Colorado ยท Status checked November 16, 2026
CWCB Water Project Loan Program
Colorado Water Conservation Board
- Next date
- Requests under $30M: anytime. Requests over $30M: Aug 1, 2027 for the November board meeting, with money available the following July 1.
- Funding
- 30-year municipal rates of 3.35% (low income), 3.80% (middle income) or 4.30% (high income); 0.25% lower for 20 years, 1.30% lower for 10 years. 1.0% loan service fee. Minimum request of $100K recommended.
- Who can apply
- Any public or private entity that can contract with the state and show the project is technically, financially and institutionally feasible
- Pays for
- Design and construction of reservoirs, pipelines, diversions, wells, water rights purchases, flood control projects and hydropower.
- Tip
- A loan under $10M typically takes four to five months from application and feasibility study to money in hand. CWCB loans count as match for Water Plan Grants.
- How NEER helps
- Loan feasibility studies with system and flood models.
Program page Sources [1] [2]