Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Louisiana · Status checked November 16, 2026

Water Sector Program, Phase 2 grants

Water Sector Commission; Office of Community Development, Local Government Assistance (OCD-LGA)

Next cycleGrantDrinking waterWastewater (sewer)
Next date
No round open. The FY 2026–27 portal was open Oct 17 to Dec 1, 2025. No newer round was posted when checked; check OCD-LGA.
Funding
Up to $5M per application; consolidations up to $5M for the first system plus $2.5M per added system, max $10M. 25% match unless waived. Phase 2 got $70M a year in FY 2024–25 and FY 2025–26, plus a $5M emergency subfund each year.
Who can apply
Public water systems and community sewer systems that are not for profit. Systems funded in Rounds 1 or 2 are excluded except for consolidations and a few other cases. Nobody on the Legislative Auditor's non-compliance list.
Pays for
Compliance work, replacing failing treatment and distribution, consolidation, wastewater plant repairs, resilience to severe weather, green infrastructure.
Tip
Scored out of 140: severity 50, consolidation 20, readiness 20, sustainability 15, extra local match 15, resilience 10, match documentation 10. Applications are ranked in three population tiers (under 3,300; 3,301–10,000; over 10,000). State money can't be match; SRF loans can. Grantees must complete a state-paid rate study, and projects without a construction contract within two years can be terminated.
How NEER helps
Engineering reports and resilience assessments that earn readiness and resilience points; consolidation studies with water and sewer models.

Program page Sources [1] [2] [3]

Sources

  1. LOCD Water Sector Program
  2. Water Sector Program Phase 2 FY 2026–2027 Guidance (amended May 31, 2026)
  3. Water Sector Commission agenda, Sep 16, 2026