Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Alabama water infrastructure funding

Federal, state and local grants and loans that communities in Alabama can use for drinking water, wastewater and stormwater projects.

20Grant programs
4Loan programs
13Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 20Loans 4Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 3, 2026
    Watch
    ADECA PY2026 CDBG compliance workshopMontgomery and online, 9 a.m. to 3 p.m. In-person registration by 4 p.m. Dec 1.CDBG Competitive, Community Enhancement and Planning funds
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. Dec 14, 2026
    Deadline
    SCRC FY2027 SEID pre-applications dueSoutheast Crescent Regional Commission grants of $50K to $1M for 13 south Alabama counties. Full applications due Feb 22, 2027.Southeast Crescent Regional Commission SEID grants
  4. Dec 31, 2026
    Watch
    Alabama ARPA water and sewer money must be spentADEM's SRF Section runs the ARPA projects and plans to focus on SRF projects after this deadline.Clean Water SRF loans and principal forgiveness
  5. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  6. Jan 2027estimate
    Expected
    ADEM Section 319 FY2028 request for proposalsThe FY2027 request was posted Jan 14, 2026. Proposals need a pre-application consultation with the NPS Unit.Section 319 nonpoint source watershed grants
  7. Feb 22, 2027
    Deadline
    SCRC FY2027 SEID full applications dueStates may set an earlier date; confirm with ADECA.Southeast Crescent Regional Commission SEID grants
  8. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  9. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  10. Mar 2027estimate
    Expected
    Alabama GOMESA project callThe 2026 call opened in late March and closed May 29, 2026.State of Alabama GOMESA grants
  11. Late Mar 2027estimate
    Expected
    ACAMP FY2028 coastal proposals dueFY2027 proposals were due Mar 27, 2026. Mobile and Baldwin counties only.Alabama Coastal Area Management Program grants
  12. Apr 2027estimate
    Expected
    ADECA PY2027 CDBG application workshopThe PY2026 workshop was Apr 24, 2026, and ADECA announces the application deadline there.CDBG Competitive, Community Enhancement and Planning funds
  13. Jul 2027estimate
    Expected
    ADECA PY2027 CDBG applications duePY2026 applications were due Jul 22, 2026 at noon, on paper (an original and two copies).CDBG Competitive, Community Enhancement and Planning funds
  14. Late Jul 2027estimate
    Expected
    Delta Regional Authority 2027 SEDAP applications dueThe 2026 notice came out Jun 1 and closed Jul 31, 2026.Delta Regional Authority SEDAP grants
  15. Late Sep 2027estimate
    Expected
    ADECA FY2028 ARC applications dueFY2027 applications were due Sep 25, 2026 at noon.Appalachian Regional Commission grants

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Alabama: Apply through AEMA's Recovery Division. AEMA had not posted an FY2026 FMA intake when checked; ask AEMA for its deadline, which will come before FEMA's Feb 26, 2027 deadline.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Alabama: Alabama's last major disaster declarations with HMGP were DR-4684 (January 2023 storms) and DR-4710 (March 2023 storms). Hurricane Isaias brought an emergency declaration (EM-3656, Oct 9, 2026), and Gov. Ivey asked for a major disaster declaration for 23 counties on Oct 23, 2026. If it is approved, ask AEMA about HMGP.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Alabama: AEMA runs BRIC in Alabama. Its Safeguarding Tomorrow loan fund plan would cover the local match but needed legislative authority first.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Alabama: EPA allotted Alabama $878K from FY2025 and FY2026 funds in April 2026. Ask ADEM how and when it will offer them.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Alabama ADEM runs the Clean Water and Drinking Water SRFs and the Section 319 nonpoint source grants; ADECA runs CDBG and administers the Appalachian Regional Commission, Delta Regional Authority and Southeast Crescent Regional Commission programs in Alabama; ADCNR runs GOMESA and coastal grants; the Alabama Emergency Management Agency (AEMA) runs hazard mitigation.

Clean Water SRF loans and principal forgiveness

Alabama Department of Environmental Management (ADEM), SRF Section
Rolling
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Preapplications (Form 340) accepted anytime; the priority list is updated up to 4 times a year. No FY2026 plan posted yet; check the agency.
Funding
FY2025 plans: base grant $17.74M with $3.55M to $7.10M in forgiveness; IIJA supplemental grant $27.55M with $13.50M (49%) in forgiveness; $2.38M emerging contaminant grant at 100% forgiveness. 0.1% interest plus a 1.89% to 2.65% fee (no fee on 100% forgiveness loans). 20-year terms; 30 years in special cases.
Who
Any public body: counties, state agencies, cities and towns, boards and authorities
Pays for
Wastewater treatment, sewer rehabilitation, interceptors and pump stations, decentralized treatment, green infrastructure, stormwater, streambank restoration and nonpoint source projects.

Forgiveness goes in priority-list rank order using a county poverty, unemployment and population-trend measure; the highest-ranked green infrastructure project also gets forgiveness. ADEM says a loan typically closes about 6 months after preapplication. ARPA water and sewer money run by the same SRF Section must be spent by Dec 31, 2026, and ADEM plans to shift its focus to SRF projects after that. EPA announced an $878K Sewer Overflow and Stormwater Reuse (OSG) allotment for Alabama in April 2026; ask ADEM how it will be offered.

How NEER helps: Preliminary engineering reports built on calibrated sewer models; I/I and capacity studies; stormwater models for green infrastructure projects.

Drinking Water SRF, incl. lead service lines and emerging contaminants

Alabama Department of Environmental Management (ADEM), SRF Section
Rolling
LoanGrant (principal forgiveness)Drinking water
Next date
Preapplications (Form 370) accepted anytime; the priority list is updated up to 4 times a year. No FY2026 plan posted yet; check the agency.
Funding
FY2025 plans: base grant $19.26M with $5.01M to $9.44M in forgiveness; IIJA supplemental grant $43.96M with at least $21.54M in forgiveness; lead service line funds $54.95M at 49% forgiveness ($26.93M); emerging contaminant funds $13.58M at 100% forgiveness. 0.1% interest plus a 1.89% to 2.65% fee. 20-year terms; 30 years in special cases.
Who
Public water systems owned by public bodies: counties, cities and towns, water boards and authorities
Pays for
Treatment, wells, storage, transmission and distribution mains, consolidation and interconnection, lead service line inventory and full replacement, and treatment for emerging contaminants such as PFAS.

A system counts as disadvantaged when it scores more than 1 point on population under 10,000 and coverage ratio under 1.1x, or when its water bill to median household income ratio is above 1. Lead line projects must replace the whole line to the premise plumbing. Projects mainly for future growth are not eligible.

How NEER helps: Lead service line material prediction; water system models for consolidation and capacity studies.

Check agency
GrantStormwater & flood
Next date
FY2027 request for proposals posted Jan 14, 2026; it requires a pre-application consultation and lists no due date. FY2028 request expected around January 2027.
Funding
Up to 60% federal; at least 40% non-federal match. Projects up to 36 months.
Who
State and local governments, nonprofits and public institutions registered in SAM
Pays for
Best management practices that cut nonpoint source pollution in 303(d)-listed or TMDL waters, carrying out a watershed plan that meets EPA's nine elements.

At least 70% of the federal request must go to on-the-ground practices. Work required by a permit or enforcement action is not eligible. Contact the NPS Unit to schedule the consultation.

How NEER helps: Pollutant load reduction estimates and watershed models.

CDBG Competitive, Community Enhancement and Planning funds

Alabama Department of Economic and Community Affairs (ADECA), Community and Economic Development Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
PY2026 applications closed Jul 22, 2026. PY2027 workshop expected spring 2027, with the deadline announced there.
Funding
PY2026: $23.27M allocation. Ceilings: County and Large City funds $500K, Small City fund (3,000 or fewer people) $400K, Community Enhancement $400K (10% match), Planning $40K (20% match).
Who
Non-entitlement cities, towns and counties. Jefferson, Mobile and Shelby counties and members of their consortiums are not eligible.
Pays for
Water and sewer extensions and rehabilitation, street and drainage improvements, housing rehabilitation and planning. Economic Development Infrastructure grants (up to $400K, 20% match) fund water and sewer for job-creating businesses year-round.

Competitive applications score up to 200 points: 130 for nature of benefits, 20 for local match, 50 for cost per beneficiary. A city or county with an open CDBG grant sits out. Each applicant gets one Competitive or Community Enhancement application. Of 124 PY2026 applications, 13 listed sewer and 9 water. ADECA can fund urgent-need projects after storms or flooding outside the regular cycle.

How NEER helps: Engineering and drainage studies to define the project and count beneficiaries.

Appalachian Regional Commission grants

ADECA, Federal Initiatives and Recreation Division
Next cycle
GrantDrinking waterWastewater (sewer)
Next date
FY2027 applications closed Sep 25, 2026. FY2028 deadline expected around September 2027, announced at the application workshop.
Funding
Up to $500K for construction, $350K non-construction, $50K planning. ARC pays up to 80% in distressed counties, 70% at-risk, 50% transitional, 30% competitive.
Who
Local governments, nonprofits, development districts and educational institutions in Alabama's 37 Appalachian counties
Pays for
Critical infrastructure including water and wastewater, plus business development, workforce and other ARC goals.

ARC generally doesn't fund water or sewer that serves only homes; exceptions cover distressed counties, and at-risk or transitional counties with compelling need, disaster relief or an EPA mandate. Construction applications need a stamped PER. Macon County is the only distressed county for FY2026.

How NEER helps: Preliminary engineering reports for water and sewer extensions.

Delta Regional Authority SEDAP grants

Delta Regional Authority, with ADECA
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 applications closed Jul 31, 2026. 2027 notice expected around June 2027.
Funding
Most awards $50K to $500K. 2026: about $16.6M across eight states, 10.26% allocated to Alabama.
Who
Local governments, nonprofits, development organizations and others in the 20 Alabama DRA counties, mostly in the Black Belt
Pays for
Basic public infrastructure including drinking water, wastewater and flood control, plus workforce and business development.

Projects serving distressed counties with basic public services are exempt from cost share. Apply through DRA's SEDAP portal; DRA and the state review jointly.

How NEER helps: Engineering support for water loss, sewer and flood control projects.

Southeast Crescent Regional Commission SEID grants

Southeast Crescent Regional Commission, with ADECA
Open now
GrantDrinking waterWastewater (sewer)
Next date
FY2027 pre-application due Dec 14, 2026; full application due Feb 22, 2027 (states may set earlier dates)
Funding
$50K to $1M. Federal share up to 80% in distressed counties, 50% in transitional counties.
Who
Eligible applicants in Alabama's 13 SCRC counties: Autauga, Baldwin, Coffee, Covington, Crenshaw, Dale, Geneva, Henry, Houston, Lee, Mobile, Montgomery and Pike
Pays for
Basic infrastructure including water systems, plus business, workforce and natural resource projects.

SCRC's page names water systems but not sewer; confirm sewer eligibility with the state program manager at ADECA.

How NEER helps: Engineering reports for water system expansions.

State of Alabama GOMESA grants

Alabama Department of Conservation and Natural Resources (ADCNR), State Lands Division
Next cycle
GrantStormwater & floodWastewater (sewer)
Next date
2026 proposals closed May 29, 2026; awards announced Aug 2026. Next call expected around March 2027.
Funding
2026: more than $52M for 21 projects, including $800K for Riviera Utilities wastewater resiliency and $3M for a stormwater project.
Who
Project sponsors in coastal Alabama; Mobile and Baldwin counties also get their own direct GOMESA shares
Pays for
Coastal protection, restoration, hurricane protection, and infrastructure affected by coastal wetland loss or offshore energy activity.

GOMESA money can't be used as match for other federal grants. Send a PDF proposal with budget, schedule and eligibility justification to ADCNR State Lands.

How NEER helps: Stormwater and wastewater resiliency studies for proposals.

AEMA hazard mitigation intake (FMA, HMGP, BRIC)

Alabama Emergency Management Agency, Recovery Division
Check agency
GrantStormwater & flood
Next date
No FY2026 FMA intake posted on AEMA's site; check the agency. A major disaster declaration for Hurricane Isaias was requested Oct 23, 2026.
Funding
Passes through FEMA funds
Who
Alabama jurisdictions with an approved hazard mitigation plan; all 67 counties have one
Pays for
AEMA keeps the state mitigation plan, runs FEMA's mitigation grants and helps local governments with plans.

Local plans are kept at AEMA's seven division level. AEMA's Safeguarding Tomorrow revolving loan fund plan (FY2024) would cover the up to 25% match on BRIC, FMA and HMGP, but AEMA said it needs legislative authority first; ask whether it is lending.

How NEER helps: Hazard mitigation plan action items and benefit-cost inputs backed by flood models.

Local and regional County and regional cost-share programs.

Alabama Coastal Area Management Program grants

ADCNR, State Lands Division, Coastal Section
Next cycle
GrantStormwater & flood
Next date
FY2027 proposals closed Mar 27, 2026. FY2028 call expected early 2027.
Funding
Preferred $20K to $50K federal; at least 1:1 non-federal match
Who
Mobile and Baldwin counties and their cities, state agencies, nonprofits, regional planning agencies, port authorities and schools
Pays for
Local planning, coastal hazards and resilience, coastal nonpoint source pollution control, habitat and public access.

Projects run 12 months from Oct 1. Good for small resilience plans and stormwater studies.

How NEER helps: Coastal flood and stormwater studies.

RESTORE Act project suggestions (Buckets 1 and 3)

Alabama Gulf Coast Recovery Council
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Project suggestions closed Oct 1, 2026. Check the agency for the next call.
Funding
46 projects worth over $435M funded to date
Who
Project sponsors in coastal Alabama
Pays for
Infrastructure that benefits the economy or ecological resources, coastal flood protection, restoration and planning. Separately, the RESTORE Council's Coastal Alabama Water Quality Program ($9.5M in the 2026 list, for 10 years) funds stormwater and wastewater upgrades, low impact development and septic to sewer conversion.

Suggestions sent before Aug 1, 2026 had to be resubmitted with current cost estimates.

How NEER helps: Stormwater, wastewater and flood studies that make a project suggestion specific.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. ADEM State Revolving Fund (SRF) program page
  21. ADEM Guidance for SRF Applicants
  22. ADEM CWSRF Intended Use Plan, FY2025 (final amendment Dec 2025)
  23. ADEM CWSRF IIJA Intended Use Plan, FY2025 (final Jun 8, 2026)
  24. ADEM CWSRF IIJA Emerging Contaminants Intended Use Plan, FY2025 (final Jun 8, 2026)
  25. EPA Region 4: EPA Announces $878,000 to Protect Waterways from Sewage Overflows in Alabama (Apr 30, 2026)
  26. ADEM DWSRF Intended Use Plan, FY2025 (final amendment Dec 2025)
  27. ADEM DWSRF IIJA Intended Use Plan, FY2025 (final Jun 8, 2026)
  28. ADEM DWSRF IIJA Lead Service Line Replacement Intended Use Plan, FY2025 (Amendment 2, Jul 27, 2026)
  29. ADEM DWSRF IIJA Emerging Contaminants Intended Use Plan, FY2025 (Amendment 2, Jul 27, 2026)
  30. ADEM Public Notice 252: CWA Section 319(h) FY2027 Requests for Project Proposals (Jan 14, 2026)
  31. ADEM Nonpoint Source Pollution Program
  32. ADECA Community Development Block Grant (CDBG) page
  33. ADECA PY2026 CDBG Action Plan (Application Manual, Tab 1)
  34. ADECA memo: PY2026 CDBG Grant Application Workshop and Submission Deadline (Mar 27, 2026)
  35. ADECA: PY2026 CDBG Grant Applications Received by July 22, 2026 Deadline
  36. ADECA CDBG News
  37. ADECA Appalachian Regional Commission page
  38. ADECA 2026 ARC State Strategy
  39. ADECA FY2027 ARC Application Workshop presentation
  40. ADECA ARC Application Information
  41. ADECA Delta Regional Authority page
  42. Delta Regional Authority 2026 SEDAP Notice of Funding Availability
  43. ADECA Southeast Crescent Regional Commission page
  44. Southeast Crescent Regional Commission grants (FY2027 SEID cycle)
  45. Yellowhammer News: Alabama opens GOMESA grant program, seeks project proposals (Mar 30, 2026)
  46. Governor Ivey Announces More Than $52 Million in GoMESA Funded Projects for 2026 (Aug 2026)
  47. Alabama EMA Agency Divisions (Recovery Division, Hazard Mitigation)
  48. Alabama EMA County Mitigation Plans
  49. Alabama EMA Safeguarding Tomorrow Revolving Loan Fund Intended Use Plan, FY2024
  50. OpenFEMA Disaster Declarations Summaries, Alabama, 2022 to present (secondary copy)
  51. Alabama Political Reporter: Governor requests FEMA funding for storm-impacted counties (Oct 26, 2026)
  52. Alabama EMA: Alabama awaits federal response to major disaster declaration request (Oct 28, 2026)
  53. ADCNR Alabama Coastal Area Management Program FY2027 Call for Proposals (rev. 2/2026)
  54. ADCNR: AGCRC Requests Project Suggestions for RESTORE Act Funding
  55. Governor Ivey Announces $87 Million in RESTORE Act Funding for Projects in Coastal Alabama (Jun 2026)