MWRD Green Infrastructure Partnership Program

Metropolitan Water Reclamation District of Greater Chicago

Open nowGrantStormwater & flood
Next date
Pre-applications due Dec 15, 2026; full applications Mar 5, 2027
Funding
A set rate per gallon of storage built, up to a set share of green infrastructure construction cost. MWRD hadn't published the rates on the page; check the agency.
Who can apply
Public entities that can sign an IGA with MWRD; projects inside MWRD boundaries and outside the 100-year floodplain on land the applicant owns or holds a permanent easement on
Pays for
Construction of green infrastructure beyond what local, state or federal rules already require.
Tip
Projects selected in 2027 need an executed IGA and finished design by Dec 31, 2027, a construction award by Oct 1, 2028 and completion by Dec 1, 2028. Projects already bid or built are not eligible.
How NEER helps
Stormwater models to size storage volume, which sets the reimbursement.

Program page Sources [1] [2] [3]