Utah ยท Status checked November 16, 2026
Board of Water Resources revolving loans and secondary meter funding
Utah Division of Water Resources, Board of Water Resources
- Next date
- Next application deadline Jan 8, 2027 for the Mar 17, 2027 Board meeting. Later 2027 deadlines: Mar 5, Apr 16, Jun 4, Jul 23, Oct 1.
- Funding
- Board share up to 85% of non-grant costs, 15 to 25 years. About 3% for culinary or secondary projects over $1M, 1% for agricultural and secondary meter projects, 0% for some projects under $1M. Small secondary systems: 50% grant cost share, limited.
- Who can apply
- Cities, towns, water districts, water and irrigation companies and tribes. Not developers or individuals.
- Pays for
- Culinary, secondary and irrigation water projects such as pipelines, wells, storage tanks, dam safety upgrades, flood control and diversion structures, and secondary water meters.
- Tip
- Routine O&M and systems where fewer than half of residents live year-round aren't eligible. A project goes to the Board twice: once for authorization and again for committal after design and a water conservation plan. Most projects also need to be in the Unified Water Infrastructure Plan.
- How NEER helps
- Water system and flood control models for the feasibility report.
Program page Sources [1] [2] [3]