Wisconsin · Status checked November 16, 2026

WEM hazard mitigation intake (FMA, BRIC, HMGP)

Wisconsin Emergency Management, Hazard Mitigation Section

Check agencyGrantStormwater & flood
Next date
No open FEMA hazard mitigation application periods in Wisconsin as of Nov 19, 2026; ask WEM about FY2026 FMA before FEMA's Feb 26, 2027 deadline
Funding
Passes through FEMA funds. HMGP is 75% federal and 12.5% state, leaving 12.5% local.
Who can apply
Wisconsin local governments and tribes with a FEMA-approved hazard mitigation plan; NFIP participation in good standing for HMGP and FMA
Pays for
WEM sets HMGP priorities from the State Mitigation Plan: buyouts of flood-prone structures first, then elevation, safe rooms, utility protection and stormwater projects. FMA and BRIC sub-applications go in FEMA GO.
Tip
FEMA denied HMGP for DR-4892 (Aug 9–12, 2025 flooding, Individual Assistance only in Milwaukee, Washington and Waukesha counties), for the April 2026 storms, and for DR-4949 (Jul 27, 2026 tornado, declared Oct 7, 2026). The governor appealed the DR-4949 HMGP denial Nov 19, 2026. An HMGP project need not be in a declared county.
How NEER helps
Flood modeling and benefit-cost analysis.

Program page Sources [1] [2] [3] [4]

Sources

  1. Wisconsin Emergency Management, Mitigation Grants
  2. Gov. Evers appeals FEMA denial of Hazard Mitigation for July 2026 storms (Nov 19, 2026)
  3. FEMA, Wisconsin Severe Storms, Straight-line Winds, Flooding, and Mudslides (DR-4892)
  4. FEMA, Wisconsin Severe Storms and Tornadoes (DR-4949)