Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

New Hampshire water infrastructure funding

Federal, state and local grants and loans that communities in New Hampshire can use for drinking water, wastewater and stormwater projects.

20Grant programs
6Loan programs
14Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 20Loans 6Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  2. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  3. Jan 25, 2027 (expected)estimate
    Expected
    New Hampshire CDBG Housing and Public Facilities Round 1 dueCDFA's standing schedule puts Round 1 on the last Monday in January at 4 pm. Apply through nhcdfagrants.org; confirm the date with CDFA.CDBG Public Facilities, Emergency and Planning grants
  4. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  5. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  6. Spring 2027 (expected)estimate
    Expected
    New Hampshire Clean Water SRF call for pre-applicationsIn 2025 NHDES asked for project proposals on Mar 31. Wastewater, stormwater, planning, asset management and PFAS projects all start with a pre-application.Clean Water SRF loans with principal forgiveness
  7. May 1, 2027 (expected)estimate
    Expected
    New Hampshire clean water SRF final applications and asset management applications dueThe 2025 plan set May 1 of the following year for final loan applications and asset management grant applications. Check the current plan.SRF asset management grants
  8. Late May 2027 (expected)estimate
    Expected
    New Hampshire Clean Water SRF pre-applications duePre-applications were due May 30 in 2025. Projects not funded from an earlier list must apply again.Clean Water SRF loans with principal forgiveness
  9. Late May 2027 (expected)estimate
    Expected
    New Hampshire Drinking Water SRF pre-applications duePre-applications were due May 31 in 2024. Lead service line requests are accepted anytime.Drinking Water SRF, incl. lead service lines and emerging contaminants
  10. Jul 26, 2027 (expected)estimate
    Expected
    New Hampshire CDBG Housing and Public Facilities Round 2 dueCDFA's standing schedule puts Round 2 on the last Monday in July at 4 pm, opening the first week of April.CDBG Public Facilities, Emergency and Planning grants
  11. Mid-Sep 2027 (expected)estimate
    Expected
    New Hampshire Watershed Assistance (319) pre-proposals dueThe 2026 round's pre-proposals were due Sep 11, 2026 after a required consultation with an NHDES project manager. Check the agency for the 2027 date.Watershed Assistance Grants (Section 319)

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In New Hampshire: Apply through HSEM with a Letter of Intent. HSEM filed FMA planning sub-applications for FY2024, the state's first FMA application since FY2019. Ask HSEM for its state deadline, which comes before FEMA's.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In New Hampshire: Swift Current needs a flood-related major disaster declaration. New Hampshire's most recent is DR-4947 (Jun 10–11, 2026 severe storm and flooding, declared Oct 7, 2026, Carroll County). Ask HSEM whether New Hampshire qualifies.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In New Hampshire: DR-4812 (Jul 10–13, 2024 severe storms and flooding, declared Aug 20, 2024) made HMGP available statewide. DR-4947 (declared Oct 7, 2026) listed Public Assistance for Carroll County only and no HMGP as of mid-November 2026. Ask HSEM what HMGP money remains.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In New Hampshire: HSEM sent FEMA over $47.5M in FY2024–25 BRIC requests before the Jul 23, 2026 deadline, including construction for Barrington's Daniel Cater Road and Claremont's Grandy Brook drainage. Send new ideas to HSEM with a Letter of Intent.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In New Hampshire: EPA announced $9,457,000 for New Hampshire in May 2026. Ask NHDES's Drinking Water and Groundwater Bureau how it will be offered.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

New Hampshire NHDES runs the Clean Water and Drinking Water SRFs, wastewater State Aid Grants, the PFAS Remediation Grant and Loan Fund, Watershed Assistance (Section 319) grants and, with its advisory commission, the Drinking Water and Groundwater Trust Fund; the Community Development Finance Authority (CDFA) runs state CDBG; the Department of Safety's Division of Homeland Security and Emergency Management (HSEM) runs FEMA hazard mitigation.

Opening soon
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Next pre-application call expected spring 2027. In the 2025 cycle NHDES asked for proposals Mar 31 with pre-applications due May 30. Projects on the current list send final applications by the date in the plan (May 1 in the 2025 plan).
Funding
2025 plan: wastewater projects 2% to 15% forgiveness by affordability score; stormwater projects 15%; sewer extensions none. Planning: 100% forgiveness up to $100K. Energy audit measures: 50% up to $250K. Emerging contaminant (PFAS) money is 100% subsidy with no interest. Rates set Aug 1, 2024: 2.0% for 5 or 10 years, 2.88% for 15, 3.072% for 20 or 30.
Who
Municipalities, nonprofits and other local government entities
Pays for
Wastewater treatment, collection and pump stations; stormwater and MS4 projects; nonpoint source work; planning; landfill leachate and residuals PFAS work.

Only projects ranked from a pre-application get offered funds, and projects left off a list must reapply in the next round. Terms here are from the 2025 plan; NHDES posted 2026 draft plans for hearing in summer 2026 but its site blocked automated reading, so check the agency for current terms.

How NEER helps: Basis of design reports, I/I studies and stormwater plans built on calibrated models.

Opening soon
LoanGrant (principal forgiveness)Drinking water
Next date
Pre-applications are taken each spring (May 31 in 2024); next call expected spring 2027. Lead service line requests are accepted anytime.
Funding
2024 plan: 0.96% for 5 years, 1.92% for 10, 2.88% for 15, 3.072% for 20 (30 years for disadvantaged systems). Disadvantaged systems get forgiveness scaled to affordability. Lead service lines: 49% forgiveness. Emerging contaminant loans capped at $2.5M (disadvantaged) or $1M per project, fully subsidized. EPA's FY2026 lead line allotment for New Hampshire is $27,456,000.
Who
Municipal and privately owned community water systems; nonprofit non-transient non-community systems such as schools and hospitals
Pays for
Treatment, sources, storage, mains, consolidation, lead service line inventory, design and replacement, and PFAS and manganese treatment.

Terms shown are from the 2024 plan, the latest one we could open; check the agency for the current plan. Systems where fewer than half of homes are lived in six months a year get no subsidy. Every funded project needs an asset inventory and an asset management commitment. EPA also announced $9,457,000 in Emerging Contaminants in Small or Disadvantaged Communities grants for New Hampshire in May 2026.

How NEER helps: Lead service line material prediction; water system models for treatment and consolidation alternatives.

Check agency
GrantWastewater (sewer)Stormwater & floodDrinking water
Next date
Under the 2025 clean water plan, asset management applications were due May 1, 2026. The next deadline is set in the next plan; check the agency.
Funding
Clean water: grants or loans up to $30K at 100% subsidy for wastewater or stormwater asset management programs; $492,360 set aside in the 2025 plan. More may be offered for larger wastewater systems.
Who
Clean water: SRF-eligible communities and entities. Drinking water: community water systems.
Pays for
Building a wastewater, stormwater or drinking water asset management program.

NHDES must approve the scope before the full application. A finished program generally meets the clean water SRF fiscal sustainability plan requirement. The drinking water SRF also lists asset management grants among its set-aside uses; ask the Drinking Water and Groundwater Bureau for current terms.

How NEER helps: Asset inventories, condition scoring and capital plans.

GrantWastewater (sewer)
Next date
NHDES keeps a SAG priority list and holds a yearly hearing on it. Check the agency for the current call.
Funding
20% of annual principal and interest on eligible costs, plus up to 10% more where residential sewer fees run 20% above the state average; total state share capped at 50%. The FY2026–27 budget funds $2.5M a year, down from $15M a year in the prior budget.
Who
Municipalities with wastewater treatment, pumping, sewer or CSO separation projects
Pays for
Annual payments toward debt service on completed wastewater projects.

The grant pays out over the loan term, not up front. Collector sewers, land, easements and administrative, legal and financing costs are not eligible.

How NEER helps: CSO and capacity studies that define eligible work.

Drinking Water and Groundwater Trust Fund grants and loans

NHDES with the Drinking Water and Groundwater Advisory Commission
Check agency
GrantLoanMatch helpDrinking water
Next date
Check the agency for current rounds and deadlines.
Funding
The advisory board typically awards about 20% of the fund each year as grants and loans. The fund started with about $276M from the state's MtBE case against ExxonMobil, and PFAS settlement payments are now deposited in it.
Who
Public water systems, municipalities and water utilities
Pays for
Source water protection, emergency remediation, aging infrastructure, protection against future contamination, and cost-sharing for system design, construction and expansion, including PFAS mitigation.

Awards are competitive and need Governor and Council approval. The fund is expected to last until at least 2043.

How NEER helps: Source and system models for consolidation and treatment decisions.

Grant (grant first, then loan with forgiveness)LoanDrinking waterWastewater (sewer)
Next date
Check the agency.
Funding
Grant up to the greater of $1.5M or 30% of eligible cost, then low-interest loans. Up to 10% loan forgiveness ($5M total cap), and up to 50% more once settlement money is available.
Who
Municipalities, community water systems, nonprofit non-transient systems, and public or nonprofit wastewater and residuals facilities
Pays for
Treatment or other fixes needed to meet PFAS drinking water standards, or to treat wastewater effluent and residuals to meet PFAS standards.

Applicants must pursue the parties responsible for the contamination; later recoveries go to paying down the loan. NHDES estimated in 2026 that 42 community water systems over EPA PFAS limits would share about $14.7M in settlement money, applied first to existing NHDES loans.

How NEER helps: Treatment alternatives analysis and system models.

Watershed Assistance Grants (Section 319)

NHDES, Watershed Assistance Section
Next cycle
GrantStormwater & flood
Next date
2026 pre-proposals were due Sep 11, 2026 after a required consultation. Next round expected around September 2027.
Funding
About $540K expected statewide in the 2026 round, subject to federal funding
Who
Governmental subdivisions and nonprofits
Pays for
Projects in watershed-based plans that measurably reduce nonpoint source pollution, with preference for high-priority watersheds in the state's 2025–2029 nonpoint source plan.

Book the pre-proposal consultation with an NHDES project manager early. Round details come from an unofficial listing because NHDES's site blocked automated reading; check the agency. Stormwater planning funded by the clean water SRF is also reviewed by this section.

How NEER helps: Pollutant load modeling for watershed-based plans.

CDBG Public Facilities, Emergency and Planning grants

Community Development Finance Authority (CDFA)
Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Housing and Public Facilities Round 1 opens the first week of November and is due the last Monday in January at 4 pm (Jan 25, 2027 expected); Round 2 is due the last Monday in July. Emergency and planning grants are rolling until funds run out.
Funding
Public facilities up to $500K a year. Emergency: up to $350K (10,000 people or fewer) or $500K. Planning: up to $25K; transformative planning up to $100K.
Who
Non-entitlement towns, cities and counties. Manchester, Nashua, Portsmouth, Dover and Rochester get CDBG directly from HUD and are not eligible.
Pays for
Water and sewer improvements and other public facilities that mainly benefit low- and moderate-income people; planning grants pay for income surveys, preliminary engineering and cost estimates.

One emergency project per municipality per year. Regional projects need one primary applicant. Apply through nhcdfagrants.org. CDFA's key dates page is a standing schedule; confirm the 2027 dates with CDFA.

How NEER helps: Preliminary engineering for planning grants.

HSEM hazard mitigation intake (FMA, BRIC, HMGP)

NH Department of Safety, Homeland Security and Emergency Management (HSEM)
Rolling
GrantStormwater & flood
Next date
Send project ideas to HSEM anytime with its Letter of Intent form. Ask HSEM for its state deadline on FEMA rounds.
Funding
Passes through FEMA funds, generally 75% federal and 25% local
Who
New Hampshire communities with a FEMA-approved local hazard mitigation plan
Pays for
HSEM reviews Letters of Intent and helps selected communities build FEMA sub-applications.

For FY2024–25 BRIC, HSEM sent FEMA over $47.5M in requests, including construction for Barrington's Daniel Cater Road and Claremont's Grandy Brook drainage after earlier BRIC scoping. It also filed FMA planning sub-applications, the state's first FMA application since FY2019. The latest declaration, DR-4947 (Jun 10–11, 2026 flooding, declared Oct 7, 2026), covers Public Assistance in Carroll County only, with no HMGP listed as of mid-November 2026.

How NEER helps: Flood models and benefit-cost inputs for drainage and culvert projects.

Local and regional County and regional cost-share programs.

PREPA grants for watershed towns

Piscataqua Region Estuaries Partnership (PREP), UNH
Next cycle
GrantStormwater & floodDrinking water
Next date
The 2026–2027 window is closed; the next one is not announced.
Funding
$5,000 to $25,000 per project. No match required.
Who
The 52 cities and towns in the Piscataqua Region watershed, and watershed groups partnering with them
Pays for
Planning and regulatory work on stormwater, floodplains, septic systems, drinking water protection, wetlands and climate resilience.

Towns can hold more than one grant at once. The 2023–2024 cycle required at least 15% of the budget for community engagement.

How NEER helps: Stormwater and flood studies for town plans and ordinances.

Adapting Together: Climate Impact Grants

Piscataqua Region Estuaries Partnership (PREP), with NH Charitable Foundation
Next cycle
GrantStormwater & flood
Next date
The 2026 round closed in October 2026. Check PREP for the next round.
Funding
Up to $25,000 per project; $140,000 total in 2026. No match required.
Who
Governments, nonprofits and other fiscal agents, or adults working with one
Pays for
Community projects on tidal, riverine or stormwater flooding and extreme heat in public spaces. Not large infrastructure such as culvert replacements.

One application per community or organization. Strong community engagement is required.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. NHDES, Clean Water SRF 2025 Intended Use Plan, R-WD-25-09 (July 2025), copy hosted by the Southwest Environmental Finance Center
  21. NHDES, 2025 Clean Water SRF Priority List, copy hosted by the Southwest Environmental Finance Center
  22. NH RSA Chapter 486, State Aid for Water Pollution Control (incl. 486:14 revolving loan funds)
  23. NHDES, 2024 Drinking Water SRF Intended Use Plan, R-WD-24-08 (Sep 24, 2024), copy hosted by the Southwest Environmental Finance Center
  24. EPA, EPA Announces $27.5 Million to Reduce Lead in Drinking Water in New Hampshire (May 20, 2026)
  25. EPA, EPA Announces $9.5 Million for New Hampshire to Address PFAS in Drinking Water (May 2026)
  26. NH Municipal Association, State Budget: What's In It for Municipalities? (Town & City, Sep/Oct 2025)
  27. NH RSA Chapter 485-F, Drinking Water and Groundwater Trust Fund
  28. NHPR, More funding from PFAS settlements will be available for New Hampshire towns (Jun 8, 2026)
  29. NH RSA Chapter 485-H, PFAS Remediation
  30. GrantedAI listing, Watershed Assistance Grants (Section 319), NHDES, 2026 round (unofficial secondary listing)
  31. NH CDFA, Community Development Block Grant program
  32. NH CDFA, CDBG application key dates
  33. NH CDFA, CDBG eligibility
  34. City of Rochester, reposted HSEM release: New Hampshire Submits Millions of Dollars in Projects to Be Considered for Federal Resilience Funding (Aug 7, 2026)
  35. OpenFEMA, Disaster Declarations Summaries for New Hampshire since 2023 (refreshed Nov 13, 2026)
  36. FEMA, Public Notice, Major Disaster Declaration DR-4812-NH
  37. Piscataqua Region Estuaries Partnership, PREPA Grants
  38. Piscataqua Region Estuaries Partnership, Adapting Together: Climate Impact Grants