Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Washington · Status checked November 16, 2026

Floodplains by Design grants

Washington State Department of Ecology

Awaiting NOFOGrantStormwater & flood
Next date
2027–29 applications closed May 13, 2026, and the ranked list was due in August 2026. The Legislature decides in April or May 2027; offers in June 2027; agreements start about Jul 1, 2027.
Funding
Set by the Legislature. 2025–27: $75.7M for nine projects. Soft cap of $10M per grant. No match required.
Who can apply
Counties, cities, towns, special purpose districts such as flood control districts, tribes, conservation districts, ports and nonprofits
Pays for
Projects that combine flood hazard reduction with ecosystem restoration: planning, studies and modeling, design, permitting, construction, acquisitions, and home elevation or relocation.
Tip
For 2027–29 the pre-application opened Nov 1, 2025, about 20 months before grants started. Check the agency for 2029–31 dates.
How NEER helps
Floodplain and hydraulic models for pre-construction studies and alternatives.

Program page Sources [1]

Sources

  1. Ecology: Floodplains by Design grants