North Carolina ยท Status checked November 16, 2026
State Reserve Program construction grants and loans
NC DEQ, Division of Water Infrastructure
- Next date
- Offered in the fall round. Fall 2026 closed Sep 30, 2026; fall 2027 expected around Sep 30, 2027.
- Funding
- Fall 2026: about $10M in grants, shared with the planning grants. Up to $3M per project type (drinking water or wastewater) every three years. Grant share set by the Affordability Calculator. No State Reserve loans in fall 2026.
- Who can apply
- Local government units, nonprofit water corporations and investor-owned drinking water companies, when other funding is not reasonably available
- Pays for
- State-funded construction for drinking water sources, treatment, distribution and storage, and wastewater treatment and collection.
- Tip
- DWI says State Reserve loans may return in later rounds.
- How NEER helps
- Engineering reports and models that size the project.
Program page Sources [1] [2]