Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
North Dakota ยท Status checked November 16, 2026

BND Infrastructure Revolving Loan Fund

Bank of North Dakota

Next cycleLoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Not accepting applications. Check the agency.
Funding
2.00% fixed, up to 30 years or the project's useful life. Up to $20M outstanding combined with the Legacy Infrastructure Loan Fund.
Who can apply
Political subdivisions, the Garrison Diversion Conservancy District and the Lake Agassiz Water Authority
Pays for
Water and wastewater plants, sewer and water lines and lift stations, stormwater including curb and gutter, water storage, and roads and other public infrastructure.
Tip
Gap funding: applicants must try other state and federal sources first. Water projects need DWR review, and the Commission's policy requires its approval before applying to BND.
How NEER helps
Capital plans and models that size the project.

Program page Sources [1] [2]

Sources

  1. Bank of North Dakota: BND Infrastructure Revolving Loan Fund
  2. State Water Commission Cost-Share Policy, Procedures and General Requirements (effective May 12, 2025)