Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Nebraska water infrastructure funding

Federal, state and local grants and loans that communities in Nebraska can use for drinking water, wastewater and stormwater projects.

20Grant programs
4Loan programs
15Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 20Loans 4Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 4, 2026
    Deadline
    Nebraska FMA Notice of Interest due to DWEEFY2026 Flood Mitigation Assistance. Late NOIs are accepted but ranked separately.Hazard mitigation intake (FMA through DWEE; HMGP and BRIC through NEMA)
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. By end of 2026estimate
    Expected
    WaterSMART Water & Energy Efficiency NOFO expectedReclamation states only.WaterSMART Water & Energy Efficiency Grants
  4. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  5. Jan 21, 2027
    Deadline
    Nebraska FMA subapplications due to DWEELast day to submit subapplications to the Floodplain Management Division for review.Hazard mitigation intake (FMA through DWEE; HMGP and BRIC through NEMA)
  6. Feb 25, 2027
    Deadline
    Nebraska submits its FMA applicationState deadline, one day before FEMA's Feb 26 deadline.Hazard mitigation intake (FMA through DWEE; HMGP and BRIC through NEMA)
  7. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  8. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  9. ~Spring 2027estimate
    Expected
    Nebraska Source Water Protection Grants RFPDWEE issues the RFP each spring for systems of 10,000 or fewer.Drinking water small-system grants (source water protection, security, hydrovac)
  10. ~Late Jun 2027estimate
    Expected
    Nebraska SFY2028 SRF Intended Use Plan hearingThe SFY2027 plan was approved by the Environmental Quality Council on Jun 24, 2026 after 30 days of public notice.Clean Water SRF loans and loan forgiveness
  11. ~Jul 1, 2027estimate
    Expected
    Nebraska 2027 CDBG applications openThe 2026 cycle opened Jul 1, 2026.CDBG Public Works – Infrastructure and Planning
  12. ~Mid-Jul 2027estimate
    Expected
    Nebraska Environmental Trust 2028 cycle opensThe 2027 cycle opened Jul 13, 2026.Nebraska Environmental Trust grants
  13. ~Early Sep 2027estimate
    Expected
    Nebraska Environmental Trust applications dueThe 2027 cycle closed Sep 8, 2026.Nebraska Environmental Trust grants
  14. ~Sep 15, 2027estimate
    Expected
    Nebraska CDBG Public Works and Planning applications dueSep 15 was the deadline in 2024 and 2026.CDBG Public Works – Infrastructure and Planning

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Nebraska: In Nebraska, FMA runs through the DWEE Floodplain Management Division, not NEMA. Notice of Interest due Dec 4, 2026; subapplications Jan 21, 2027; the state submits Feb 25, 2027.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Nebraska: For Nebraska's FY2024 Swift Current round, NOIs were due Sep 1, 2026 and applications to the state Dec 1. Ask the DWEE Floodplain Management Division about later rounds.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Nebraska: Apply through NEMA with a Notice of Interest. DR-4928 (May 15–18, 2026 storms and flooding; Buffalo, Fillmore, Gage, Howard, Jefferson, Nemaha, Thayer and Thurston counties) was declared Aug 3, 2026, and DR-4920 covers the March–April 2026 wildfires. Ask NEMA whether HMGP is open for either.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Nebraska: NEMA runs BRIC in Nebraska. Its FY2024–25 application period ended Jul 23, 2026.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Nebraska: Nebraska runs OSG through the CWSRF. At least 25% goes to rural or financially distressed communities, and the CWSRF may cover the local share (up to 20%) with a loan that is half grant if administrative funds allow.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

In Nebraska: Nebraska uses a common pre-application reviewed by the Water Wastewater Advisory Committee (DWEE and USDA Rural Development). Send it with the PER to dwee.WWAC@nebraska.gov; the technical subcommittee meets the fourth Tuesday of each month in Lincoln.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Opening soon
GrantDrinking water
Next date
FY2026 NOFO expected before the end of 2026
Funding
FY2026 WaterSMART Grants appropriation: $15M
Who
Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
Pays for
Water loss reduction, metering and AMI, efficiency and supply reliability projects.

In Nebraska: Nebraska is one of the 17 Reclamation states, so it is eligible.

Only the 17 Reclamation states are eligible.

How NEER helps: Water loss and pressure analysis with distribution models.

Nebraska Nebraska Department of Water, Energy, and Environment (SRFs, floodplain management and FMA, stormwater grants), Department of Economic Development (CDBG), Nebraska Emergency Management Agency (HMGP, BRIC), Natural Resources Commission (Water Sustainability Fund), Nebraska Environmental Trust, and the natural resources districts.

Clean Water SRF loans and loan forgiveness

Nebraska Department of Water, Energy, and Environment (DWEE), State Revolving Fund Section
Rolling
LoanGrant (loan forgiveness)Wastewater (sewer)Stormwater & flood
Next date
The Oct 1, 2026 bypass date has passed; ready projects on the planning list can now be funded in rank order while money lasts. SFY2028 plan expected about June 2027.
Funding
Forgiveness of about 35%–55% for traditional projects, capped by population and income; rate plus fee 1.5%–2.5%; terms up to 30 years; planning loans up to 5 years
Who
Nebraska municipalities, NRDs, SIDs and counties with a project on the CWSRF priority planning list. Forgiveness mainly goes to towns of 10,000 or fewer with a moderate or high AWIN sustainability risk.
Pays for
Wastewater treatment, sanitary sewers, combined sewer separation, storm sewers and nonpoint source projects.

The SFY2027 plan extends last year's program and delays ranking new project submissions for at least one year, because DWEE projects near-zero SRF cash at the end of 2028. Planning (PPAR) and emergency grants are on hold. Projects with natural or nature-inspired features can get up to 0.50% off the interest rate.

How NEER helps: Facility plans and PERs built on calibrated sewer models; I/I and capacity studies.

Drinking Water SRF, incl. lead service lines and PFAS

Nebraska Department of Water, Energy, and Environment (DWEE), State Revolving Fund Section
Rolling
LoanGrant (loan forgiveness)Drinking water
Next date
The Oct 1, 2026 bypass date has passed; ready projects can be funded in rank order while money lasts. SFY2028 plan expected about June 2027.
Funding
Forgiveness up to 60% (up to 75% for emerging contaminants, emergencies, or supplying a system under an order); lead service lines at 0% with up to 60% forgiveness plus a 10% grant for mechanical inventory; rate plus fee 1.5%–2.5%; up to 40 years for disadvantaged communities
Who
Owners of public water systems with a project on the DWSRF priority list
Pays for
Treatment, wells, storage, mains, lead service line replacement and PFAS treatment. Emerging contaminant money is limited to PFAS this year; manganese may become eligible after the bypass date.

About $72.4M in new federal money this year, mostly IIJA. Communities with MHI at or below 120% of the state MHI ($71,722) can get 40-year terms. Systems without water meters can still get lead line funding.

How NEER helps: Lead service line material prediction; water system models.

Drinking water small-system grants (source water protection, security, hydrovac)

Nebraska Department of Water, Energy, and Environment (DWEE)
Check agency
GrantDrinking water
Next date
Source Water Protection RFP expected spring 2027. Security grants first come, first served. Hydrovac Grant Program closed Sep 30, 2026.
Funding
Source water protection: up to $150K in total. Security: up to $10K per system, 10% match. Hydrovac Grant Program: up to 50% of eligible costs.
Who
Political subdivisions of 10,000 or fewer that run a public water system. Hydrovac Grant Program: second-class cities and villages.
Pays for
Source water quality, quantity and education projects; alarms, cyber-security, locks and fencing; hydro-vacuum excavators for service line inventories.

Security grants require a DWEE-approved emergency response plan and attendance at a threats workshop. The SRF plan also describes a separate 90% coalition grant for hydrovac equipment for systems under 3,300 people.

How NEER helps: Service line inventory analytics.

Storm Water Management Plan Program grants

Nebraska Department of Water, Energy, and Environment (DWEE)
Check agency
GrantStormwater & flood
Next date
Check the agency. No current round or award list was found.
Funding
Set by appropriation; 20% local match
Who
Cities and counties with a DWEE-approved storm water management plan that meets NPDES requirements. At least 80% goes to urbanized areas by population; up to 20% to places over 10,000 outside them.
Pays for
Helps cities and counties carry out their Clean Water Act stormwater duties.

Ask DWEE whether funds are appropriated for the current year before preparing an application.

How NEER helps: Stormwater models and MS4 program support.

CDBG Public Works – Infrastructure and Planning

Nebraska Department of Economic Development
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 applications closed Sep 15, 2026 (a second cycle is possible). 2027 cycle expected to open Jul 1, 2027, due about Sep 15, 2027.
Funding
Public Works: $250K–$600K CDBG project costs. Match: 10% villages, 20% second-class cities, 25% counties, 30% first-class cities. Planning: up to $50K single, $70K joint.
Who
Counties and incorporated places under 50,000 other than the entitlement cities (Omaha, Lincoln, Bellevue, Grand Island); projects must benefit low- and moderate-income residents
Pays for
Water lines, wells, towers, sanitary sewers, lift stations, lagoons and treatment, storm sewers and flood drainage, including green stormwater infrastructure.

Scoring rewards water and wastewater projects tied to a preliminary engineering report. Applications made only to lower user fees or cover cost overruns are not funded. Planning grants cannot pay for project engineering.

How NEER helps: PERs and drainage studies that define the project.

Municipality Infrastructure Aid Program

Nebraska Department of Economic Development
Check agency
GrantDrinking waterWastewater (sewer)
Next date
Check DED for a new round
Funding
February 2025 round: $4.4M to four cities; 25% match
Who
Nebraska municipalities (check DED for eligibility)
Pays for
Water, sewer, road, bridge and site development infrastructure that supports business growth and jobs.

Bloomfield, Grand Island, North Platte and Ralston received the 2025 awards.

How NEER helps: Capacity analysis for new development.

Water Sustainability Fund

Nebraska Natural Resources Commission
Awaiting NOFO
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Funding cycles suspended by the Commission. The normal filing window is Mar 16–31.
Funding
Set by annual appropriation; 10% is set aside for storm and sanitary sewer separation and 10% for requests of $250K or less
Who
Local project sponsors
Pays for
Water management projects that meet the fund's statutory goals, including sewer separation.

The Commission suspended new cycles because of uncertain appropriations and litigation over Nebraska Environmental Trust transfers to the fund.

How NEER helps: Flood and sewer models to support applications.

Nebraska Environmental Trust grants

Nebraska Environmental Trust
Next cycle
GrantDrinking waterStormwater & flood
Next date
2027 cycle closed Sep 8, 2026. 2028 cycle expected to open mid-July 2027 and close early September 2027.
Funding
Over $25M available for the 2027 cycle
Who
Individuals, public entities and private organizations
Pays for
Projects in habitat, surface and ground water, waste management, air quality or soil management, such as stormwater wetlands.

Apply through the online portal at environmentaltrustgrants.org. NET staff help applicants (402-471-5409).

How NEER helps: Water quality and stormwater modeling for the application.

Hazard mitigation intake (FMA through DWEE; HMGP and BRIC through NEMA)

DWEE Floodplain Management Division (FMA); Nebraska Emergency Management Agency (HMGP, BRIC)
Open now
GrantStormwater & flood
Next date
FY2026 FMA: Notice of Interest due Dec 4, 2026; subapplications to DWEE Jan 21, 2027; state submits Feb 25, 2027
Funding
Passes through FEMA funds
Who
Nebraska local and tribal governments with a FEMA-approved hazard mitigation plan
Pays for
DWEE builds the state's FMA application; NEMA takes Notices of Interest for HMGP and BRIC.

Late FMA NOIs are accepted but ranked separately. NEMA keeps unselected NOIs on file for the next opportunity; send them to nema.hazardmitigation@nebraska.gov.

How NEER helps: Flood modeling and benefit-cost analysis.

Local and regional County and regional cost-share programs.

Community Assistance Program (CAP)

Lower Platte South Natural Resources District
Rolling
GrantStormwater & flood
Next date
Anytime: talk with NRD staff, send a request letter, then Urban Subcommittee review and a board vote
Funding
Typically up to 50% of cost. Policy revisions recommended in Dec 2025 cap each phase at $100K study, $100K design and $200K construction.
Who
Cities, villages, SIDs and homeowner associations in the district
Pays for
Studies, design and construction for drainage, stormwater, flood control, streambank and stream stability projects.

Paid as reimbursement after each phase. Construction cost-share is approved only after design is complete and a bid is accepted. The NRD also co-funds Lincoln's Deadmans Run flood reduction project.

How NEER helps: Drainage studies and flood models for the study phase.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Reclamation WaterSMART newsletter, Summer 2026
  21. Reclamation, Status of WaterSMART Program Funding Opportunities (updated Jan 21, 2025)
  22. Nebraska SRF Clean Water & Drinking Water Intended Use Plan, SFY2027 (approved Jun 24, 2026)
  23. DWEE Combined Clean Water and Drinking Water SRF Needs Survey, SFY2027
  24. DWEE: Drinking Water State Revolving Loan Fund
  25. DWEE: Hydrovac Grant Program
  26. Neb. Rev. Stat. 46-2,139, Storm Water Management Plan Program
  27. Nebraska DED 2026 CDBG Application Guidelines
  28. DED awards $4.4M through the Municipality Infrastructure Aid Program (Feb 2025)
  29. Natural Resources Commission: Water Sustainability Fund
  30. Nebraska Environmental Trust: 2027 grant cycle news release (Jun 29, 2026)
  31. DWEE Floodplain Management: Flood Mitigation (FY2026 FMA dates)
  32. NEMA: Hazard Mitigation Assistance Grants
  33. FEMA DR-4928-NE designated areas
  34. FEMA DR-4920-NE, Nebraska Wildfires
  35. Lower Platte South NRD: Community Assistance Program
  36. LPSNRD Urban Subcommittee minutes and CAP policy guide revisions (Dec 2025)