FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
- Next date
- Feb 26, 2027 to FEMA. State deadlines come earlier.
- Funding
- $400M+ nationally, including about $20M for capability and capacity building
- Who
- NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
- Pays for
- Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.
In Arkansas: Apply through the Arkansas Department of Agriculture's floodplain management program, not ADEM. Its 2026 Notice of Intent was due Aug 1, 2026; ask about intake for FEMA's Feb 26, 2027 deadline.
Last year of IIJA money for FMA.
How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).
FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
- Next date
- Deadline set for each qualifying flood disaster
- Funding
- $600M nationally
- Who
- Communities in states with a qualifying major flood disaster declaration
- Pays for
- Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.
In Arkansas: The Arkansas Department of Agriculture took 2026 Swift Current pre-applications through Aug 15, 2026 (up to $20M). Towns, cities and counties only.
Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.
How NEER helps: Identify and rank repetitive loss structures with flood models.
FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
- Next date
- Usually due within 12 months of the declaration. Confirm with the state.
- Funding
- Set as a share of each disaster’s federal assistance
- Who
- Jurisdictions in states with a major disaster declaration
- Pays for
- Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.
In Arkansas: FEMA data show Arkansas major disasters DR-4865 and DR-4873 (spring 2025 storms) with no HMGP designated, and only a winter storm emergency (EM-3636) in 2026. Ask ADEM. CDBG-DR can cover HMGP match in Benton, Cross and Pulaski counties.
Available only after a major disaster declaration in your state.
How NEER helps: Project definition and BCA backed by sewer and stormwater models.
FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
- Next date
- FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
- Funding
- $1B for FY2024 and FY2025 combined
- Who
- States apply; local governments are subapplicants with an approved hazard mitigation plan
- Pays for
- Larger pre-disaster infrastructure projects plus capability and capacity building.
In Arkansas: ADEM handles BRIC in Arkansas.
FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.
How NEER helps: Scoping studies and modeling to make projects application-ready.
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Letters of interest accepted anytime
- Funding
- About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
- Who
- Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
- Pays for
- Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.
Suited to large utility capital programs. Can be paired with SRF financing.
How NEER helps: Capital program optimization to package projects for a WIFIA loan.
GrantWastewater (sewer)Stormwater & flood
- Next date
- FY2025–26 allotments released Apr 2026; each state sets its own call
- Funding
- About $80M nationally for FY2025 and FY2026
- Who
- Municipalities; small and financially distressed communities need no cost share
- Pays for
- Combined and sanitary sewer overflow control and stormwater management projects.
In Arkansas: The Arkansas Department of Agriculture administers it; nine projects shared $1.9M in 2024. Check OSG on the WWAC pre-application and ask the Department about its next call.
Ask the state SRF program how and when it will distribute its allotment.
How NEER helps: Overflow and capacity modeling to define projects.
GrantDrinking water
- Next date
- Through the state drinking water program
- Funding
- $945.7M for FY2026, the final IIJA tranche
- Who
- Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
- Pays for
- PFAS and other emerging contaminant testing, planning and treatment. No local cost share.
In Arkansas: The WWAC pre-application lists a Small Water Grant (WIIN Small and Disadvantaged) option. Ask the Arkansas Department of Agriculture.
EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.
How NEER helps: Source and treatment alternatives screening with water system models.
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Applications accepted year-round through RD Apply
- Funding
- Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
- Who
- Rural areas and towns of 10,000 or fewer people
- Pays for
- Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.
In Arkansas: Arkansas projects start with the Water/Wastewater Advisory Committee pre-application, which lists USDA Rural Development as a funding source.
Grants are awarded alongside a loan, not on their own.
How NEER helps: Preliminary engineering reports with hydraulic models.
U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
- Next date
- No deadline; reviewed as received
- Funding
- EDA total FY2026 appropriation about $466M
- Who
- Distressed areas; project must be consistent with the regional CEDS
- Pays for
- Water and wastewater infrastructure that supports job creation, such as service to an industrial park.
Tie the project to named employers and jobs. Local match is required.
How NEER helps: Capacity analysis for new industrial load.
U.S. Army Corps of Engineers district
Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
- Next date
- Send a letter of request to the district anytime
- Funding
- Cost-shared federal study and construction
- Who
- Non-federal sponsors such as cities and counties
- Pays for
- §205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.
§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.
How NEER helps: Existing-conditions flood modeling to support the request.