Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Illinois · Status checked November 16, 2026

CDBG Public Infrastructure

Illinois Department of Commerce and Economic Opportunity (DCEO)

Next cycleGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 round ran May 4–Aug 27, 2026. Next round expected about the same window in 2027.
Funding
$300K–$1.5M per project, including up to $40K for activity delivery; about $25M in 2026; no match required
Who can apply
Non-entitlement cities, villages, townships and counties; at least 51% low-to-moderate income benefit. They can apply on behalf of a water or sanitary district or an unincorporated area.
Pays for
Water mains, sanitary sewers, storm sewers, combined sewer separation, and flood and drainage improvements in mainly residential areas.
Tip
Water and sewer projects need a rate of at least 1% of MHI per 5,000 gallons; storm sewer and drainage projects don't. One activity type per application. Prequalification and the technical assistance session were mandatory in 2026.
How NEER helps
Drainage and capacity studies that document the threat to health and safety.

Program page Sources [1] [2] [3]

Sources

  1. DCEO 2026 CDBG Guidebook, Section 3: Public Infrastructure
  2. DCEO 2026 CDBG Guidebook, Section 1: Objectives and eligible applicants
  3. CDBG Public Infrastructure Program FY26-1 listing (Grantable)