North Carolina · Status checked November 16, 2026
SRF Emerging Contaminants (PFAS) study and construction funds
NC DEQ, Division of Water Infrastructure
- Next date
- Studies: rolling, with cut-offs Jan 11, 2027 and Mar 1, 2027 (subject to change). Construction: with the regular rounds; fall 2026 closed Sep 30, 2026, spring 2027 expected around Apr 30, 2027.
- Funding
- Studies: about $9M (drinking water) and $3.3M (clean water) for FY2026–27, up to $500K per applicant in each. Construction, fall 2026: about $2.8M (drinking water, up to $5M per applicant) and $2M (clean water, no per-applicant limit). All 100% forgiveness.
- Who can apply
- Local government units; nonprofit water corporations; investor-owned companies for the drinking water side
- Pays for
- PFAS planning, alternatives analysis, design and pilot or bench testing; construction of PFAS treatment in drinking water, wastewater and publicly owned landfills.
- Tip
- Construction applications get two scores, one for EC money and one for base SRF money, so claim all eligible priority points. Spring 2026 offered more construction money (about $10M and $4M) than fall.
- How NEER helps
- Treatment alternatives and system models for PFAS studies.
Program page Sources [1] [2] [3] [4]