Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Clark County, Nevada · Status checked November 16, 2026

Regional Flood Control District Ten-Year Construction Program

Clark County Regional Flood Control District

Check agencyGrantStormwater & flood
Next date
FY2027 to FY2036 program adopted Jun 11, 2026. Next update expected June 2027.
Funding
About $1.07B over ten years from a quarter-cent sales tax and planned bonds. FY2026–27 capital budget $500.1M. Local Drainage Program: $3.28M for FY2027.
Who can apply
Clark County and its cities, as lead entities for Master Plan facilities in their hydrographic areas
Pays for
Design and construction of regional detention basins, channels and storm drains in the adopted flood control Master Plans; local drainage projects under a separate program.
Tip
Projects must be in the Master Plan and on the program; lead entities score their own projects. Entity Advance Funding lets a city or county build early and be repaid, up to a $40M cap, for projects in the first three years of the program. No local drainage requests were made in FY2026.
How NEER helps
Master plan hydrology and storm drain models for project design.

Program page Sources [1]

Sources

  1. Clark County Regional Flood Control District: Ten-Year Construction Program FY2027 through FY2036 (adopted Jun 11, 2026)