Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
South Dakota ยท Status checked November 16, 2026

CDBG-DR Local Infrastructure Recovery and Resiliency (2024 flood, Union County)

South Dakota Governor's Office of Economic Development (GOED)

Check agencyGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
One competitive round planned after GOED publishes a notice of funding availability. Check the agency.
Funding
$14.1M of the state's $15.4M HUD allocation for DR-4807; GOED expects 2 to 5 projects
Who can apply
Local governments and school districts in ZIP codes 57038 and 57049 in Union County, around North Sioux City
Pays for
Repair and hardening of stormwater, water and wastewater systems, lift stations and other public infrastructure tied to the June 2024 flood, with mitigation in every design.
Tip
At least 70% of the money must benefit low- and moderate-income residents. Scoring favors ready projects with completed design and permits.
How NEER helps
Flood and stormwater models to define the mitigation component.

Program page Sources [1] [2]

Sources

  1. GOED: CDBG Disaster Relief funds (DR-4807)
  2. GOED: CDBG-DR Action Plan for the 2024 disaster, approved by HUD