Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Utah ยท Status checked November 16, 2026

Board of Water Resources revolving loans and secondary meter funding

Utah Division of Water Resources, Board of Water Resources

RollingLoanGrant (limited grants for small secondary systems)Drinking waterStormwater & flood
Next date
Next application deadline Jan 8, 2027 for the Mar 17, 2027 Board meeting. Later 2027 deadlines: Mar 5, Apr 16, Jun 4, Jul 23, Oct 1.
Funding
Board share up to 85% of non-grant costs, 15 to 25 years. About 3% for culinary or secondary projects over $1M, 1% for agricultural and secondary meter projects, 0% for some projects under $1M. Small secondary systems: 50% grant cost share, limited.
Who can apply
Cities, towns, water districts, water and irrigation companies and tribes. Not developers or individuals.
Pays for
Culinary, secondary and irrigation water projects such as pipelines, wells, storage tanks, dam safety upgrades, flood control and diversion structures, and secondary water meters.
Tip
Routine O&M and systems where fewer than half of residents live year-round aren't eligible. A project goes to the Board twice: once for authorization and again for committal after design and a water conservation plan. Most projects also need to be in the Unified Water Infrastructure Plan.
How NEER helps
Water system and flood control models for the feasibility report.

Program page Sources [1] [2] [3]

Sources

  1. Utah Division of Water Resources: Board funding (meeting schedule and deadlines)
  2. Utah Division of Water Resources: Water Project Funding overview (rev. 5/25)
  3. Utah Division of Water Resources: Secondary meter grants