Mississippi water infrastructure funding

Federal, state and local grants and loans that communities in Mississippi can use for drinking water, wastewater and stormwater projects.

17Grant programs
7Loan programs
16Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 17Loans 7Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Nov 30, 2026
    Deadline
    Mississippi SMLPC grant applications dueExtended deadline. Submit in MDA's SMLPC portal; up to $1M for small towns and counties.Small Municipalities and Limited Population Counties Grant (SMLPC)
  2. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  3. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  4. Feb 2027estimate
    Expected
    Mississippi CDBG application workshopMDA held its 2026 CDBG application workshop Feb 19, 2026.CDBG Public Facilities
  5. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  6. Mar 1, 2027
    Deadline
    Mississippi Clean Water SRF FY-27 loan applications dueComplete WPCRLF loan application and documents to MDEQ. Priority System deadline.Water Pollution Control Revolving Loan Fund (WPCRLF), Mississippi's Clean Water SRF
  7. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  8. Mar 2027estimate
    Expected
    Mississippi CDBG water viability documents dueFor Public Facilities water applications. The 2026 date was Mar 20.CDBG Public Facilities
  9. Apr 15, 2027estimate
    Expected
    Mississippi Clean Water SRF FY-28 ranking requestsThe FY-27 Request for Ranking form was due Apr 15, 2026.Water Pollution Control Revolving Loan Fund (WPCRLF), Mississippi's Clean Water SRF
  10. May 1, 2027estimate
    Expected
    Mississippi Drinking Water SRF loan applicationsThe FFY-2025 plan set May 1 for complete DWSIRLF loan applications. Confirm in the current plan.Drinking Water Systems Improvements Revolving Loan Fund (DWSIRLF), incl. lead service lines and PFAS
  11. Late May 2027estimate
    Expected
    Mississippi CDBG Public Facilities applications2026 applications were due May 25–29, 2026.CDBG Public Facilities
  12. Jun–Jul 2027estimate
    Expected
    Mississippi Gulf Coast Restoration Fund applicationsThe 2026 window ran Jun 1 to Jul 31 for the six coastal counties.Gulf Coast Restoration Fund (GCRF)
  13. Aug 1, 2027
    Deadline
    Mississippi Clean Water SRF FY-27 approvable documents dueAll documents and responses to MDEQ comments needed for loan award.Water Pollution Control Revolving Loan Fund (WPCRLF), Mississippi's Clean Water SRF
  14. Early Oct 2027estimate
    Expected
    Mississippi Drinking Water SRF facilities plansThe FFY-2025 plan required complete facilities plans by Oct 2 of the prior year.Drinking Water Systems Improvements Revolving Loan Fund (DWSIRLF), incl. lead service lines and PFAS
  15. Nov 1, 2027estimate
    Expected
    Mississippi Clean Water SRF FY-28 facilities plansOnly projects with a complete facilities plan by Nov 1 are ranked on the priority list.Water Pollution Control Revolving Loan Fund (WPCRLF), Mississippi's Clean Water SRF

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Mississippi: Apply through MEMA in FEMA GO after sending a Notice of Intent. MEMA hadn't posted its FY2026 FMA deadline when checked; for the FY2024 round its deadline (Jul 10, 2026) came about four weeks before FEMA's. See Mississippi's hazard mitigation entry.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Mississippi: Ask MEMA (mitigationgrants@mema.ms.gov) whether Swift Current was triggered for DR-4930 (Tropical Storm Arthur) or another recent flood declaration.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Mississippi: Through MEMA. DR-4790 (storms and flooding, declared Jun 10, 2024) includes HMGP. OpenFEMA lists no HMGP for DR-4874 (May 21, 2025), DR-4899 (Winter Storm Fern, Feb 6, 2026), DR-4922 (Jun 30, 2026) or DR-4930 (Tropical Storm Arthur, Aug 3, 2026). Ask MEMA what intake is open.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Mississippi: Through MEMA. Its FY2024–25 sub-application deadline was Jun 12, 2026, ahead of FEMA's Jul 23, 2026.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Mississippi MDEQ runs the Clean Water SRF (Water Pollution Control Revolving Loan Fund), its emergency loan fund, Section 319 grants and the closed MCWI grants; the Local Governments and Rural Water Systems Improvements Board at MSDH runs the Drinking Water SRF and emergency loans; MDA runs CDBG Public Facilities, SMLPC grants, CAP loans and the Gulf Coast Restoration Fund; MEMA runs hazard mitigation.

Water Pollution Control Revolving Loan Fund (WPCRLF), Mississippi's Clean Water SRF

Mississippi Department of Environmental Quality (MDEQ), Construction Branch
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
FY-27 facilities plans were due Nov 1, 2026. FY-27 loan applications due Mar 1, 2027; approvable documents Aug 1, 2027. FY-28 ranking requests expected around Apr 15, 2027 and facilities plans around Nov 1, 2027.
Funding
FY-27: over $50M in loans expected, with at least $15M in subsidy. Subsidy is 80% principal forgiveness, up to $4M per applicant per year. FY-27 rates: 1.75% for 20 years, 2.75% for 30 years.
Who
Counties, municipalities, utility districts, authorities and other public entities
Pays for
Wastewater treatment and collection, sewer rehab and I/I removal, overflow elimination, new collection for existing homes, stormwater and nonpoint source projects.

Projects are ranked only if the complete facilities plan is in by Nov 1; late plans go on the next year's planning list and are funded only as catch-up projects if money remains. Subsidy Tier 1 is service areas of 4,000 or fewer people with MHI of $40,000 or less; Tier 2 scores the project area on six affordability factors and needs at least one point. FY-26 is the last year of IIJA supplemental money. MDEQ says it is still deciding how to use emerging contaminant funds and asks systems with PFAS needs to contact it.

How NEER helps: Facility plans built on calibrated sewer models; overflow, I/I and capacity studies; project area maps for Tier 2 subsidy.

Water Pollution Control Emergency Loan Fund (WPCELF)

Mississippi Department of Environmental Quality (MDEQ)
Rolling
LoanWastewater (sewer)
Next date
Anytime. Call MDEQ for a pre-commitment emergency determination.
Funding
Up to $350,000 at 4% for up to 10 years, plus a 5% administrative fee. About $3.9M available as of Feb 2026.
Who
Public entities and political subdivisions
Pays for
Emergency construction, repair or replacement of wastewater collection and treatment facilities.

State-funded, so no federal requirements. Costs can't start more than 90 days before the pre-commitment letter or loan application.

Drinking Water Systems Improvements Revolving Loan Fund (DWSIRLF), incl. lead service lines and PFAS

Local Governments and Rural Water Systems Improvements Board, with the Mississippi State Department of Health (MSDH) Bureau of Public Water Supply
Check agency
LoanGrant (principal forgiveness)Drinking water
Next date
The FFY-2026 plan was not on MSDH's plan page when checked. Under the FFY-2025 plan, facilities plans were due early October, loan applications May 1 and approvable documents Aug 1. Expect a loan application deadline around May 1, 2027.
Funding
FFY-2025: loans up to $5M per borrower at 1.95% or less, 20-year standard term (up to 40 years for disadvantaged). Base forgiveness of 15% to 45% by MHI, capped at $500K per loan; IIJA supplemental funds give 100% forgiveness to top-ranked systems with MHI under $54,915. Lead lines (FFY-2024 plan): 0% loans, forgiveness up to 70% of the loan. Emerging contaminants (FFY-2024 plan): 0% loans with 100% forgiveness.
Who
Public, tax-exempt water systems, including counties, municipalities, districts and nonprofit water associations
Pays for
Treatment, wells, storage, distribution, consolidation, lead service line inventories and replacement, and PFAS and other emerging contaminant projects.

Use MSDH's electronic loan portal. One loan per borrower per year. Lead line projects must replace the whole line, public and private sides, up to premise plumbing; inventory loans have 5- to 10-year terms. Projects mainly for fire protection or future growth aren't eligible. Jackson's federal supplemental appropriation is a separate plan for the City of Jackson only.

How NEER helps: Lead service line material prediction; water system models for facilities plans and PFAS treatment options.

Drinking Water Emergency Loan Program

Local Governments and Rural Water Systems Improvements Board, with MSDH
Rolling
LoanDrinking water
Next date
First come, first served until funds are obligated
Funding
No set maximum. 2.0% for up to 5 years after completion.
Who
Counties, municipalities, districts and other tax-exempt water organizations
Pays for
Repair, replacement or construction of drinking water facilities that meet the Board's definition of an emergency.

Processing takes 30 to 60 days, and work can start while the application is reviewed. Counties and cities repay through withheld homestead or sales tax distributions.

CDBG Public Facilities

Mississippi Development Authority (MDA), Community Incentives Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 applications were due May 25–29, 2026. The 2027 cycle is expected on the same pattern: application workshop around February, water viability documents around March, applications late May 2027.
Funding
FY2026 plan: $100,000 to $750,000 (Regular Government); up to $600,000 for governments of 3,500 or fewer (Small Government). About $13.2M for Public Facilities.
Who
Non-entitlement cities and counties; at least 51% low-to-moderate income beneficiaries
Pays for
Water, wastewater and drainage improvements, streets and some public buildings.

Applicants can't have an open Public Facilities grant or unresolved audit findings, and closeout packages for older grants are due in April. Water applications need water viability documents by a March date. In May 2026 the state announced $23M in awards, most of them sewer and water projects.

How NEER helps: Engineering reports and drainage studies that define need and readiness.

Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications due Nov 30, 2026 in MDA's SMLPC portal
Funding
Up to $1M per applicant; $10M in bonds for the round. Soft costs limited to 15%.
Who
Municipalities of 10,000 or fewer, counties of 30,000 or fewer, and natural gas districts
Pays for
Water, sewer, street and drainage improvements, downtown work and public buildings. Projects tied to economic development score highest.

Match isn't required, but a committed match (10% under 3,500 people, 20% above) earns preference points. Water, sewer and drainage work with no economic development tie ranks third of four priorities.

Capital Improvements Revolving Loan Program (CAP)

Mississippi Development Authority (MDA)
Check agency
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Check the agency
Funding
Community projects up to $1.25M per applicant per year; economic development projects up to $20,000 per job or $2.5M. 2% tax-exempt, 3% taxable, up to 20 years.
Who
Counties and incorporated municipalities
Pays for
Water and sewer construction or repair, and drainage for industrial development, among other public improvements.

Funds must be spent within two years of approval. Only 8% of the loan can pay for design.

Gulf Coast Restoration Fund (GCRF)

Mississippi Development Authority (MDA), with the GCRF Advisory Board and the Legislature
Next cycle
GrantDrinking waterWastewater (sewer)
Next date
2026 window ran Jun 1 to Jul 31, 2026. Next window expected around June–July 2027.
Funding
About $30M a year in BP settlement money through 2033. The Legislature approved more than $41M in 2026, including $1.03M for a George County industrial park water system and $2.55M for a Stone County industrial park sewer project.
Who
Local governments, nonprofits, schools, ports, airports, public-private partnerships, businesses and economic development groups in the six southernmost counties
Pays for
Projects that bring economic activity to the Coast, including water and sewer infrastructure for development sites.

The advisory board recommends projects, but the Legislature picks them in its session. Tie water and sewer work to jobs or development.

Section 319 Nonpoint Source grants

Mississippi Department of Environmental Quality (MDEQ), Nonpoint Source Program
Check agency
GrantStormwater & flood
Next date
Check the agency. Start with your basin team coordinator.
Funding
About $4.5M a year statewide; 60% grant, 40% project match
Who
State agencies, local governments, universities and nonprofits
Pays for
Polluted runoff projects: demonstration, monitoring, restoration, education and technical assistance.

Priorities follow MDEQ's rotating five-year basin cycle, so ask when your basin is up.

How NEER helps: Watershed and runoff models to target practices.

Next cycle
GrantMatch helpDrinking waterWastewater (sewer)Stormwater & flood
Next date
No new round announced; check the agency.
Funding
MCWI: $450M in ARPA money, raised by $41M in 2023 so every eligible project was funded. ARPA Rural: $300M, up to $2.5M per association.
Who
MCWI: counties, municipalities and public utilities not regulated by the PSC. ARPA Rural: nonprofit water associations.
Pays for
Drinking water, wastewater and stormwater projects matched with local ARPA money.

Just under 500 MCWI projects were submitted over two rounds. ARPA money had to be obligated by the end of 2024 and spent by the end of 2026. No state successor program was found.

MEMA hazard mitigation intake (FMA, BRIC, HMGP)

Mississippi Emergency Management Agency (MEMA), Office of Mitigation
Open now
GrantStormwater & flood
Next date
Send a Notice of Intent to mitigationgrants@mema.ms.gov to start any application. MEMA had not posted FY2026 FMA dates when checked; FEMA's deadline is Feb 26, 2027.
Funding
Passes through FEMA funds. FMA: 75% federal, up to 90% for small impoverished communities and repetitive loss, 100% for severe repetitive loss. HMGP: up to 75%.
Who
Counties, municipalities, special districts, tribes and eligible nonprofits with an adopted hazard mitigation plan
Pays for
MEMA reviews sub-applications in FEMA GO and submits them to FEMA. FMA covers stormwater, drainage, detention, culverts and floodplain restoration as well as buildings. Recent declarations: DR-4930 (Tropical Storm Arthur, Aug 3, 2026), DR-4922 (storms and flooding, Jun 30, 2026), DR-4899 (Winter Storm Fern, Feb 6, 2026) and DR-4874 (storms and flooding, May 21, 2025), with no HMGP listed in OpenFEMA; DR-4790 (storms and flooding, Jun 10, 2024) includes HMGP.

MEMA's dates come weeks before FEMA's. For the FY2024 round MEMA wanted BRIC sub-applications by Jun 12, 2026 and FMA by Jul 10, 2026. FMA needs a scope, cost estimate, BCA, EHP information and proof of NFIP and mitigation plan eligibility.

How NEER helps: Hazard mitigation plan action items and benefit-cost analysis backed by flood and drainage models.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. MDEQ: Water Pollution Control (Clean Water) Revolving Loan Fund Program
  21. MDEQ: WPCRLF FY-27 Funds Availability Notification (Feb 10, 2026)
  22. MDEQ: Final FY-2026 WPCRLF Intended Use Plan (adopted May 28, 2026)
  23. MDEQ: WPCRLF Request for Ranking form, FY2027
  24. MDEQ: Water Pollution Control Emergency Loan Fund Program
  25. MSDH: Drinking Water Revolving Loan Fund
  26. MSDH: Intended Use Plans
  27. MSDH: DWSIRLF FFY-2025 Intended Use Plan (approved Jul 25, 2025)
  28. MSDH: IIJA Lead Service Line Replacement Intended Use Plan for FFY-2024 (approved May 2, 2025)
  29. MSDH: IIJA Emerging Contaminants Intended Use Plan for FFY-2024 (approved May 2, 2025)
  30. MSDH: Disaster Relief Supplemental Appropriation (City of Jackson) Intended Use Plan amendment
  31. MDA: Community resources forms library (CDBG Public Facilities, CAP, SMLPC)
  32. MDA: State of Mississippi 2026 Annual Action Plan (draft)
  33. MDA CID Instruction #26-001: 2026 CDBG Application Workshop
  34. MDA CID Instruction #26-002 (updated): Upcoming 2026 Due Dates and Deadlines
  35. Governor's office: Over $23 million in CDBG Public Facilities awards (May 18, 2026)
  36. MDA CID Instruction #26-008: SMLPC application process (Aug 25, 2026)
  37. MDA CID Notice #26-010: SMLPC rule amendment and intake extension (Oct 13, 2026)
  38. MDA: 2026 SMLPC Guidelines
  39. MDA: CAP Guidelines (adopted 2021)
  40. MDA: Gulf Coast Restoration Fund
  41. WLOX: Mississippi opens applications for Gulf Coast Restoration Fund grants (Jun 2, 2026)
  42. WLOX: Legislature approves $41M in Gulf Coast Restoration Funds for Coast projects (Apr 1, 2026)
  43. MDEQ: Nonpoint Source Pollution Control Grants (Section 319)
  44. MDEQ: All eligible MCWI project applications approved for funding
  45. MSDH: ARPA Rural Water Associations Infrastructure Grant Program
  46. MEMA: Hazard Mitigation
  47. MEMA: Flood Mitigation Assistance Grant (FY2024 re-opening)
  48. MEMA: Building Resilient Infrastructure and Communities
  49. FEMA: DR-4899-MS, Mississippi Severe Winter Storm
  50. FEMA: DR-4930-MS, Mississippi Tropical Storm Arthur
  51. OpenFEMA: Mississippi disaster declarations since 2024 (secondary data)