Louisiana Department of Environmental Quality (LDEQ), Clean Water State Revolving Fund
Rolling
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- RF-100 pre-applications accepted anytime. The 2026 call set a Mar 31, 2026 deadline; expect a similar deadline around Mar 31, 2027.
- Funding
- LDEQ expects to fund at least $166.4M in SFY 2027. Forgiveness: about $1.83M to 4 borrowers from the FFY 2026 base grant and $13.27M (49% of the $27.08M IIJA supplemental grant) to 11 borrowers. 0.95% interest for most projects, 20-year terms, 0.5% annual fee on outstanding balances.
- Who
- Municipalities and other public entities. Nonpoint source and estuary work must appear in LDEQ's 319 plan or the Barataria-Terrebonne estuary plan.
- Pays for
- Wastewater treatment and collection, sewer overflow work, decentralized systems, stormwater management and reuse, nonpoint source and estuary projects.
Forgiveness goes to distressed communities: MHI below the state MHI, unemployment above the state rate, or population growth below the state rate (latest ACS). Projects gain 1,000 priority points for an approved facility plan and 2,000 for approved plans and specs. Submit the LWWJFC Intent to File form with the RF-100. LDEQ is moving its FFY 2026 clean water emerging contaminants grant ($2.337M) to the drinking water fund, so it isn't offered here.
How NEER helps: Facility plans built on calibrated sewer models; I/I and capacity studies; stormwater models for green project reserve work.
Louisiana Department of Health, Office of Public Health
Check agency
LoanGrant (principal forgiveness)Drinking water
- Next date
- Check the agency. LDH's site blocked automated checks, so the current plan's deadlines and terms weren't confirmed.
- Funding
- Check the agency for current forgiveness, lead service line and emerging contaminant terms. LDEQ is moving its FFY 2026 clean water emerging contaminants grant of $2.337M into this fund.
- Who
- Public water systems. Check LDH for ownership rules.
- Pays for
- Drinking water infrastructure such as treatment and distribution mains, lead service line replacement and emerging contaminants work.
Read LDH's latest Intended Use Plan on its DWRLF page for forgiveness shares and the fundable list. DWRLF loans can count as match for Water Sector Program grants.
How NEER helps: Lead service line material prediction; water system models.
Water Sector Commission; Office of Community Development, Local Government Assistance (OCD-LGA)
Next cycle
GrantDrinking waterWastewater (sewer)
- Next date
- No round open. The FY 2026–27 portal was open Oct 17 to Dec 1, 2025. No newer round was posted when checked; check OCD-LGA.
- Funding
- Up to $5M per application; consolidations up to $5M for the first system plus $2.5M per added system, max $10M. 25% match unless waived. Phase 2 got $70M a year in FY 2024–25 and FY 2025–26, plus a $5M emergency subfund each year.
- Who
- Public water systems and community sewer systems that are not for profit. Systems funded in Rounds 1 or 2 are excluded except for consolidations and a few other cases. Nobody on the Legislative Auditor's non-compliance list.
- Pays for
- Compliance work, replacing failing treatment and distribution, consolidation, wastewater plant repairs, resilience to severe weather, green infrastructure.
Scored out of 140: severity 50, consolidation 20, readiness 20, sustainability 15, extra local match 15, resilience 10, match documentation 10. Applications are ranked in three population tiers (under 3,300; 3,301–10,000; over 10,000). State money can't be match; SRF loans can. Grantees must complete a state-paid rate study, and projects without a construction contract within two years can be terminated.
How NEER helps: Engineering reports and resilience assessments that earn readiness and resilience points; consolidation studies with water and sewer models.
Office of Community Development, Local Government Assistance (OCD-LGA)
Open now
GrantWastewater (sewer)Drinking waterStormwater & flood
- Next date
- FY 2027 full applications due 4:30 p.m. Jan 20, 2027, by invitation only. Awards expected Apr 1, 2027.
- Funding
- Up to $2M for sewer or water, $1M for streets; at least $350K in construction. About $12M a year for Public Facilities.
- Who
- Non-entitlement parishes and municipalities, one application each. Projects must meet a HUD national objective, such as at least 51% low- and moderate-income benefit.
- Pays for
- Sewer, potable water and street projects. Drainage is eligible only as a supporting activity, for example with a street project.
Runs on a two-year cycle: the FY 2026–27 severity packages were due May 22, 2025, and only invited applicants can file in January. Systems rated D or F, or sewers under a compliance order, need LDH or DEQ approval to apply for another project type.
How NEER helps: Severity package and engineering support built on sewer and water models.
Office of Community Development, Local Government Assistance (OCD-LGA)
Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Applications Nov 2, 2026 to Feb 26, 2027
- Funding
- Villages up to $25K, towns up to $35K, cities up to $50K, parishes up to $100K. FY 2026–27 per-parish allocation $82K.
- Who
- Non-entitlement municipalities and parishes
- Pays for
- Small projects including sewer and water improvements, drainage and roads, with reasonable engineering costs.
Small, but quick to apply for and fits patch-and-repair drainage or water line work.
How NEER helps: Drainage studies to scope the project.
Office of Community Development, Local Government Assistance (OCD-LGA)
Open now
GrantDrinking water
- Next date
- Applications Nov 2, 2026 to Feb 26, 2027 in the online portal
- Funding
- Villages up to $25K, towns up to $35K, cities up to $50K, parishes up to $100K. FY 2026–27 per-parish allocation $110K. $500K emergency set-aside, up to $300K per grant.
- Who
- Non-entitlement municipalities and parishes
- Pays for
- Rehabilitation, improvement and construction of community water systems. Engineering capped at 10% plus 3% for inspection. Planning-only, hydrant-only and generator projects are not eligible.
Emergency requests must follow an emergency within the last three months; call LOCD first.
How NEER helps: Water system models to pick the lines and fixes that matter most.
Louisiana Office of Community Development (LOCD)
Next cycle
GrantStormwater & flood
- Next date
- No new funding round posted when checked; check LOCD.
- Funding
- $1.2B in CDBG-MIT; $899M awarded to 129 flood risk reduction projects
- Who
- Local and regional public entities through the nine watershed regions
- Pays for
- Flood risk reduction projects, regional capacity building, nature-based solutions, buyouts and non-federal cost share help.
Even without a new round, LWI's 47 regional HEC-HMS and HEC-RAS models and data are public and can support FEMA and DOTD applications.
How NEER helps: Local models built from LWI's regional HEC-RAS models to quantify project benefits.
Louisiana DOTD, Public Works
Open now
GrantStormwater & flood
- Next date
- Pre-application by May 1, 2027; application by Oct 1, within four years of the pre-application
- Funding
- Up to 90% of construction cost with a 10% local match; projects must cost $100K or more. Rural Grant Opportunity can reimburse up to 100%.
- Who
- Parishes, municipalities, levee boards and drainage districts. Rural grants: municipalities under 5,000 people or rural parishes under 50,000 that can't afford the match.
- Pays for
- Channel enlargement, levees, pump stations, reservoirs, relocating structures and other flood damage reduction.
A committee of DOTD, the Louisiana Geological Survey and the Division of Administration ranks applications.
How NEER helps: Hydrologic and hydraulic models and benefit-cost analysis for the application.
Coastal Protection and Restoration Authority (CPRA)
Open now
Match helpGrantStormwater & flood
- Next date
- FY 2027 proposals due Dec 11, 2026
- Funding
- Up to $5M in GOMESA funds for FY 2027, paid on a reimbursement basis
- Who
- Coastal Zone parishes. Two parishes can partner with one as lead; other partners allowed.
- Pays for
- Parish-led coastal restoration and resilience: stormwater management, green infrastructure and drainage improvements, shoreline protection, marsh creation, hydrologic restoration.
The project must bring its own match, and CPRA money can serve as match for federal grants. Construction is required; final design counts only with construction. FY 2026 proposals were limited to 7 pages and scored on Master Plan fit, match, feasibility and area benefited.
How NEER helps: Stormwater and drainage models to show area benefited.
Governor's Office of Homeland Security and Emergency Preparedness (GOHSEP), Hazard Mitigation
Open now
GrantStormwater & flood
- Next date
- FMA Swift Current: Sep 14, 2026 to Feb 16, 2027. No GOHSEP deadline for FY 2026 FMA or BRIC was posted when checked.
- Funding
- Passes through FEMA funds
- Who
- Parishes, municipalities and other eligible sub-applicants with an adopted hazard mitigation plan
- Pays for
- GOHSEP reviews sub-applications and submits them to FEMA. Recent declarations: DR-4927 (Tropical Storm Arthur, Jun 30, 2026), HMGP requested but not granted as of Sep 2026; DR-4900 (winter storm, Feb 18, 2026), HMGP denied; DR-4817 (Hurricane Francine, Sep 16, 2024) includes HMGP.
Ask your GOHSEP State Applicant Liaison for portal access and deadlines. In the FY 2024 cycle GOHSEP's dates came weeks before FEMA's: BRIC sub-applications were due Jun 25, 2026 and FMA Jul 8, 2026. GOHSEP sent 42 BRIC sub-applications ($353M federal share) and 47 FMA sub-applications.
How NEER helps: Hazard mitigation plan action items and benefit-cost analysis backed by flood models.