Water Development Program (Level I, II and III, new development and rehabilitation)

Wyoming Water Development Office and Commission

Opening soonGrantLoanDrinking water
Next date
Level I and II study applications due Mar 1, 2027. Level III construction applications due Sep 1, 2027. Preliminary funding recommendations at the November Commission meeting.
Funding
Level I and II studies are 100% state funded. Level III: grant typically up to 67%, up to 75% for severe hardship, rest as a loan. Loans at a 4% statutory minimum, up to 50 years. $1,000 application fee, 75% refunded if denied.
Who can apply
Public entities that can take state money and incur debt, such as municipalities, joint powers water boards and water and sewer districts
Pays for
Master plans, feasibility studies, design and construction of water supply: wells, transmission lines, storage and rehabilitation of systems at least 15 years old. Municipal and rural domestic projects need at least 20 metered taps.
Tip
The program does not fund wastewater, distribution systems, most water treatment plants or projects that are only flood control. Level III money needs legislative approval in the omnibus water bill. Complete a current Public Water System Survey before applying.
How NEER helps
Water master plans and system models for Level I and II studies.

Program page Sources [1] [2] [3]

Sources

  1. Wyoming Water Development Commission: Project application information
  2. Operating Criteria of the Wyoming Water Development Program (approved Aug 8, 2024)
  3. Wyoming Water Development Commission: Calendar