applications.Dam Risk Reduction Grant Program
  4. Winter 2026
    Watch
    SEMCOG green infrastructure awardsSEMCOG's Regional Review Committee picks 12 to 15 projects; subawardees are notified in winter 2026.SEMCOG Community Green Infrastructure Grant
  5. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  6. ~Feb 2027estimate
    Expected
    MSHDA CDBG MI Neighborhood letters of intentRound 4 took letters of intent Feb 4 to Mar 4, 2026. A 2027 round hasn't been announced.CDBG MI Neighborhood (infrastructure for housing)
  7. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  8. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  9. ~May 1, 2027estimate
    Expected
    Michigan CWSRF FY2028 project plans dueFinal project plan and overburdened survey for the FY2028 Clean Water priority list. May 1 is the date used in past cycles; confirm with EGLE.Clean Water SRF loans and principal forgiveness
  10. ~Jun 1, 2027estimate
    Expected
    Michigan DWSRF FY2028 planning documents dueFinal planning documents for the FY2028 Drinking Water list. The FY2026 and FY2027 cycles used June 1.Drinking Water SRF, incl. lead service lines and PFAS
  11. ~Jul 2027
    Watch
    Michigan draft FY2028 DWSRF Intended Use PlanThe FY2027 draft came out in July 2026, with comments through Aug 21, 2026. It sets forgiveness shares and the fundable range.Drinking Water SRF, incl. lead service lines and PFAS

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Michigan: Apply through MSP/EMHSD (MSP-EMHSD-Hazard-Mitigation-Grants@Michigan.gov). EMHSD screens a Notice of Intent first; its last FMA NOI deadline was Jun 1, 2026. Ask for the FY2026 state date, which comes before FEMA's Feb 26, 2027 deadline.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Michigan: DR-4925 (Apr 10-21, 2026 storms, tornadoes and flooding) was declared Jun 30, 2026, inside the FY2026 Swift Current window. Michigan qualifies only if it meets FEMA's NFIP claims test; ask EMHSD.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Michigan: DR-4925 was declared Jun 30, 2026 with Individual Assistance in 27 counties and Public Assistance in 27 counties. The Mar 28-30, 2025 ice storm (DR-4880, declared Jul 22, 2025) has Public Assistance in 14 counties. OpenFEMA showed no Hazard Mitigation designation for either as of Nov 13, 2026; ask EMHSD.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Michigan: MSP/EMHSD ran the FY2025 BRIC intake: Notice of Intent by Apr 29, full application by Jun 10 and final application by Jul 8, 2026.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In Michigan: EGLE lists EPA's EC-SDC grant among its drinking water grants. Ask EGLE-DWGrants@Michigan.gov.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Michigan Michigan Department of Environment, Great Lakes, and Energy (EGLE: State Revolving Funds, water infrastructure and dam safety grants), Michigan Finance Authority (SRF bonds), Michigan Economic Development Corporation and Michigan State Housing Development Authority (CDBG), and Michigan State Police Emergency Management and Homeland Security Division (hazard mitigation).

Clean Water SRF loans and principal forgiveness

EGLE, Water Infrastructure Funding and Financing Section (WIFFS), with the Michigan Finance Authority
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Expected May 1, 2027: final project plan and overburdened survey for the FY2028 priority list. The FY2028 Intent to Apply was expected by Nov 1, 2026.
Funding
Low-interest loans, with principal forgiveness, lower rates or longer terms for overburdened and significantly overburdened applicants. FY2027 rates and forgiveness shares: check the agency. Example: a FY2026 award to Union Township was a 2.0% loan for 20 or 30 years with 13% forgiveness.
Who
Local municipalities
Pays for
Wastewater treatment upgrades, sewer rehabilitation, sewer overflow abatement and some stormwater work.

Projects are scored and placed on the annual Project Priority List only after a final project plan is in. Overburdened status has to be recalculated every year, so send the survey with the plan. Michigan's FY2027 Clean Water IUP could not be opened for this check; read it before quoting rates.

How NEER helps: Project plans built on calibrated sewer and stormwater models; I/I and capacity studies.

Drinking Water SRF, incl. lead service lines and PFAS

EGLE, Water Infrastructure Funding and Financing Section (WIFFS), with the Michigan Finance Authority
Open now
LoanGrant (principal forgiveness; state lead line grant)Drinking water
Next date
Dec 18, 2026: FY2027 projects must sign milestone schedules. Expected Jun 1, 2027: final planning documents for the FY2028 list (Intent to Apply was expected by Nov 1, 2026).
Funding
FY2027 traditional list: 20% forgiveness for significantly overburdened and 15% for overburdened applicants; 100% forgiveness for emerging contaminant work. Lead-only projects: 0% loans up to 40 years, 100% forgiveness for disadvantaged systems, state grant up to 10% for others, capped at $34M per project. Rates 2.50% (20 yr), 2.75% (30 yr), 2.00% overburdened, 1.00% significantly overburdened.
Who
Community water supplies and nonprofit noncommunity water systems. Overburdened status for FY2027 needs a service-area MAHI below $58,300.
Pays for
Treatment, wells, intakes, storage, mains, lead and galvanized service line replacement (full replacements only), and PFAS treatment or connecting PFAS-impacted wells.

FY2027 traditional requests were $662.6M from 80 projects against about $172M in loans and $52M in forgiveness. 70 of 88 lead-only projects were fundable. A project that is bypassed or declines FY2027 money can't be on the FY2028 list. The $17.4M state lead line grant (PA 22 of 2025) is paid through this program.

How NEER helps: Lead service line material prediction; water system models.

MI Clean Water and EGLE water infrastructure grants (DWAM, C2R2, SPHRP, ARP)

EGLE, Drinking Water and Environmental Health Division and WIFFS
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
No open round found as of Nov 2026. Check the agency.
Funding
Check the agency. FY2023 awards included $19.7M in Drinking Water Asset Management grants, $20.3M in C2R2 grants and $8.0M in SPHRP grants.
Who
Drinking water suppliers and local communities
Pays for
Asset management plans and pipe material inventories (DWAM), PFAS and contaminant reduction or well connections (C2R2), and removal of direct raw sewage discharges (SPHRP).

EGLE's Water Infrastructure Grants Dashboard (Apr 2026) tracks these awards. Ask EGLE-DWGrants@Michigan.gov about new money before planning on it. Lead line grant money now goes through the Drinking Water SRF.

How NEER helps: Asset management plans and service line inventories.

Dam Risk Reduction Grant Program

EGLE, Water Resources Division, Dam Safety Unit
Open now
GrantStormwater & flood
Next date
Dec 18, 2026: pre-proposals due. Priority projects are then invited to send full applications.
Funding
Up to $10M available (PA 21 of 2026)
Who
Owners or operators of high- or significant-hazard dams, poor-condition dams regulated under Part 315, and dams affected by a state of emergency or disaster
Pays for
Design of risk reduction projects; repair, alteration or removal of dams; post-project monitoring and corrective work.

Questions go to EGLE-WRD-DRRGP@Michigan.gov.

How NEER helps: Dam breach and inundation modeling to support the risk case.

GrantStormwater & flood
Next date
Special round closed Apr 10, 2026. No new round announced.
Funding
Up to $450,000 per application, at least 20% match. The special round spread about $800,000 of unspent 2023 money from a $14.35M appropriation.
Who
Check the agency
Pays for
Infrastructure and planning for severe weather: flooding, coastline erosion, urban heat and stormwater management.

Watch EGLE's grant page for unspent money being offered again.

How NEER helps: Flood and stormwater models to scope the project.

CDBG Water-Related Infrastructure

Michigan Economic Development Corporation, for the Michigan Strategic Fund
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2025 round closed May 30, 2025. No 2026 round found; ask MEDC (CDBG@michigan.org).
Funding
Check the agency. Local cash match is optional and adds points at 11% or more of project cost.
Who
Non-entitlement cities, villages, townships and counties on HUD's low-moderate income list. Genesee, Kent, Macomb, Oakland, Washtenaw and Wayne counties and 17 entitlement cities can't apply directly.
Pays for
Replacing or improving water lines, sanitary and storm sewers, and wastewater plants; lead and galvanized service lines required by the Lead and Copper Rule; related road work and engineering.

Since Oct 1, 2023, HUD sends Michigan's CDBG allocation through MSHDA, and new CDBG funding opportunities are posted by MSHDA. Extending or upsizing utilities for growth was not eligible in 2025.

How NEER helps: Engineering support for the project description.

CDBG MI Neighborhood (infrastructure for housing)

Michigan State Housing Development Authority, Neighborhood Development Division
Next cycle
GrantDrinking waterWastewater (sewer)
Next date
Round 4 letters of intent closed Mar 4, 2026. Next round expected about Feb 2027 if the cycle repeats.
Funding
Check the agency
Who
Non-entitlement city, township and county governments
Pays for
Housing, infrastructure and community development for low- and moderate-income residents, such as water and sewer extensions to a housing site.

Selected applicants have 120 days after designation to send a full application. Rounds are announced by region.

How NEER helps: Utility extension design for housing sites.

MSP/EMHSD hazard mitigation intake (FMA, BRIC, HMGP)

Michigan State Police, Emergency Management and Homeland Security Division
Check agency
GrantStormwater & flood
Next date
FY2026 FMA is open at FEMA until Feb 26, 2027; ask EMHSD for its earlier state date. The last FMA Notice of Intent deadline was Jun 1, 2026.
Funding
Passes through FEMA funds; BRIC is 75% federal
Who
Local governments and tribes with a FEMA-approved hazard mitigation plan that includes the project
Pays for
EMHSD is the state applicant. It collects Notices of Intent from subapplicants and coordinates their applications to FEMA.

FY2025 BRIC ran on NOI Apr 29, full application Jun 10 and final application Jul 8, 2026. DR-4925 (Apr 10-21, 2026 storms and flooding) was declared Jun 30, 2026, but OpenFEMA showed no Hazard Mitigation designation as of Nov 13, 2026. Contact MSP-EMHSD-Hazard-Mitigation-Grants@Michigan.gov.

How NEER helps: Hazard mitigation plan action items and benefit-cost support backed by flood models.

Local and regional County and regional cost-share programs.

SEMCOG Community Green Infrastructure Grant

Southeast Michigan Council of Governments
Next cycle
GrantStormwater & flood
Next date
Applications closed Sep 18, 2026. Awards expected winter 2026; projects built spring 2027 to June 2030.
Funding
$50,000 to $300,000 per project; $3.2M total from EPA's Great Lakes Community Project Grant
Who
Counties, cities, townships, villages, intermediate school districts and community colleges; nonprofits partnered with the local government
Pays for
Green infrastructure on public property: rain gardens, permeable pavement, wetland and floodplain restoration, trees, regional detention.

SEMCOG expects to fund 12 to 15 projects. Watch for a new round.

How NEER helps: Stormwater models to size and site green infrastructure.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. EGLE bulletin: State Revolving Fund deadlines looming for fiscal year 2025 funds (Apr 26, 2024)
  21. Union Township (Isabella County) board packet, Nov 25, 2025: FY2026 CWSRF award
  22. Water Online: EGLE announces $30.8M in MI Clean Water grants (Aug 4, 2023)
  23. EGLE DWSRF Intended Use Plan, Fiscal Year 2027 (July 2026), reproduced in the City of Saugatuck council packet, Oct 26, 2026
  24. EGLE: Drinking Water State Revolving Fund Overview (Eric Pocan, WIFFS)
  25. EGLE: New Water Infrastructure Grants Dashboard (Apr 14, 2026, via EIN Presswire)
  26. EGLE: Dam Risk Reduction Grant Program accepting pre-proposals through Dec. 18 (Nov 20, 2026, via EIN Presswire)
  27. Michigan Municipal League: EGLE special RFP for State High Water Infrastructure Grants (Mar 16, 2026)
  28. MEDC: CDBG Water-Related Infrastructure application instructions (Mar 25, 2025)
  29. MEDC MiPlace: Community Development Block Grant
  30. GrantExec: MSHDA Community Development Block Grant Neighborhood Program
  31. GrantExec: BRIC FY2025, Michigan State Police EMHSD
  32. Michigan Townships Association, Township Insights (Apr 10, 2026): hazard mitigation grant opportunity
  33. Michigan Townships Association, Township Insights (May 15, 2026): funding for flood mitigation projects
  34. OpenFEMA Disaster Declarations Summaries, Michigan since Jun 2024 (refreshed Nov 13, 2026)
  35. SEMCOG: Community Green Infrastructure Grant Program
  36. Planet Detroit: Can green infrastructure fortify flood-prone Southeast Michigan? (Sep 30, 2026)