North Carolina · Status checked November 16, 2026
NCEM hazard mitigation intake (HMGP, FMA, BRIC)
North Carolina Emergency Management, Hazard Mitigation Section
- Next date
- FMA Swift Current (DR-4889, Tropical Depression Chantal): state intake closed Oct 16, 2026; final sub-applications due in FEMA GO by 5 p.m. Jan 8, 2027. FY2026 FMA: state deadline not posted; check NCEM. BRIC FY2024–25 letters of interest closed Jun 12, 2026.
- Funding
- Passes through FEMA funds. Swift Current: $20M, up to 100% for severe repetitive loss, 90% repetitive loss, 75% other. BRIC FY2024–25: up to $150M to the state; 75% federal, and NCEM suggests a 70/30 split for overmatch points.
- Who can apply
- Local governments and tribes with a FEMA-approved hazard mitigation plan; for FMA, NFIP communities in good standing. Homeowners take part through their county or city.
- Pays for
- Acquisition, elevation and mitigation reconstruction of flood-prone homes; infrastructure such as culvert replacement, stream restoration, drainage and water and wastewater protection.
- Tip
- Letters of interest and sub-applications go through NCEM's Salesforce portal before FEMA GO. BCAs must reach 1.0; NCEM recommends hiring someone experienced with FEMA's BCA Toolkit. Helene HMGP (DR-4827) infrastructure sub-applications went to FEMA in Mar–Apr 2026, and NCEM posts each project's status.
- How NEER helps
- Benefit-cost analysis inputs from flood models; hazard mitigation plan action items.