Georgia Environmental Finance Authority (GEFA), with Georgia EPD
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- 2027 call for projects: pre-application by 5:00 p.m. Jan 29, 2027. Loan applications accepted year-round; Feb 1, 2027 is the cutoff for the May 2027 board meeting.
- Funding
- FY2026 plan: $12.1M base and $41.7M supplemental grants. Principal forgiveness by affordability score: 70% (47–50), 55% (40–46), 40% (35–39), 25% (30–34), none at 29 or less. Benchmark rate 3.03% (May 2026); terms 5 to 30 years. Emerging contaminant funds go out as grants or forgivable loans.
- Who
- Cities, counties and water and sewer authorities that are Qualified Local Governments; nonprofits for land conservation loans. State law bars GEFA from lending to private entities for water and sewer projects.
- Pays for
- Wastewater treatment, sewer rehab and replacement, inflow and infiltration correction, stormwater and nonpoint source projects, water and energy conservation, and planning, design and construction.
Only projects on the Intended Use Plan can be funded, and the plan is built from the annual pre-application. Only one project per community can get principal forgiveness. GEFA says affordability scores are being updated; check yours in the Affordability Score Index. Conservation projects, WaterFirst and PlanFirst communities and high-affordability communities get rate discounts. GEFA also gives EPA Sewer Overflow and Stormwater Reuse (OSG) grants to projects on the CWSRF plan, disadvantaged communities and overflow control plans.
How NEER helps: Calibrated sewer models for I/I studies, capacity and overflow work that score as compliance and water quality benefits.
Georgia Environmental Finance Authority (GEFA), with Georgia EPD
Open now
LoanGrant (principal forgiveness; grants for emerging contaminants)Drinking water
- Next date
- 2027 call for projects: pre-application by 5:00 p.m. Jan 29, 2027. Loan applications accepted year-round on the GEFA board cycle.
- Funding
- FY2026 plan: $10.4M base and $67.5M supplemental grants. Principal forgiveness by affordability score: 70% (48–50), 60% (42–47), 50% (36–41), 40% (30–35), each capped at $5.5M. Benchmark rate 3.03% (May 2026); up to 40 years for disadvantaged communities. Lead line plan: forgiveness of 25%, 50%, 65% or 85% by affordability. Emerging contaminant funds go out as grants or forgivable loans.
- Who
- Cities, counties and water and sewer authorities that are Qualified Local Governments
- Pays for
- Treatment, wells, storage, mains, meters, water loss and conservation, lead service line inventory and full replacement, and PFAS treatment.
The last lead service line plan GEFA posted is the FY2024 plan (solicitation closed Dec 31, 2024); ask GEFA how lead line projects enter the 2027 call. Emerging contaminant pre-applications closed Feb 27, 2026, and at least 25% of those funds go to disadvantaged systems or systems under 25,000 people. EPD's PFAS sampling flags systems that GEFA then contacts. GEFA also awards small, underserved and disadvantaged community (SUDC) grants for Safe Drinking Water Act compliance.
How NEER helps: Water system models, lead service line material prediction and inventory support.
Georgia Environmental Finance Authority (GEFA)
Open now
LoanDrinking waterWastewater (sewer)
- Next date
- Pre-application in the 2027 call for projects by Jan 29, 2027. Loan applications year-round; cutoffs Feb 1, May 3 and Aug 2, 2027 for the May, August and November board meetings.
- Funding
- Benchmark rate 4.03% (May 2026), up to 20 years. Environmental emergency loans up to $1M, up to 10 years. Interim loans for projects with permanent financing such as USDA Rural Development.
- Who
- Local governments and water and sewer authorities
- Pays for
- State-funded loans for water and sewer lines, treatment plants, pump stations, wells, tanks, meters, and energy efficiency at plants.
Emergency loans cover events in the past six months, not deferred maintenance. WaterFirst communities get a 1% rate reduction on GEFA loans. Without federal strings, this is the simplest GEFA loan when principal forgiveness isn't in play.
How NEER helps: Master plans and capital plans that define the project.
Georgia Environmental Finance Authority (GEFA)
Next cycle
LoanGrant (at least 50% principal forgiveness)Drinking waterWastewater (sewer)
- Next date
- Solicitation closed Dec 31, 2025. GEFA's board began awarding listed projects Nov 13, 2026.
- Funding
- $499.4M from the 2025 American Relief Act: $124.9M wastewater, $8.96M septic, $359.5M drinking water, plus $6.05M for emergencies. 0% interest, at least 50% principal forgiveness, 1.5% origination fee, 5 to 30 years. Planning loans up to $200K can be 100% forgiven.
- Who
- Systems impacted by Hurricane Helene with SRF-eligible projects
- Pays for
- Flood proofing, relocation, hardening, backup power, redundancy, septic consolidation, replacing damaged equipment, and risk and resilience planning.
Projects not submitted during the solicitation can be added to the list through a public meeting, so ask GEFA. All Helene projects need qualifications-based selection for engineering, whatever the cost.
How NEER helps: Flood risk and vulnerability assessments for plants and lift stations; resilience alternatives.
Georgia Environmental Finance Authority (GEFA)
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- First round closed Aug 31, 2026. Later rounds depend on demand; check the agency.
- Funding
- Up to $150K per project, or $250K for two or more communities together. 10% match, in-kind allowed. $5M in the first year.
- Who
- Local governments and water and sewer authorities; ranked by affordability score
- Pays for
- Planning only: asset management, capital plans, rate studies, stormwater funding plans, resilience studies, I/I studies, water loss audits, consolidation studies, watershed plans and WaterFirst preparation.
Design and construction are not eligible. Use it to fund the study that sets up an SRF application.
How NEER helps: I/I studies, resilience studies, stormwater and capital planning.
Georgia Department of Community Affairs (DCA)
Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- FY2027 applications due 11:59 p.m. Apr 2, 2027 in eCivis; bonus and leverage documents by Jun 30, 2027
- Funding
- Up to $1M single-activity, $1.5M multi-activity, $2M with regional cooperation bonus. No match up to $500K; 5%, 10% or 15% above that. About $41M expected for FY2027.
- Who
- Non-entitlement cities and counties; projects must mainly benefit low- and moderate-income people
- Pays for
- Public facilities such as water and sewer lines and drainage, plus housing and economic development.
Water and sewer projects can earn up to 10 bonus points. Communities funded in 2026 can apply again only with an exception such as WaterFirst, PlanFirst, RAS or GICH status. Procurement and tribal consultation must be done by Apr 2. DCA also keeps an Immediate Threat and Danger set-aside (up to $50K) for urgent needs.
How NEER helps: Engineering and drainage studies that define the project and its beneficiaries.
Georgia Department of Community Affairs (DCA)
Rolling
GrantLoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Year-round. Start with an Initial Project Assessment with DCA.
- Funding
- Up to $1M per project from a $4M set-aside (2025 figures)
- Who
- Non-entitlement cities and counties, for projects where at least 51% of jobs created or kept go to low- and moderate-income people
- Pays for
- Public infrastructure such as water and sewer lines, street paving and drainage that a business expansion needs, plus business loans.
Ask DCA for pre-agreement cost approval so the project can start while the application is reviewed.
How NEER helps: Capacity checks showing the water and sewer system can serve the new load.
OneGeorgia Authority, through DCA
Open now
GrantLoanDrinking waterWastewater (sewer)
- Next date
- Quarterly. Full applications due the second Friday of January, April, July and October (Jan 8, 2027 next); pre-applications 30 days before.
- Funding
- Up to $500K per project
- Who
- Cities, counties and development authorities in eligible rural, high-poverty counties
- Pays for
- Economic development projects, including water and sewer infrastructure, that create or keep jobs.
OneGeorgia calls the Equity Fund funding of last resort. Meet your DCA regional representative for an Initial Project Assessment first.
How NEER helps: Capacity checks for the water and sewer service a project needs.
Georgia Department of Community Affairs (DCA)
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2026 deadlines were Jul 10 and Oct 9, 2026. A 2027 round is expected around mid-2027.
- Funding
- Up to $2M per project; ARC match rules apply
- Who
- Local governments, water and sewer authorities and other designated providers in Georgia's ARC counties
- Pays for
- Water, wastewater and stormwater system expansions, improvements and new construction, plus some roads and sidewalks tied to jobs.
Construction applications need a Preliminary Engineering Report by a competitively procured professional. Funds went first-come, first-served in 2026.
How NEER helps: Preliminary Engineering Reports backed by system models.
Georgia Environmental Protection Division (EPD)
Next cycle
GrantStormwater & flood
- Next date
- FY2026 applications closed Apr 30, 2026. FY2027 expected in spring 2027.
- Funding
- Up to 60% of project cost; 40% non-federal match. No minimum or maximum award.
- Who
- Qualified Local Governments, authorities, regional commissions, RC&D councils, schools and state colleges
- Pays for
- Projects that implement a nine-element watershed plan: green infrastructure, stream restoration, urban stormwater controls outside NPDES permits, culverts, dirt roads and septic repairs.
The project must be in a HUC-10 or smaller watershed with a nine-element plan. WaterFirst communities get priority status.
How NEER helps: Watershed modeling and nine-element plans.
Georgia Environmental Protection Division (EPD)
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- SFY2027 applications closed Oct 31, 2026. SFY2028 expected in fall 2027.
- Funding
- Up to $150K and 90% of cost; 10% match, cash or in-kind. 30-month projects.
- Who
- Local and state governments, authorities, regional commissions, RC&D councils, school systems and state colleges
- Pays for
- Projects that carry out practices recommended in one of Georgia's 10 regional water plans.
You need a letter of endorsement from the water planning council chair. Metro Water District applicants qualify only for projects that benefit a neighboring region and are endorsed by that region's council. The Metro District itself offers technical assistance, not grants.
How NEER helps: Water supply, drought and conservation studies tied to the regional plan.
Georgia Emergency Management and Homeland Security Agency, Hazard Mitigation
Rolling
GrantStormwater & flood
- Next date
- Pre-applications accepted on a rolling basis. The Hurricane Helene HMGP application period ended Mar 15, 2026.
- Funding
- Passes through FEMA funds. HMGP up to 75% federal. FMA up to 100% for severe repetitive loss, 90% for repetitive loss, 75% otherwise. BRIC up to 75%, 90% for small, impoverished communities.
- Who
- State agencies and local governments with a FEMA-approved hazard mitigation plan; some nonprofits for HMGP. FMA and BRIC need NFIP good standing.
- Pays for
- GEMA/HS helps with project scoping and pre-applications, then reviews, ranks and recommends projects to FEMA.
Each application needs a letter of support from the county EMA director, and the project must be an action in the local mitigation plan. Georgia's enhanced state plan raises HMGP to 20% of disaster aid. In a 2026 Pooler HMGP award, the state paid 10% of the cost (WTOC report).
How NEER helps: Stormwater master plans, benefit-cost support and flood models for HMGP and FMA projects.