Georgia ยท Status checked November 16, 2026
Helene Resilience Funding (SRF disaster supplement)
Georgia Environmental Finance Authority (GEFA)
- Next date
- Solicitation closed Dec 31, 2025. GEFA's board began awarding listed projects Nov 13, 2026.
- Funding
- $499.4M from the 2025 American Relief Act: $124.9M wastewater, $8.96M septic, $359.5M drinking water, plus $6.05M for emergencies. 0% interest, at least 50% principal forgiveness, 1.5% origination fee, 5 to 30 years. Planning loans up to $200K can be 100% forgiven.
- Who can apply
- Systems impacted by Hurricane Helene with SRF-eligible projects
- Pays for
- Flood proofing, relocation, hardening, backup power, redundancy, septic consolidation, replacing damaged equipment, and risk and resilience planning.
- Tip
- Projects not submitted during the solicitation can be added to the list through a public meeting, so ask GEFA. All Helene projects need qualifications-based selection for engineering, whatever the cost.
- How NEER helps
- Flood risk and vulnerability assessments for plants and lift stations; resilience alternatives.