CDBG (water, sewer and drainage)

Tennessee Department of Economic and Community Development

Opening soonGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2027 round expected in spring 2027. The 2026 round closed Apr 10, 2026 and the 2025 round Mar 28, 2025.
Funding
Up to $1M for construction, $420K for equipment. Local match 5% to 25% by ability to pay.
Who can apply
Non-entitlement cities and counties, one application each; not those with an open regular round grant
Pays for
Water and sewer system improvements, water and sewer line extensions, and community infrastructure, which includes drainage and flood control.
Tip
Water and sewer system projects are limited to systems with 2,500 or fewer residential connections. Line extensions need 100% response on income surveys. The local resolution must be executed before you apply. ECD held the 2027 public meeting on Oct 22, 2026; the 2027 notices weren't posted when checked.
How NEER helps
Engineering reports and drainage studies to document need.

Program page Sources [1] [2] [3]