Montana DEQ, with DNRC handling loan financing
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Loan applications accepted year-round. Get on the priority list first with the WPCSRF survey form; DEQ builds the list each spring. Draft SFY2028 plan expected around late May 2027.
- Funding
- SFY2027: 2.50% loans for up to 100% of cost, terms up to 30 years or useful life; 1.75% interim construction loans up to 3 years. Forgiveness by affordability score: 40% (max $700K), 60% (max $850K) or 80% (max $1M) of the loan. About $7.3M forgiveness in the FFY26 grants. Emerging contaminant grant (about $1M a year) is 100% forgiveness.
- Who
- Cities, towns, counties, sanitary sewer districts, state agencies and other public bodies; nonpoint source projects also qualify
- Pays for
- Wastewater treatment, interceptors and collectors, I/I correction, sewer rehabilitation, CSO correction, new storm sewers and detention basins, and nonpoint source work, including stormwater.
Forgiveness needs a composite affordability score of 2.0 or more and goes first come, first served once a Uniform Application and draft plans and specs are in. Projects with a congressional earmark can't get forgiveness, and awarded projects must bid within 6 months of plan approval. SFY2027 emerging contaminant money is already assigned to listed projects, including Missoula stormwater treatment.
How NEER helps: Facility plans and preliminary engineering reports built on calibrated sewer models; I/I and stormwater studies.
Montana DEQ, with DNRC handling loan financing
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- Loan applications accepted year-round. Get on the priority list first with the DWSRF survey form (or the lead service line survey form); DEQ builds the list each spring. Draft SFY2028 plan expected around late May 2027.
- Funding
- 2.5% loans up to 100% of cost, 20 years (30 for disadvantaged systems). SFY2027 forgiveness: 50% of the loan up to $1M for disadvantaged systems; up to 60% (over 1,000 people) or 75% (1,000 or fewer) for very disadvantaged systems. Emerging contaminant grant of $7.64M (FFY26) is 100% forgiveness. Lead lines: $28.35M FFY2022 grant; up to 60% forgiveness to $2M with 1.5% on the balance.
- Who
- Public water systems, including cities, towns, districts and school systems
- Pays for
- Treatment, source development, storage, distribution mains, consolidation, lead service line inventories and replacement, and PFAS, manganese and other emerging contaminant projects.
Disadvantaged means combined water and sewer rates above Commerce's target rate. Forgiveness is for construction only, not design, and the project must be ready to bid with funding in place. Earmarked projects can't get forgiveness. When demand is high, one project can get no more than $5M. The SFY2027 emerging contaminant plan is still a draft. Lead line forgiveness terms are from the plan's SFY2023 section, and the SFY2027 lead list (about $36.5M) covers Butte-Silver Bow, Great Falls, Helena, Kalispell, Missoula and Havre at 1.5% for 20 years; confirm with DEQ.
How NEER helps: Water system models for master plans and PFAS or consolidation alternatives; lead service line material prediction.
Montana Department of Commerce, Community Development Division
Awaiting NOFO
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2029 biennium applications closed May 4, 2026. The 2027 Legislature (convenes Jan 4, 2027) decides awards. Next application deadline expected spring 2028.
- Funding
- Up to $750K, $625K or $500K depending on how user rates compare to the target rate; dollar-for-dollar match. Usually no more than $20,000 per benefited household. 41 infrastructure applications asked for $24.5M for the 2029 biennium.
- Who
- Cities, towns, counties, consolidated governments, tribal governments, county water and sewer districts and regional water authorities. Private user associations must first form a county water and sewer district.
- Pays for
- Drinking water, wastewater treatment, sanitary or storm sewer, solid waste and bridge projects that fix health and safety problems.
Applications are taken only in even-numbered years. To get the full $750K, projected combined user rates must be at least 150% of the target rate. Costs count only after the Legislature authorizes the award. Emergency grants, usually up to $30,000, are taken continuously from Jul 1 of odd years until the money runs out.
How NEER helps: Preliminary engineering reports and models that document the health and safety problem.
Montana Department of Commerce, Community Development Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2027 biennium money is fully awarded. Check Commerce for a 2029 biennium cycle after the 2027 Legislature.
- Funding
- 2027 biennium: up to $30,000, with a match of at least 20% of the total cost
- Who
- Same as MCEP construction grants
- Pays for
- Preliminary engineering reports for water, wastewater, stormwater and solid waste systems, and capital improvement plans.
In the 2027 biennium Commerce gave priority to capital improvement plans. A finished PER is what an MCEP, RRGL, SRF or CDBG construction application needs.
How NEER helps: Preliminary engineering reports and capital improvement plans backed by system models.
Montana DNRC, Conservation and Resource Development Division
Awaiting NOFO
GrantLoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2026 cycle closed May 15, 2026; ranking posted Nov 16, 2026. Legislature acts on HB 6 from January to June 2027; agreements no earlier than Jul 1, 2027. Next cycle: May 2028.
- Funding
- Up to $125,000 per grant. No match required, but scoring counts committed local funds. $250 application fee. RRGL also makes loans; check DNRC for terms.
- Who
- Cities, towns, counties, water and sewer districts, conservation and irrigation districts, tribal governments and state agencies
- Pays for
- Projects that conserve, manage, develop or protect renewable resources, including drinking water and wastewater improvements.
RRGL is commonly paired with MCEP, SRF and CDBG money on the same project. DNRC also has emergency grants and a small grant for private water systems.
How NEER helps: Technical narratives and engineering reports showing the water resource benefit.
Montana DNRC, Conservation and Resource Development Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Not accepting applications now. The cycle usually opens late summer to early fall; next expected around Aug to Sep 2027.
- Funding
- $40,000 for a preliminary engineering report; $30,000 for a technical narrative; $20,000 for PER updates, capital improvement plans, design-only work or asset management plans. No match required.
- Who
- Government entities such as cities, towns, counties, water and sewer districts and tribal governments
- Pays for
- Professional and technical services to produce an RRG project grant application: PERs, feasibility studies and design.
DNRC may award only one planning grant per applicant per cycle, so send one priority application. DNRC also offers technical assistance for local governments without an engineering firm.
How NEER helps: Preliminary engineering reports and capital improvement plans backed by system models.
Montana Department of Commerce, CDBG Program
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2026 applications closed Oct 30, 2026. Next cycle expected around October 2027.
- Funding
- Up to $750,000, with a 25% match unless a hardship waiver is approved
- Who
- Counties, incorporated cities and towns, and consolidated city-county governments. Counties apply for problems inside county water and sewer districts.
- Pays for
- Water, wastewater, storm water, flood and drainage, and other public facilities where at least 51% of beneficiaries are low to moderate income.
Water and sewer projects are area-wide, so applicants must document that at least 51% of the people served are LMI. More than $20,000 per LMI household needs a written justification. Apply through the Montana Grants and Loans Portal.
How NEER helps: Preliminary engineering reports and drainage studies that define the project.
Montana Disaster and Emergency Services, Mitigation Bureau
Open now
GrantStormwater & flood
- Next date
- FY2026 FMA: complete application packets due to MT DES by Jan 29, 2027; MT DES submits to FEMA by Feb 26, 2027. Start with a Notice of Intent.
- Funding
- Passes through FEMA funds. FMA: 75% federal, 90% for repetitive loss, up to 100% for severe repetitive loss. BRIC: 75%, 90% for small and impoverished communities.
- Who
- Cities, counties, special districts and tribal governments with a FEMA-approved hazard mitigation plan
- Pays for
- MT DES takes Notices of Intent for open FEMA mitigation grants, then helps eligible applicants build applications in FEMA GO.
HMGP opens 30 days after a major disaster declaration and closes 8 months after it. DR-4655 (June 2022 flooding in Carbon, Flathead, Park, Stillwater, Sweet Grass, Treasure and Yellowstone counties) had $8.86M and closed Aug 14, 2023. FEMA's data shows HMGP for 2023 and 2024 flood declarations (DR-4726, DR-4745, DR-4801) but not for the April 2026 declarations DR-4901 and DR-4902 (December 2025 storms), so ask MT DES. MT DES's BRIC deadline for the FY2024–25 round was Jul 3, 2026.
How NEER helps: Flood models and benefit-cost analysis for FMA and BRIC applications.
Montana Disaster and Emergency Services, Mitigation Bureau
Next cycle
GrantMatch helpStormwater & flood
- Next date
- Last cycle: Notice of Interest Jan 7, 2026, applications Mar 6, 2026. No new cycle posted; check the agency.
- Funding
- 75% state, 25% local. Amount per cycle set in each notice. The 2023 Legislature approved $4M a year for four years.
- Who
- Local governments, special districts, tribal organizations and state agencies with a FEMA-approved hazard mitigation plan
- Pays for
- State money for hazard mitigation projects and capability building, and to help cover the local share of FEMA mitigation grants.
Projects must match the state and local hazard mitigation plans. MT DES favors projects with a benefit-cost ratio of at least 1, a clear design and nature-based approaches.
How NEER helps: Flood models and benefit-cost analysis for mitigation projects.
Montana Board of Investments
Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Rolling. The rate resets Feb 16 each year.
- Funding
- Variable rate: 4.50% from Feb 16, 2026 to Feb 15, 2027 (5.03% without autopay). Up to 15 years or the useful life.
- Who
- Montana government units as defined in 17-5-1604, MCA
- Pays for
- Flexible loans for equipment, real property improvements, cash flow, preliminary engineering costs and grant writing.
Useful for short-term or interim needs such as paying for a PER before grant money arrives.
How NEER helps: Preliminary engineering and planning studies.
Montana Coal Board, attached to the Department of Commerce
Rolling
GrantDrinking waterWastewater (sewer)
- Next date
- Board meets quarterly. Applications for the Dec 10, 2026 meeting were due Oct 26, 2026; check Commerce for the next deadline.
- Funding
- Check the agency
- Who
- Counties, cities, towns, school districts, tribal governments and other governmental units, with at least 50% of funds going to designated coal-impacted units
- Pays for
- Grants for services or facilities needed because of growth or decline in coal mining or coal-burning plants.
Check the Coal Impact Area Report to see whether your community is designated. Apply through the Montana Grants and Loans Portal.
How NEER helps: Engineering reports for water and sewer needs tied to coal development or decline.