Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Cook County (Metropolitan Water Reclamation District of Greater Chicago), Illinois ยท Status checked November 16, 2026

MWRD Stormwater Partnership Program and Technical Assistance

Metropolitan Water Reclamation District of Greater Chicago

Open nowGrantStormwater & flood
Next date
Pre-applications due Dec 15, 2026
Funding
Up to $4M per project over two years ($2M a year); partner pays at least 10% of eligible stormwater costs. Technical assistance has no cost share.
Who can apply
Public agencies in Cook County that can sign an intergovernmental agreement with MWRD
Pays for
Construction of stormwater infrastructure, including green infrastructure, for conceptual or shovel-ready projects. Technical assistance provides design help for a local flooding problem.
Tip
MWRD pays construction only: not engineering, design, construction management, land, or non-stormwater work such as water mains or full resurfacing. It reviews pre-applications as they arrive and gives feedback.
How NEER helps
Flood models and alternatives analysis to define the project.

Program page Sources [1] [2]

Sources

  1. MWRD Stormwater Partnerships
  2. MWRD Stormwater Partnership Program pre-application 2026