Cook County (Metropolitan Water Reclamation District of Greater Chicago), Illinois ยท Status checked November 16, 2026
MWRD Stormwater Partnership Program and Technical Assistance
Metropolitan Water Reclamation District of Greater Chicago
- Next date
- Pre-applications due Dec 15, 2026
- Funding
- Up to $4M per project over two years ($2M a year); partner pays at least 10% of eligible stormwater costs. Technical assistance has no cost share.
- Who can apply
- Public agencies in Cook County that can sign an intergovernmental agreement with MWRD
- Pays for
- Construction of stormwater infrastructure, including green infrastructure, for conceptual or shovel-ready projects. Technical assistance provides design help for a local flooding problem.
- Tip
- MWRD pays construction only: not engineering, design, construction management, land, or non-stormwater work such as water mains or full resurfacing. It reviews pre-applications as they arrive and gives feedback.
- How NEER helps
- Flood models and alternatives analysis to define the project.
Program page Sources [1] [2]