Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Maine water infrastructure funding

Federal, state and local grants and loans that communities in Maine can use for drinking water, wastewater and stormwater projects.

20Grant programs
5Loan programs
12Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 20Loans 5Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Late 2026
    Watch
    Maine Infrastructure Adaptation Fund 2026 award letters expectedConditional award and non-award letters for the round that closed May 11, 2026. Grant agreements follow around the end of March 2027.Maine Infrastructure Adaptation Fund (MIAF)
  2. Dec 7, 2026
    Deadline
    Casco Bay Estuary Partnership full applications due5:00 pm, for applicants invited after the Nov 6 pre-application. Up to $25,000 per project.Casco Bay Estuary Partnership Resilience and Monitoring Grants
  3. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  4. Dec 18, 2026
    Deadline
    Maine FMA subapplications due to MEMANoon, in FEMA GO. Only for applicants that sent a letter of intent by Nov 13 and passed MEMA's eligibility check.Flood Mitigation Assistance (FMA), FY2026
  5. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  6. Feb 3, 2027
    Deadline
    Maine Bond Bank General Resolution applications closePooled bond loans for water, sewer and other municipal projects. The next round is anticipated around Aug 2, 2027.Bond Bank General Resolution Program (pooled bond loans)
  7. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  8. Mar 2027estimate
    Expected
    Maine DEP Section 319 watershed grant RFPDEP issues the RFP each March. Implementation projects need a DEP-accepted watershed plan.Nonpoint Source (319) watershed project grants
  9. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  10. ~Mid-Apr 2027estimate
    Expected
    Maine Clean Water SRF FFY2027 project requests dueThe FFY2026 call closed Apr 17, 2026. Timing for FFY2027 is inferred from that cycle.Clean Water SRF loans with principal forgiveness
  11. May 2027estimate
    Expected
    Community Action Grant applications dueMOCA anticipates a May 2027 deadline for the next round, subject to change. Communities must be enrolled in the Community Resilience Partnership.Community Resilience Partnership Community Action Grants
  12. ~Jul 2027estimate
    Expected
    Maine Small Community Grant priority dateIn 2026, complete applications by Jul 6 were considered first. A 2027 date has not been posted.Small Community Grant Program (failing septic systems)
  13. ~Aug 2, 2027estimate
    Expected
    Next Maine Bond Bank General Resolution roundAnticipated date from the Bond Bank's listing. The program opens twice a year.Bond Bank General Resolution Program (pooled bond loans)
  14. Sep 30, 2027
    Deadline
    Maine Clean Water SRF FFY2026 loan agreements dueProjects with FFY2026 offers must sign a Bond Bank loan agreement by this date or may be bypassed.Clean Water SRF loans with principal forgiveness

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Maine: Apply through MEMA: a letter of intent to hmagrants@maine.gov and an eligibility check come first. The FY2026 letter of intent deadline was Nov 13, 2026, and subapplications are due to MEMA by noon Dec 18, 2026, well before FEMA's Feb 26, 2027 date.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Maine: Swift Current needs a flood-related major disaster declaration. Maine's most recent is DR-4764 (Jan 9–13, 2024 storms and flooding, declared Mar 20, 2024). MEMA's FY2023 Swift Current round is closed. Ask MEMA whether Maine qualifies.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Maine: DR-4754 (Dec 17–21, 2023 storm and flooding, declared Jan 30, 2024) and DR-4764 (Jan 9–13, 2024 storms and flooding, declared Mar 20, 2024) included hazard mitigation. MEMA lists these and DR-4785 (Apr 2024 winter storm) as closed. Ask MEMA what HMGP money remains.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Maine: MEMA takes BRIC subapplications. Its FY2020 to FY2023 rounds are closed.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Maine: Maine DEP has used these grants in its Small Community Grant Program for failing septic systems. See Maine's Small Community Grant entry.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

In Maine: The Maine CDC Drinking Water Program uses this grant with its DWSRF PFAS money, including its larger-system PFAS treatment grants. See Maine's Drinking Water SRF entry.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Maine Maine DEP runs the Clean Water SRF with the Maine Municipal Bond Bank, plus the Small Community Grant, overboard discharge, Section 319 and lake stormwater grants; the Maine CDC Drinking Water Program runs the Drinking Water SRF and its PFAS grants with the Bond Bank; MaineDOT runs the Maine Infrastructure Adaptation Fund and the Municipal Stream Crossing Program; the Maine Office of Community Affairs runs Community Resilience Partnership and coastal planning grants; DECD's Office of Community Development runs CDBG; the Maine Emergency Management Agency (MEMA) runs FEMA hazard mitigation.

Clean Water SRF loans with principal forgiveness

Maine DEP, with the Maine Municipal Bond Bank
Opening soon
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
FFY2026 project requests closed Apr 17, 2026; final FFY2026 plan issued Sep 2026. FFY2027 call expected around April 2027. Projects with FFY2026 offers must sign a Bond Bank loan agreement by Sep 30, 2027.
Funding
FFY2026: about $82M in offers, with about $12.9M in principal forgiveness. Affordability forgiveness up to $1M per applicant; fiscal sustainability plan up to $50K; climate adaptation plan up to $30K; emerging contaminants up to $395,040, 100% forgiven. Loans at or below the municipal tax-exempt rate, up to 30 years.
Who
Municipalities, quasi-municipal entities and districts; public and private entities for nonpoint source and stormwater projects
Pays for
Planning, design and construction of wastewater treatment and collection, CSO work, stormwater projects, nonpoint source work, landfill closures and sand/salt sheds. Also standalone fiscal sustainability and climate adaptation plans.

DEP ranks projects with its Environmental Priority Point System, and ties are ordered by MHI, lowest first. The Bond Bank pairs 0% program money with market-rate bond money, so the blended rate stays below market. FFY2026 was the last year of extra IIJA (BIL) money in the plan. DEP's State Municipal Wastewater Grant Program also lists planning and design grants of up to $10,000 (25% of cost).

How NEER helps: Facility plans, fiscal sustainability plans and climate adaptation plans built on calibrated sewer and stormwater models.

Drinking Water SRF, incl. PFAS and lead service lines

Maine CDC Drinking Water Program, with the Maine Municipal Bond Bank
Open now
LoanGrant (principal forgiveness; pfas grants are 100% forgiven loans)Drinking water
Next date
Applications for 2027 funding opened Sep 2026 through the program's online form. No 2027 deadline posted; check the agency. PFAS grants and land acquisition loans are rolling.
Funding
2026 draft plan: $53.7M for base and supplemental projects and $7.1M for PFAS. Disadvantaged systems get 20, 35, 50, 65 or 85% forgiveness. $5M cap per system per year; $10M cap per system for PFAS. Loans at or below market rate, at least 1%, up to 20 years (30 for disadvantaged systems).
Who
Community and nonprofit non-community public water systems. Disadvantaged: residential MHI of $74,733 or less, or an average water bill at or above 0.8% of MHI.
Pays for
Sources, treatment, storage, mains, consolidation, meters and backflow, and main extensions to private wells with PFAS. PFAS grants cover treatment, design and pilots, consolidation and well extensions.

PFAS money in the 2026 plan was asked for at about eight times what was available, so apply early. Large-system PFAS grants pay 100% under $250K and 90% above. Well extensions get $100K per connection, up to $2M. Maine did not request IIJA lead service line money for 2026: its inventory found only 26 lead lines, and 18% of lines were unknown. Manufactured housing communities get extra priority points and the top forgiveness tier. Smaller grants include capacity development (up to $30K) and system consolidation (up to $150K).

How NEER helps: Water system models for PFAS treatment, consolidation and main extension alternatives; service line material prediction for unknown lines.

GrantWastewater (sewer)
Next date
Applications reviewed as received; 2026 money is very limited. Complete applications by Jul 6, 2026 were considered first for EPA sewer overflow and stormwater grant money.
Funding
25% to 100% of design and construction for homes, by income (100% up to $38,221; none above $84,086). 25% or 50% for seasonal homes and businesses. 90% for municipal systems that collect user fees.
Who
Municipalities, applying for owners of malfunctioning septic systems that pollute a waterbody or cause a public nuisance
Pays for
Replacement of failing septic systems. Priority goes to systems that contaminate a drinking water supply or shellfish area, then those that discharge to water, then nuisances.

Pollution must be documented. Grants are reimbursements after construction, and the town bids the work. DEP's Overboard Discharge Elimination Program, also rolling, funds removing licensed overboard discharges, with shellfish areas first.

How NEER helps: Alternatives studies that compare septic replacement with sewer extension.

GrantStormwater & floodWastewater (sewer)Drinking water
Next date
2026 round closed May 11, 2026. Award letters expected late 2026; grant agreements around end of March 2027. No future round announced; check the agency.
Funding
2026 round: $14M, up to $3M per award, 5% local match (cash or in-kind). Earlier rounds capped scoping and design at $50K to $75K and construction at $125K to $4M.
Who
Municipalities, tribal governments and infrastructure districts, for publicly owned infrastructure
Pays for
Scoping, design and construction to make existing infrastructure resilient to flooding and sea level rise: stormwater, wastewater and drinking water upgrades, culverts and stream crossings, and road elevation or relocation.

Reimbursement only, and new facilities aren't eligible. The 2026 round used NOAA Climate Resilience Regional Challenge money, so terms can change with the funding source. 2026 projects must be finished by Sep 30, 2029, with no extensions.

How NEER helps: Flood and stormwater models that show the vulnerability and size the fix.

Community Resilience Partnership Community Action Grants

Maine Office of Community Affairs (MOCA)
Opening soon
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Round 7 closed Jun 5, 2026. Next round anticipated with a May 2027 deadline. Enrollment in the Partnership is open anytime.
Funding
$5K to $75K for one community; up to $175K for a joint application. No match for actions on the Partnership's list; otherwise 10% (under 10,000 people) or 20%.
Who
Municipalities, tribal governments, plantations, townships and unorganized territories enrolled in the Partnership. Water and sewer districts can't be the lead applicant.
Pays for
Planning, design and construction for climate resilience and energy. Action F18 covers drinking water, wastewater and stormwater facilities, culverts and sewers.

The program prefers proactive resilience work over deferred maintenance. Design of road and culvert fixes fits its award size well; it points larger construction to the Infrastructure Adaptation Fund. You can enroll and apply at the same time.

How NEER helps: Vulnerability assessments and culvert and stormwater design backed by flood models.

GrantStormwater & flood
Next date
No future rounds scheduled. The last round was in early 2024.
Funding
Last round: up to $200K, with a $5,000 local match
Who
Municipalities, for crossings under town-owned roads
Pays for
Replacing culverts and stream crossings to meet MaineDOT's 100-year flood standard and pass fish and wildlife.

Replacements had to span 1.2 times bankfull width, with plans stamped by a Maine PE. With no round planned, look to the Infrastructure Adaptation Fund or Community Action Grants for culvert work.

How NEER helps: Hydraulic and hydrologic analysis to size crossings.

CDBG Public Infrastructure grants

Maine DECD, Office of Community Development
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted only in even years. The 2026 round closed (letters of intent Jan 16, applications by invitation Mar 13). Next round expected early 2028.
Funding
Up to $1M for water, sewer and storm drainage projects. 25% cash match, which can be other non-CDBG loans and grants.
Who
Non-entitlement cities and towns; at least 51% low-to-moderate income beneficiaries
Pays for
Gap funding for water and sewer installation and improvements, hookups, storm drainage and related public infrastructure.

The LMI benefit must be shown at the letter of intent, by Census data or a certified income survey, so start a survey well ahead. Water and sewer work can't be mixed with housing infrastructure in one application.

How NEER helps: Engineering support to define the project and its service area.

MEMA hazard mitigation intake (FMA, HMGP, BRIC)

Maine Emergency Management Agency
Open now
GrantStormwater & flood
Next date
FY2026 FMA: letters of intent closed Nov 13, 2026; FEMA GO subapplications due to MEMA by noon Dec 18, 2026. All listed HMGP and BRIC rounds are closed.
Funding
Passes through FEMA funds. FMA: up to $10M, 25% non-federal match, less for repetitive loss properties.
Who
Towns, counties, special districts, state agencies and tribes with a FEMA-approved hazard mitigation plan; NFIP participation for FMA
Pays for
MEMA is the applicant for FEMA mitigation grants and submits local subapplications.

Send the letter of intent to hmagrants@maine.gov before starting in FEMA GO; MEMA won't submit subapplications that skipped it. HMGP rounds for DR-4754 (Dec 17–21, 2023 storm), DR-4764 (Jan 9–13, 2024 storms) and DR-4785 (Apr 2024 winter storm) are closed, and FEMA is still reviewing some. FEMA data showed no Maine major disaster declarations after May 2024 when checked. MEMA holds FMA office hours Wednesdays 2 to 3 pm.

How NEER helps: Flood models and benefit-cost support for FMA and HMGP subapplications.

LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Current round closes Feb 3, 2027. Next round anticipated around Aug 2, 2027.
Funding
No minimum or maximum. Market rates, 5 to 30 years, not past the asset's useful life. The Bond Bank pays most issuance costs.
Who
Towns, cities, counties, school systems, water and sewer districts and other Maine governmental entities
Pays for
Municipal capital projects, including sewage treatment plant and water system upgrades.

The Bond Bank usually sells bonds in spring and fall. No prepayment is allowed. Use the SRFs first when a project qualifies for forgiveness.

How NEER helps: Capital plans that size and phase the work.

GrantStormwater & flood
Next date
DEP issues the RFP each March; 2027 RFP expected around March 2027
Funding
Check the agency; amounts and match are set in each RFP
Who
Applicants in DEP's NPS Priority Watersheds
Pays for
Watershed-based plans, and implementation projects under a DEP-accepted plan that hasn't expired.

Implementation money needs an accepted watershed plan, so check the expiration list first. Separately, DEP's Lake Stormwater Compensation Fund pays for phosphorus-reducing stormwater work in listed lake watersheds, on a rolling basis through county soil and water districts and lake associations.

How NEER helps: Watershed and stormwater models for plans and BMP siting.

Coastal Community and Shore and Harbor Planning Grants

Maine Office of Community Affairs (Maine Coastal Program and Municipal Planning Assistance Program)
Next cycle
GrantStormwater & flood
Next date
FY27 applications closed Aug 31, 2026; awards anticipated Oct 2026. Next round not announced; check the agency.
Funding
FY27: about $450K total; $5K to $50K per applicant, up to $75K for joint projects
Who
Municipalities, unorganized townships and tribal governments in Maine's coastal zone; coastal regional councils can apply for them
Pays for
Planning for flooding and storm surge, resilient infrastructure design, nature-based and low-impact stormwater planning, and polluted runoff work in NPS Priority Watersheds.

A 2026 award paid for stormwater modeling and flood mitigation strategies in South Portland's Mill Creek watershed. FY27 projects can't start until NOAA's review is done and must finish by Mar 31, 2028.

How NEER helps: Stormwater and coastal flood models for planning studies.

Local and regional County and regional cost-share programs.

Next cycle
GrantStormwater & flood
Next date
Fall 2026 pre-applications closed Nov 6, 2026; invited full applications due Dec 7, 2026. Next round not announced.
Funding
Up to $25K per project
Who
Communities and organizations in the Casco Bay watershed
Pays for
Projects that improve community climate resilience, ecosystem health and environmental monitoring.

Only applicants invited after the pre-application can submit a full application.

How NEER helps: Small stormwater and flood studies that set up larger state applications.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Maine DEP: Clean Water State Revolving Fund
  21. Maine CWSRF FFY 2026 Intended Use Plan (Sep 2026)
  22. Maine Municipal Bond Bank: Clean Water SRF Program
  23. MOCA funding listing: State Municipal Wastewater Grant Program - Planning
  24. Maine CDC: Drinking Water State Revolving Fund resources
  25. Maine DWSRF Draft 2026 Intended Use Plan
  26. Maine CDC Drinking Water Program: 2026 Available Grants and Loans
  27. Maine Municipal Bond Bank: Drinking Water SRF Program
  28. Maine DEP: Small Community Grant Program
  29. MOCA funding listing: Overboard Discharge Elimination Program
  30. MOCA funding listing: Maine Infrastructure Adaptation Fund
  31. MaineDOT: Adaptation (MIAF, Working Waterfront Fund, Municipal Stream Crossing Program)
  32. MOCA funding listing: Community Action Grant
  33. Community Action Grant CAG2026-7 Program Statement
  34. MOCA: Community Resilience Partnership
  35. State of Maine CDBG 2026 Program Statement (copy posted by Northern Maine Development Commission)
  36. MEMA: Mitigation Grants
  37. MOCA funding listing: FY2026 Flood Mitigation Assistance
  38. OpenFEMA: Maine disaster declarations since June 2023
  39. MOCA funding listing: Bond Bank General Resolution Program
  40. Maine DEP: Nonpoint Source (319) Watershed Project Grants
  41. MOCA funding listing: Lake Stormwater Compensation Fund
  42. MOCA: Coastal Community Planning Grants opportunity (FY27)
  43. MOCA news: $649,975 in coastal planning grants (Jun 3, 2026)
  44. Casco Bay Estuary Partnership: Grant Opportunities