DC Department of Energy and Environment (DOEE), Water Quality Division
Next cycle
Grant (federal share up to 55% of project cost)Wastewater (sewer)Stormwater & flood
- Next date
- FY2027 applications closed Jun 15, 2026. The FY2028 request for partners is expected around May 2027, based on last year's cycle.
- Funding
- FY2027: about $3M expected from EPA. Minimum project cost $250,000; a request can't exceed the year's federal grant. At least 45% non-federal match.
- Who
- Nonprofits, government agencies and universities (DOEE's FY2027 notice). Both the project and the recipient must meet the Project Priority Rating System rules.
- Pays for
- Design and construction of voluntary sewage, stormwater grey and stormwater green infrastructure projects that help the District comply with the Clean Water Act.
The District receives its Clean Water SRF allotment as a formula grant, not a revolving loan fund. Each year's applications are scored onto a Project Priority List; DOEE funds ready-to-proceed projects from that list the following year, so plan two fiscal years ahead and have the 45% match lined up. Build America, Buy America applies.
How NEER helps: Sewer and stormwater models to size projects and document water quality benefits for the priority rating.
DC Water, with DOEE and EPA Region 3
Check agency
GrantDrinking water
- Next date
- FY2025–FY2026 Intended Use Plans stay in effect until EPA, DOEE and DC Water agree on new ones. Check DC Water for the next plan.
- Funding
- FY2025–26 plans: base about $10.9M a year (80% grant, 20% local match); IIJA supplemental about $24.9M a year; IIJA lead service line about $28.7M a year; emerging contaminants about $7.6M a year (100% grant). All are planning estimates.
- Who
- DC Water only. The Safe Drinking Water Act exempts the District from running a revolving fund, so EPA gives the allotment to DC Water as grants.
- Pays for
- Pumping stations, reservoirs, transmission mains and valves, small diameter main renewal, and Lead Free DC lead service line replacement contracts.
Property owners can't apply here; they benefit through the Lead Free DC programs this money pays for. The lead line plan lists six replacement contracts worth about $218M against about $57M of IIJA lead money for FY2025–26.
How NEER helps: Lead service line material prediction; water system models for main renewal priorities.
Grant (free or discounted replacement, paid by district and federal funds)Drinking water
- Next date
- Apply anytime, subject to available funding. Since October 2026 customer-initiated programs use one application through DC Water.
- Funding
- LPRAP: DC Water says all enrolled homeowners get a 100% discount on the private-side replacement. DC Water-initiated: private side free with a signed Right of Entry. House by House priority full replacement: free, subject to funding.
- Who
- Owners (or authorized representatives) of District residential properties. LPRAP: lead, galvanized or brass pipe on the private side with non-lead pipe in public space. House by House: lead on both sides plus a priority need, such as a pregnant or nursing mother, a child under 6, elevated blood or water lead, or a licensed child development facility.
- Pays for
- Replacement of lead, galvanized and brass water service lines on private property, and full public-and-private replacement for priority households.
Check the address on DC Water's service line map first. Don't start LPRAP work until you have a benefit confirmation letter, and use an approved contractor from DC Water's FY2027 list. Owners without a priority need can still do a voluntary full replacement, but they pay for the private side.
How NEER helps: Lead service line material prediction to target outreach and contracts.
Grant (rebate after installation)Wastewater (sewer)Stormwater & flood
- Next date
- No deadline posted. Check eligibility with DC Water before installing.
- Funding
- 100% of the cost of buying and installing a backwater valve, up to $6,000 per property
- Who
- Property owners in the combined sewer area with a documented sewer backup since 2012 who haven't taken part before, and properties with a documented backup from the September 10, 2020 storm
- Pays for
- Backwater valves that keep sewage from backing up into basements during heavy rain.
A DC-licensed master plumber must get the plumbing permit. Submit the eligibility request first, then upload the invoice and documents for payment after installation.
How NEER helps: Sewer models that show which blocks face basement backup risk.
Grant (subsidized installation or rebate)Stormwater & flood
- Next date
- Homeowners apply anytime and join a waitlist for a free audit. Nonprofit installers: FY2027 RFAs expected around December 2026.
- Funding
- RiverSmart Homes copays: rain barrel $100 (up to two), rain garden $200 per 50 sq ft, BayScaping $200 per 120 sq ft, shade trees free. Rebates: rain barrels $2 a gallon up to $1,000; rain gardens $41 per sq ft up to $3,000; permeable surfaces $15 per sq ft (pavers) or $8 (vegetation) up to $6,000; trees up to $100.
- Who
- Owners of District residential properties with four or fewer units, and renters with the owner's consent. Pavement removal under RiverSmart Homes is limited to the MS4 area, Ward 7 and Ward 8. DOEE picks nonprofit, faith-based and university partners to install the practices.
- Pays for
- Rain barrels, shade trees, rain gardens, native plant gardens and permeable pavement that cut runoff from homes.
Use RiverSmart Homes for a DOEE audit and installed practices, or RiverSmart Rebates to hire your own contractor or do it yourself and be reimbursed. Installed practices can also earn a RiverSmart Rewards discount. DOEE's FY2026 installer RFAs were $521,000 for rain barrels and $2.17M for landscaping.
How NEER helps: Neighborhood runoff models to show where small practices add up.
DOEE, with the Alliance for the Chesapeake Bay
Next cycle
GrantStormwater & flood
- Next date
- Applications for 2027 funding and installation closed Aug 15, 2026. The 2028 deadline is expected around mid-August 2027, based on last year's cycle.
- Funding
- Not published. DOEE funds a limited number of projects.
- Who
- 501(c)(3) nonprofits and houses of worship in the District that can maintain the practices long term
- Pays for
- Shade trees, rain gardens, permeable pavers, cisterns, stormwater planters and swales, with community outreach and education.
It won't fund work that stormwater regulations already require. Projects can lower the organization's stormwater fee and CRIAC.
How NEER helps: Site runoff estimates to pick practices and report retention.
Grant (monthly bill discount, not a cash grant)Stormwater & flood
- Next date
- Apply anytime
- Funding
- Up to 55% off the District stormwater fee and up to 20% off the Clean Rivers Impervious Area Charge (CRIAC). FY2027 rates: stormwater fee $4.03 and CRIAC $25.50 per billed ERU a month.
- Who
- Any District property with green infrastructure that retains stormwater. Simple application under 2,000 sq ft of impervious area; standard application above that or with a stormwater management plan.
- Pays for
- Ongoing discounts for rain barrels, cisterns, trees, rain gardens, permeable pavement and green roofs.
The CRIAC pays for DC Water's Clean Rivers Project, the tunnels and green infrastructure that cut combined sewer overflows, so it is the bigger part of the discount. Savings per practice are small (about $1.74 a month for a rain barrel in FY2027).
How NEER helps: Retention calculations for the standard application.
Grant (bill credit, not a cash grant)Stormwater & flood
- Next date
- FY2027 applications Sep 1, 2026 to Aug 31, 2027, first come, first served
- Funding
- Up to 80% of the CRIAC in FY2027 (rate subject to change during the year)
- Who
- Tax-exempt District charitable organizations, cemeteries, houses of worship and continuing care facilities whose annual CRIAC is at least 1% of revenue after expenses, and that complete a stormwater mitigation project
- Pays for
- Relief from the Clean Rivers Impervious Area Charge in exchange for onsite green infrastructure, tree planting or retiring Stormwater Retention Credits.
Funding is limited, so apply early in the fiscal year. Onsite: one tree per ERU or manage runoff from 10% of impervious area. Offsite: buy and retire 10 SRCs per ERU, or have that value withheld from the relief.
How NEER helps: Impervious area and retention estimates for the mitigation project.
Grant (income from selling credits)Stormwater & flood
- Next date
- The SRC market runs year-round. DOEE says it has no SRC Program funding opportunities, including Price Lock purchases, open now.
- Funding
- Price Lock purchase prices: non-tidal MS4 $2.03 per SRC for years 1–6, then $0.42 for years 7–12; tidal MS4 $1.77, then $0.42. Market prices are on the SRC Registry.
- Who
- Anyone who installs new, voluntary green infrastructure in the MS4 area, alone or with an SRC aggregator. Projects in the combined sewer area aren't eligible.
- Pays for
- Credits (1 SRC = 1 gallon of retention for a year) sold to developers who meet part of their stormwater requirement off-site.
DOEE said it would favor Price Lock projects on nonprofit land such as churches, cemeteries and schools when funding returns.
How NEER helps: Retention volume calculations to estimate credits.
Grant (free services, not cash)Stormwater & flood
- Next date
- Pilot program; the page was last updated October 2023. Check the agency for current intake.
- Funding
- Free home flood resilience assessment, report, counseling and Elevation Certificate. Upgrade funding not stated.
- Who
- District homeowners with flood risk. Homes in the 100-year floodplain come first, then the 500-year floodplain, then other homes with documented risk.
- Pays for
- A professional assessment that recommends upgrades such as backflow valves, sump pumps, flood barriers and flood vents.
An Elevation Certificate may lower flood insurance premiums. Pair with DC Water's backwater valve rebate if the home had a documented sewer backup.
How NEER helps: Flood models and depth maps for the property.
DC Homeland Security and Emergency Management Agency (HSEMA)
Check agency
GrantStormwater & flood
- Next date
- No DC intake date posted for FY2026 FMA. Ask the DC Hazard Mitigation Officer well before FEMA's Feb 26, 2027 deadline.
- Funding
- Passes through FEMA funds
- Who
- District agency partners. HSEMA says homeowners and businesses can't apply, but a partner agency can apply on their behalf.
- Pays for
- HSEMA collects project ideas from partners and submits applications to FEMA as the District's lead mitigation agency.
For BRIC's FY2024–25 round HSEMA wanted project ideas by Apr 24, 2026, three months before FEMA's Jul 23, 2026 deadline. Expect a similar lead time for FMA. The FMA page still shows the FY2023 cycle.
How NEER helps: Flood models and benefit-cost inputs for FEMA applications.