Iowa DNR (project approval) and Iowa Finance Authority (financing)
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Construction applications due Dec 1, 2026, then the first working day of March, June and September
- Funding
- Forgiveness for disadvantaged communities from $500K (score 11) to $1.4M (score 20), construction costs only; up to 100% forgiveness for PFAS and emerging contaminant projects. Tax-exempt rate 3.42% plus 0.25% servicing (Oct–Dec 2026); terms up to 20 years, or 30 at the base rate plus 1%.
- Who
- Cities, counties and other public entities for wastewater; public and private borrowers for nonpoint source and stormwater projects
- Pays for
- Wastewater treatment, sewer repair and replacement, CSO correction, regionalization, stormwater quality and nonpoint source projects.
Disadvantaged status comes from the Socioeconomic Assessment Tool score (11 of 20 or more) at the time of the IUP application, and it doesn't change later. Compliance projects that resolve Significant Non-Compliance get forgiveness first. Applications need a Facility Plan. No new Sponsored Projects in SFY 2027.
How NEER helps: Facility plans built on calibrated sewer models; I/I and capacity studies.
Iowa DNR (project approval) and Iowa Finance Authority (financing)
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- Construction applications due Dec 1, 2026, then the first working day of March, June and September
- Funding
- Forgiveness for disadvantaged communities from $500K to $1.4M by score; PFAS forgiveness up to 80% (capped at $3M for a new source, $8M for treatment) or 90% for consolidation (up to $8M); lead line forgiveness up to 49% per project in disadvantaged areas
- Who
- Public and private community water systems and nonprofit non-community water systems
- Pays for
- Treatment, wells, storage, water mains, lead service line inventory and replacement, PFAS treatment and consolidation.
Applications need a Preliminary Engineering Report (or a lead service line replacement plan), a viability assessment and the Socioeconomic Assessment Tool worksheet. Non-disadvantaged systems can still get lead line forgiveness for addresses in census tracts that score 11 to 20.
How NEER helps: Lead service line material prediction; water system models.
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Jan 4, 2027, then the first working day of April, July and October
- Funding
- No minimum or maximum; no initiation or servicing fees; payments deferred up to 3 years
- Who
- Public and private borrowers with an SRF-eligible project
- Pays for
- Engineering, testing, facility plans, preliminary engineering reports and specifications before construction.
The loan rolls into the SRF construction loan. The borrower still needs bond counsel to issue the debt.
How NEER helps: Facility plans and engineering reports.
Iowa DNR and Iowa Finance Authority
Open now
LoanStormwater & flood
- Next date
- With the quarterly SRF deadlines: Dec 1, 2026, then March, June and September. Scores and approvals come 6–8 weeks after each deadline.
- Funding
- 0% interest on the first $500K per project for projects that score at least 10 of 20; the rest at the SRF rate. $10M budgeted.
- Who
- Public entities with a stormwater utility, bonding authority or another way to repay; must own or control the project area
- Pays for
- Stormwater and other nonpoint source practices that support Iowa’s Nonpoint Source Management Plan or a nine-element watershed plan.
Practices get priority over land purchase. Funding is first come, first funded until the budget is used.
How NEER helps: Stormwater models to size practices and estimate load reductions.
Iowa Finance Authority, with Iowa DNR and IDALS
Next cycle
GrantDrinking waterWastewater (sewer)
- Next date
- 2026 round closed Oct 30, 2026; awards expected by the end of 2026. Next round expected to open about September 2027.
- Funding
- About $12M in the 2026 round; up to $1M per applicant per year (raised from $500K by HF 2771)
- Who
- Iowa communities with wastewater or drinking water projects
- Pays for
- Wastewater and drinking water infrastructure. Priority for disadvantaged communities, high rates (over 2% of MHI), Nutrient Reduction Strategy technology and impaired waters.
2026 applicants had to commit to start construction before September 2027. The application has opened each September since 2023.
How NEER helps: Engineering and rate analysis to support the application.
Iowa Finance Authority, with Iowa DNR and IDALS
Next cycle
LoanWastewater (sewer)Drinking waterStormwater & flood
- Next date
- 2026 applications closed Mar 31, 2026. Next cycle expected early 2027; check IFA.
- Funding
- Public borrowers pay 50% of the SRF tax-exempt rate; up to 20 years; 2% fee at closing
- Who
- Municipalities, landowners, public utilities, rural water districts and specified industries
- Pays for
- Point and nonpoint source projects that use Iowa Nutrient Reduction Strategy practices, such as biological or chemical nutrient removal at treatment plants.
Scoring weights financial feasibility (35%), water quality benefit (35%) and collaboration (30%).
How NEER helps: Nutrient reduction and watershed load analysis.
LoanDrinking waterWastewater (sewer)
- Next date
- Rules proposed (hearing Oct 6, 2026). IFA will post an annual application period on its website.
- Funding
- $10M fund; interest no more than 1%; 2% fee at closing; terms up to 30 years
- Who
- Cities of 11,000 people or fewer. Projects with any federal funding (EPA, USDA, CDBG, earmarks) are not eligible.
- Pays for
- Water and wastewater plant upgrades. Treatment and compliance projects rank above distribution, storage and collection.
Regional consolidation and projects that hold down residential rates get priority. Permits and technical review must be done before applying.
How NEER helps: Compliance and rate impact analysis.
Iowa Economic Development Authority
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2027 windows: Mar 1–Apr 30, 2027 and Jul 1–Aug 31, 2027
- Funding
- Up to $500K per project; $10.4M budget in 2026
- Who
- Non-entitlement cities and counties; at least 51% low-to-moderate income beneficiaries
- Pays for
- Sanitary sewer, water systems, treatment plants, rural water connections, and storm sewers or conveyances that reduce flood risk.
No match is required if CDBG covers the project; otherwise the rest of the funding must be committed when you apply. A certified grant administrator must run the grant. Apply through iowagrants.gov.
How NEER helps: Drainage and capacity studies that define the project.
Iowa Economic Development Authority
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Feb 1–Mar 31, 2027
- Funding
- Up to $15K; 1:1 match
- Who
- Non-entitlement cities and counties; low-to-moderate income benefit
- Pays for
- Asset management plans and capital improvement plans that lead to a future CDBG project.
IEDA lists asset management and capital improvement plans, not engineering studies, as eligible. Confirm a utility plan fits before applying.
How NEER helps: Asset management plans for water, sewer and storm systems.
Iowa Economic Development Authority
Rolling
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Anytime, while funds last
- Funding
- No maximum published; check the agency
- Who
- Non-entitlement cities and counties
- Pays for
- Imminent threats to health or safety that need immediate action and come from unforeseeable causes.
Only when other funds, including the competitive CDBG rounds, can’t arrive in time. Call the CDBG team first.
Iowa Department of Agriculture and Land Stewardship
Next cycle
GrantStormwater & flood
- Next date
- Pre-applications closed Nov 6, 2026. Invitations by Dec 18, 2026; full applications due Feb 12, 2027.
- Funding
- Up to 50% of eligible costs. In 2026, $3.63M went to 16 projects.
- Who
- Cities, counties, conservation boards, SWCDs, nonprofits, public water utilities and watershed management authorities
- Pays for
- Bioretention, bioswales, permeable pavement, wetlands, stormwater ponds and similar practices.
Meet with an IDALS Urban Conservationist before applying. Projects need local partners and an education and outreach part.
How NEER helps: Stormwater models to site practices and estimate pollutant reductions.
Iowa Homeland Security and Emergency Management
Open now
GrantStormwater & flood
- Next date
- Notice of Interest in EMGrantsPro; FEMA sets the deadlines
- Funding
- Passes through FEMA funds
- Who
- Iowa jurisdictions with a FEMA-approved local hazard mitigation plan (updated every five years)
- Pays for
- HSEMD reviews Notices of Interest, then invites applications for FEMA mitigation grants.
HSEMD takes Notices of Interest only in EMGrantsPro, not on the old Excel form. Sending one early leaves more time for technical help. Counties usually lead the multi-jurisdiction plans.
How NEER helps: Hazard mitigation plan action items backed by flood models.
Iowa Flood Mitigation Board, staffed by HSEMD
Check agency
GrantStormwater & flood
- Next date
- Applications on request from HSEMD; the board reviews them at its meetings
- Funding
- $5M a year from FY2024 through FY2028
- Who
- Communities that benefit from a levee, including levee districts
- Pays for
- Levee construction, repair and improvement.
The sales tax increment program closed to new applications on Jan 1, 2016, so new flood projects go through this fund or FEMA.
How NEER helps: Levee and riverine flood models.