Pennsylvania · Status checked November 16, 2026
PENNVEST Clean Water SRF, incl. stormwater
Pennsylvania Infrastructure Investment Authority (PENNVEST) with DEP
- Next date
- Feb 3, 2027 application cut-off for the Apr 21, 2027 board meeting; next cut-off May 5, 2027 (board date not set)
- Funding
- Loans at county cap rates, 1% minimum. Standard term 20 years, up to 30 (40 for some start-up systems). Caps: $11M for one municipality, $20M for two or three, more with board approval. At least 20% of the FFY2026 base grant goes out as additional subsidy.
- Who can apply
- Public or private entities with eligible water quality projects
- Pays for
- Wastewater treatment and collection, and stormwater: new or upgraded storm sewers, separating storm from sanitary sewers, detention basins, and other work to manage, reduce, treat or recapture stormwater.
- Tip
- Grants and principal forgiveness go where the resulting user rate would exceed PENNVEST's affordable target (0.5%–1.25% of adjusted MHI), are prorated across projects at each meeting, and aren't given if they'd cut the annual rate by less than $15. For stormwater, PENNVEST assumes a community can afford 0.25% of MHI for debt service. Talk to a regional project specialist before applying.
- How NEER helps
- Calibrated sewer and stormwater models for the project's design basis; I/I and capacity studies.
Program page Sources [1] [2] [3] [4]