West Virginia Infrastructure and Jobs Development Council, with the Water Development Authority
Rolling
GrantLoanDrinking waterWastewater (sewer)
- Next date
- Monthly. A complete preliminary application filed by the 10th goes on the Council agenda about two months later. Next cutoff expected Dec 10, 2026 for the Feb 2027 meeting; the 2027 schedule was still a draft on the Dec 2, 2026 agenda.
- Funding
- Grants are capped at 50% of project cost by statute. Grant guidance: up to $500K when user rates are 1.50%–1.99% of MHI, up to $1M at 2% or more. 20-year loans at 3.00% under the 2022 rate resolution.
- Who
- Municipalities, public service districts and other public water and sewer sponsors
- Pays for
- Water and sewer extensions, treatment plants, line replacement and system improvements. The same application is the entry point for SRF, CDBG and ARC money.
Every sponsor needs an IJDC-certified administrator, engineer and accountant to file the three-part online application; review takes about 45 days. Applications filed after Jun 10, 2026 must use 2025 MHI data. Engineering design advances are possible once a project is found feasible, and soft cost grants up to $125K cover legal and accounting costs other funders won't. Under the Aug 2026 Clean, Clear Water Strategy, Marshall, WVU and the 11 regional councils give small systems grant-writing help, and projects under binding commitment move to 60-day reviews.
How NEER helps: Preliminary engineering reports backed by water and sewer models.
West Virginia Infrastructure and Jobs Development Council
Rolling
GrantLoanDrinking waterWastewater (sewer)
- Next date
- As needed; the Funding Committee chair can act between Council meetings
- Funding
- Line extensions must cost under $2M; the sponsor may provide 10%. Other awards set case by case.
- Who
- Water and sewer sponsors facing a sudden loss of service, a failing system component they can't afford to fix, or a critical-need line extension
- Pays for
- Emergency restoration of service, repair or replacement of failed components, and short line extensions to people without safe water.
Use the Critical Needs and Crisis Situation application form on the IJDC policies page. Policies were last amended Aug 5, 2026.
How NEER helps: Quick condition assessments and hydraulic checks to scope the fix.
WVDEP, Division of Water and Waste Management, with the Water Development Authority
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- FY2027 plan runs Jul 1, 2026 to Jun 30, 2027. Funds go first come, first served by priority rank to projects within six months of construction. New projects can be added to the list after about 60 days of public notice. FY2028 draft plan expected June 2027.
- Funding
- FY2027: about $162M available. Principal forgiveness up to the lesser of 50% or $1.5M (40+ points) or 100% or $2M (70+ points). Green stormwater and energy projects up to 50% or $500K forgiveness. Loans 0.25% to 2.75% plus 0.25% fee, up to 40 years.
- Who
- Local governmental entities such as municipalities and public service districts; MS4s for green stormwater projects
- Pays for
- Wastewater treatment, collection systems, CSO and I/I work, stormwater, decentralized systems, design loans and PFAS-related emerging contaminant projects.
A project needs an IJDC funding recommendation and must be on the priority list before a commitment. Forgiveness points come from rate as a share of MHI, unemployment, population loss, poverty, and serving unserved areas. Emerging contaminant money ($3.3M) may move to drinking water if unused by June 2027.
How NEER helps: Facility plans built on calibrated sewer models; I/I, CSO and stormwater studies.
WVDEP, with the Office of Environmental Health Services and the Water Development Authority
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- FY2027 plan runs Jul 1, 2026 to Jun 30, 2027. Ready projects get commitments by priority rank; new projects can be added after about 60 days of public notice. FY2028 draft plan expected June 2027.
- Funding
- FY2027: about $136M available. Forgiveness up to the lesser of 50% or $1M (40+ points) or 100% or $1.5M (70+ points). Lead line loans at 0%, with about $68.3M available and 49% as forgiveness. Emerging contaminants: $7.67M, all forgiveness.
- Who
- Public water systems; at least 25% of emerging contaminant money goes to disadvantaged systems or those serving under 25,000
- Pays for
- Treatment plants, distribution upgrades, extensions, lead service line inventories and replacement (both sides, including galvanized lines downstream of lead), and PFAS treatment.
The fund moved from the Bureau for Public Health to WVDEP on Jul 1, 2023. Projects only for growth or fire protection are not eligible. Free help with lead line inventories is available through WV RCAP, Stantec and the WV Rural Water Association, depending on system size.
How NEER helps: Lead service line material prediction; water system models for plant and PFAS alternatives.
West Virginia Water Development Authority
Rolling
GrantMatch helpDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- No deadline; the WDA Board meets as needed
- Funding
- Created with $427M in ARPA money in 2022. Bid overrun grants up to $10M can be approved by staff and the Board chair. Recent awards: $14.4M to Mason County PSD and $2M to Parkersburg Utility Board for PFAS treatment (June 2026).
- Who
- Government agencies and nonprofits that provide annual audits
- Pays for
- Matching grants for federal awards, bid overrun grants, sewer and water extensions for housing and economic development, and stormwater projects.
Water, sewer and stormwater projects need an IJDC recommendation first. The WDA also posts a separate non-federal match application for congressionally directed spending. Apply by email and in the state's wvOASIS vendor portal.
How NEER helps: Engineering reports and models that support the IJDC recommendation.
West Virginia Division of Economic Development, Community Advancement and Development
Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- FY2026 infrastructure applications due Jan 15, 2027. IJDC review documents due by Feb 15, 2027. Planning applications accepted year-round.
- Funding
- Up to $3M per water, sewer or stormwater project; planning grants up to $500K. About $10.7M set aside for infrastructure in FY2026.
- Who
- Cities, towns and counties; at least 51% of service area residents low- and moderate-income
- Pays for
- Construction of water, sewer and stormwater infrastructure, and planning tied to it.
Match isn't required but earns points. Use HUD's 2016–2020 LMI data or an income survey; applications using other data aren't scored. Hold both public hearings before applying. Water and sewer projects need the IJDC feasibility letter and technical review memo.
How NEER helps: Preliminary engineering reports and service area maps for the application.
West Virginia Division of Economic Development, Community Advancement and Development
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- FY2026 cycle opened January 2026 and closed March 2026. FY2027 cycle expected to open around January 2027 with a March deadline.
- Funding
- ARC share up to 80% in distressed counties, 70% in at-risk counties, 30% in competitive counties and 50% elsewhere
- Who
- Public or quasi-public owners such as cities and PSDs; the 11 regional planning and development councils administer construction grants
- Pays for
- Water, wastewater and stormwater are the state's high priority, with industrial site development.
Projects in distressed counties get the highest priority. FY2026 distressed counties: Braxton, Calhoun, Clay, Lincoln, Logan, McDowell, Mingo, Roane, Webster, Wirt and Wyoming. ARC money can match CDBG and IJDC funds on the same project.
How NEER helps: Engineering reports that show the economic benefit of the water or sewer project.
WVDEP, Office of Abandoned Mine Lands and Reclamation
Next cycle
GrantDrinking waterWastewater (sewer)
- Next date
- 2026 applications closed Jul 10, 2026. 2027 cycle expected to open in May 2027.
- Funding
- More than $268M committed since 2016. No per-project cap stated; check the agency.
- Who
- Projects on or next to coal mine sites abandoned before Aug 3, 1977, in communities affected by legacy mining
- Pays for
- Economic development projects, including water and sewer extensions that open land for jobs or housing.
Name the closest e-AMLIS Problem Area on the application. AMLER has been combined with IJDC, ARC and EDA money on water extensions, such as McDowell County PSD's Jolo project.
How NEER helps: Water and sewer extension designs and maps for the application.
West Virginia Emergency Management Division
Check agency
GrantStormwater & flood
- Next date
- No WVEMD intake date posted. HMGP follows each major disaster that includes it; ask WVEMD what is open.
- Funding
- Passes through FEMA funds; usually 75% federal and 25% local. NFIP repetitive loss properties can reach 90% and severe repetitive loss 100% under FMA.
- Who
- State and local governments with an approved hazard mitigation plan; all West Virginia regions had approved plans in 2025
- Pays for
- Flood control and drainage, acquisitions and elevations, utility protection such as raising pump stations, landslide stabilization, project scoping and plan updates.
Register in EM Grants (wv.emgrants.com). For water and sewer hazard mitigation projects, the IJDC can grant the local match and costs FEMA won't pay. Recent declarations: DR-4861 (Feb 2025 flooding, HMGP in 12 counties), DR-4932 (Jul 2026 flooding, 11 counties) and DR-4953 (Aug 2026 flooding in Fayette, Kanawha and Harrison); FEMA data showed no HMGP for the 2026 floods when checked.
How NEER helps: Flood models and benefit-cost analysis for mitigation projects.
West Virginia State Resiliency Office
Awaiting NOFO
GrantStormwater & flood
- Next date
- No application process announced; check the agency
- Funding
- $5M appropriated for FY2027, received in August 2026
- Who
- Municipalities and other political subdivisions that meet Community Rating System requirements, or agree to within 24 months
- Pays for
- Local flood protection and prevention. By statute, 50% goes to low-income areas and 50% to nature-based solutions, with a quarter of that for buyouts, relocation or floodplain restoration.
The director told lawmakers in August 2026 that the statute's limits make the fund hard to use and asked for changes. Joining FEMA's Community Rating System now keeps a community eligible.
How NEER helps: Floodplain and nature-based solution studies.