Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Arkansas ยท Status checked November 16, 2026

Water and Sewer Treatment Facilities Grant Program (state matching grant)

Arkansas Natural Resources Commission, Department of Agriculture

Next cycleGrantDrinking waterWastewater (sewer)
Next date
2026 applications closed Sep 11, 2026; awards expected at the Nov 2026 Commission meeting. 2027 cycle expected late summer 2027
Funding
About $25M a year for three years. Under the proposed rule: construction grants up to $5M (30% match) for larger systems and up to $1M (25% match) for systems of 1,200 people or fewer; planning and design grants up to $100K (10% match) for systems of 10,000 or fewer
Who can apply
Cities, towns, counties, public water authorities and public facility boards
Pays for
Shovel-ready water supply, treatment and distribution, meter replacement, and sewer collection and treatment projects.
Tip
A priority list application must be filed at least 60 days before the funding application, and construction must be able to start within a year of award. The proposed rule gives extra points for I/I reduction, water loss over 30% and projects shared between systems.
How NEER helps
I/I and water loss studies that score extra points; engineering support to reach shovel-ready.

Program page Sources [1] [2] [3]

Sources

  1. $25 million grant program now available for water and wastewater infrastructure (Jul 9, 2026)
  2. Proposed amendments to 15 CAR Pt. 2, Financial Assistance (draft markup)
  3. Arkansas Department of Agriculture Funding Information & Checklist (updated May 27, 2026)