Maui County, Hawaii ยท Status checked November 16, 2026
Ho'okumu Hou CDBG-DR infrastructure and mitigation (2023 wildfires)
County of Maui Office of Recovery
- Next date
- Projects conditionally awarded in 2026 and added to the action plan. Amendment 3 was approved by HUD Sep 11, 2026. Check the agency for any further rounds.
- Funding
- $1.64B total grant: $400M infrastructure and public facilities, $213.8M mitigation set-aside. Water awards include West Maui wells and tanks at Launiupoko ($39.5M) and Honolua ($28.3M), Lahaina recycled water storage ($24M) and force main ($24.3M), sewer upsizing ($28M), pump stations 5 and 6 ($8.1M) and drainline replacement ($7.1M).
- Who can apply
- County departments and state agencies with wildfire recovery projects
- Pays for
- Gap funding, as a subsidy or loan, to repair, upgrade and build water, sewer, drainage and other infrastructure damaged or affected by the 2023 wildfires.
- Tip
- Projects must meet HUD CDBG-DR eligibility and environmental rules. Maui Department of Water Supply also has a programmatic DWSRF loan backed by the wildfire supplemental; see the Drinking Water SRF entry.
- How NEER helps
- Water and sewer models sized for rebuilt Lahaina housing.
Program page Sources [1] [2] [3]