Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Washington ยท Status checked November 16, 2026

EMD hazard mitigation intake (FMA, BRIC, HMGP)

Washington Military Department, Emergency Management Division

Open nowGrantStormwater & flood
Next date
FMA Swift Current: pre-applications were due Oct 2, 2026 and are still taken on a rolling basis; Step 2 packages due Dec 11, 2026. EMD says new rounds are expected each fall.
Funding
Passes through FEMA funds. For Swift Current, the state pays the full non-federal share of acquisitions and half of it (up to 12.5%) for elevation and other projects.
Who can apply
Local governments, tribes and special districts with a FEMA-approved hazard mitigation plan; NFIP communities in good standing for FMA
Pays for
Flood acquisitions, elevations, floodproofing and other mitigation. BRIC 2024/25 and FMA 2024 Amended applications are now with FEMA.
Tip
Swift Current is for NFIP-insured repetitive loss, severe repetitive loss or substantially damaged properties insured by Sep 14, 2026. Email HMA@mil.wa.gov for the list of eligible properties and to join the funding notice list.
How NEER helps
Flood models and benefit-cost support for mitigation applications.

Program page Sources [1] [2] [3] [4] [5] [6]

Sources

  1. Washington EMD: Hazard mitigation grants
  2. Washington EMD: FMA 2026 Swift Current
  3. Washington EMD: FMA 2026 Swift Current Grant Guidance (Sep 3, 2026, via GovDelivery)
  4. Washington EMD bulletin: Notice of Funding Opportunity, FMA24 Amended (May 29, 2026)
  5. Washington EMD: DR-4759/DR-4775 HMGP
  6. OpenFEMA: Disaster Declarations Summaries, Washington, June 2025 to November 2026