Washington ยท Status checked November 16, 2026
Clean Water SRF loans (Water Quality Combined Funding Program)
Washington State Department of Ecology, Water Quality Program
- Next date
- SFY2028 applications closed Sep 30, 2026 (172 applications, $664.5M requested). Draft offer list by Jan 31, 2027, then a public comment period. Next application window expected Aug to Sep 2027.
- Funding
- SFY2027: $99.0M in loans, including about $30.0M forgivable principal (incl. $3.8M for emerging contaminants). SFY2027 standard rates: 1.2% (5 yr), 2.5% (20 yr), 3.3% (30 yr). Hardship wastewater construction: 50% to 100% forgivable principal or Centennial grant, up to $5M per project.
- Who can apply
- Public bodies such as cities, counties, and sewer and water districts; tribes; nonprofits for some nonpoint source work
- Pays for
- Planning, design and construction of wastewater and stormwater facilities, large onsite systems, onsite sewage repair loan programs and nonpoint source projects.
- Tip
- One application covers CWSRF, Centennial, SFAP and Section 319. Construction hardship needs a service area of 25,000 or fewer and sewer fees of 2% or more of MHI. Preconstruction hardship (up to 50% subsidy) needs 25,000 or fewer and MHI under 80% of the state's. Ecology scores readiness to start within 10 months of the final list. Emergency loans may be available for public wastewater systems serving 10,000 or fewer with a declared local emergency. The SFY2027 list also included $8.0M in Puget Sound Nutrient Reduction grants (up to $350K per plant) and $945K in OSG grants. Terms shown are from SFY2027; confirm in the SFY2028 list.
- How NEER helps
- General sewer plans and facility plans built on calibrated sewer models; I/I and capacity studies.
Program page Sources [1] [2] [3]