Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Missouri · Status checked November 16, 2026

Engineering Report and Integrated Plan grants

Missouri DNR

RollingGrantWastewater (sewer)Drinking water
Next date
Engineering report grants: anytime, first come. Integrated Management Plan grant: Mar 1, 2027.
Funding
Clean water report up to $50K ($62.5K disadvantaged); drinking water report up to $30K ($37.5K); integrated plan up to $80K–$100K. 20% match.
Who can apply
Clean water report: 10,000 or fewer people. Drinking water report: 3,300 or fewer. Integrated plan: 20,000 or fewer.
Pays for
The planning study that a small community needs before it can apply for SRF construction money.
Tip
Fastest way to fund the study that unlocks a larger loan and grant.
How NEER helps
Engineering reports and integrated plans.

Program page Sources [1] [2]

Sources

  1. Missouri CWSRF FFY2026 Intended Use Plan
  2. Missouri DWSRF FFY2026 Intended Use Plan