Colorado ยท Status checked November 16, 2026

SRF planning grants and design and engineering grants

CDPHE, Colorado Water Resources and Power Development Authority, and DOLA

RollingGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Discussed at the SRF pre-qualification meeting; design and engineering grants start once the project needs assessment and environmental checklist are submitted
Funding
Planning grant up to $10K per project (conversion planning grant up to $25K); design and engineering grant up to $300K per project. Both pay 80% of invoices, with a 20% match.
Who can apply
Disadvantaged communities (10,000 or fewer people) whose project is on the current year's Project Eligibility List. Private nonprofit water systems can get planning grants but not design and engineering grants.
Pays for
Costs of meeting SRF requirements before a loan, and engineering design for the SRF project.
Tip
The 20% match on a design and engineering grant is paid back to you when the SRF loan is signed. Design and engineering grants expire after 18 months unless extended. If demand is higher than the money set aside, smaller communities go first.
How NEER helps
Planning studies and preliminary engineering backed by system models.

Program page Sources [1] [2] [3]

Sources

  1. Colorado Water Pollution Control Revolving Fund Intended Use Plan 2027
  2. Colorado Drinking Water Revolving Fund Intended Use Plan 2027
  3. CDPHE: State revolving fund loan information (eligibility survey, application steps and deadlines)