Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Status checked November 26, 2026

Montana water infrastructure funding

Federal, state and local grants and loans that communities in Montana can use for drinking water, wastewater and stormwater projects.

21Grant programs
6Loan programs
14Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 21Loans 6Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  2. By end of 2026estimate
    Expected
    WaterSMART Water & Energy Efficiency NOFO expectedReclamation states only.WaterSMART Water & Energy Efficiency Grants
  3. Jan 4, 2027
    Watch
    Montana Legislature convenes; MCEP and RRGL awards go before itThe Legislature decides 2029 biennium MCEP construction grants and RRGL project grants (HB 6). DNRC expects the Governor to sign HB 6 by about June 2027.Montana Coal Endowment Program (MCEP) construction grants
  4. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  5. Jan 29, 2027
    Deadline
    Montana FMA applications due to MT DESFY2026 Flood Mitigation Assistance. Submit a Notice of Intent first. MT DES submits to FEMA by Feb 26, 2027.MT DES hazard mitigation intake (FMA, BRIC, HMGP)
  6. Feb 16, 2027
    Watch
    INTERCAP loan rate resetsThe current 4.50% rate runs through Feb 15, 2027.INTERCAP loans
  7. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  8. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  9. ~Late May 2027estimate
    Expected
    Draft SFY2028 Montana SRF intended use plans and priority listsBased on last year's cycle: drafts posted May 28, 2026, public meeting Jun 18, comments to Jun 29. Covers both revolving funds.Drinking Water SRF (DWSRF), incl. lead service lines and emerging contaminants
  10. Jul 1, 2027
    Watch
    2029 biennium starts; earliest RRGL grant agreementsDNRC can't sign agreements or reimburse costs incurred before this date.Renewable Resource Grant and Loan Program (RRGL) project grants
  11. ~Aug–Sep 2027estimate
    Expected
    RRG planning grant cycle expected to openDNRC says the cycle usually opens late summer to early fall.RRG planning grants
  12. ~Oct 2027estimate
    Expected
    Montana CDBG Public and Community Facilities applicationsBased on the Oct 30, 2026 deadline. Up to $750,000.CDBG Public and Community Facilities

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Montana: Apply through MT DES. Submit a Notice of Intent; complete application packets are due Jan 29, 2027, and MT DES submits to FEMA by Feb 26, 2027. See Montana's hazard mitigation entry.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Montana: Apply through MT DES, which opens HMGP 30 days after a declaration and closes it 8 months after. DR-4655 (June 2022 Yellowstone flooding) closed in 2023. FEMA's data doesn't show HMGP for DR-4901 or DR-4902 (December 2025 storms, declared Apr 7, 2026), so ask MT DES.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Montana: MT DES ran the FY2024–25 round in Montana with a state deadline of Jul 3, 2026.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

In Montana: Glendive and Dawson County used a Section 205 study to choose a levee raise and extension for West Glendive. See Montana's hazard mitigation entry.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Opening soon
GrantDrinking water
Next date
FY2026 NOFO expected before the end of 2026
Funding
FY2026 WaterSMART Grants appropriation: $15M
Who
Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
Pays for
Water loss reduction, metering and AMI, efficiency and supply reliability projects.

In Montana: Montana is one of the 17 Reclamation states, so it is eligible.

Only the 17 Reclamation states are eligible.

How NEER helps: Water loss and pressure analysis with distribution models.

Montana Montana DEQ (SRF technical review, priority lists and intended use plans) with DNRC (SRF loan financing, Renewable Resource Grants and Loans), the Department of Commerce (Montana Coal Endowment Program, CDBG public facilities, Coal Board), Montana Disaster and Emergency Services (FMA, BRIC, HMGP and the Montana Resiliency Fund), the Board of Investments (INTERCAP loans), and the Big Sky Resort Area District in Big Sky.

Water Pollution Control SRF (WPCSRF), Montana's Clean Water SRF

Montana DEQ, with DNRC handling loan financing
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Loan applications accepted year-round. Get on the priority list first with the WPCSRF survey form; DEQ builds the list each spring. Draft SFY2028 plan expected around late May 2027.
Funding
SFY2027: 2.50% loans for up to 100% of cost, terms up to 30 years or useful life; 1.75% interim construction loans up to 3 years. Forgiveness by affordability score: 40% (max $700K), 60% (max $850K) or 80% (max $1M) of the loan. About $7.3M forgiveness in the FFY26 grants. Emerging contaminant grant (about $1M a year) is 100% forgiveness.
Who
Cities, towns, counties, sanitary sewer districts, state agencies and other public bodies; nonpoint source projects also qualify
Pays for
Wastewater treatment, interceptors and collectors, I/I correction, sewer rehabilitation, CSO correction, new storm sewers and detention basins, and nonpoint source work, including stormwater.

Forgiveness needs a composite affordability score of 2.0 or more and goes first come, first served once a Uniform Application and draft plans and specs are in. Projects with a congressional earmark can't get forgiveness, and awarded projects must bid within 6 months of plan approval. SFY2027 emerging contaminant money is already assigned to listed projects, including Missoula stormwater treatment.

How NEER helps: Facility plans and preliminary engineering reports built on calibrated sewer models; I/I and stormwater studies.

Open now
LoanGrant (principal forgiveness)Drinking water
Next date
Loan applications accepted year-round. Get on the priority list first with the DWSRF survey form (or the lead service line survey form); DEQ builds the list each spring. Draft SFY2028 plan expected around late May 2027.
Funding
2.5% loans up to 100% of cost, 20 years (30 for disadvantaged systems). SFY2027 forgiveness: 50% of the loan up to $1M for disadvantaged systems; up to 60% (over 1,000 people) or 75% (1,000 or fewer) for very disadvantaged systems. Emerging contaminant grant of $7.64M (FFY26) is 100% forgiveness. Lead lines: $28.35M FFY2022 grant; up to 60% forgiveness to $2M with 1.5% on the balance.
Who
Public water systems, including cities, towns, districts and school systems
Pays for
Treatment, source development, storage, distribution mains, consolidation, lead service line inventories and replacement, and PFAS, manganese and other emerging contaminant projects.

Disadvantaged means combined water and sewer rates above Commerce's target rate. Forgiveness is for construction only, not design, and the project must be ready to bid with funding in place. Earmarked projects can't get forgiveness. When demand is high, one project can get no more than $5M. The SFY2027 emerging contaminant plan is still a draft. Lead line forgiveness terms are from the plan's SFY2023 section, and the SFY2027 lead list (about $36.5M) covers Butte-Silver Bow, Great Falls, Helena, Kalispell, Missoula and Havre at 1.5% for 20 years; confirm with DEQ.

How NEER helps: Water system models for master plans and PFAS or consolidation alternatives; lead service line material prediction.

Montana Coal Endowment Program (MCEP) construction grants

Montana Department of Commerce, Community Development Division
Awaiting NOFO
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2029 biennium applications closed May 4, 2026. The 2027 Legislature (convenes Jan 4, 2027) decides awards. Next application deadline expected spring 2028.
Funding
Up to $750K, $625K or $500K depending on how user rates compare to the target rate; dollar-for-dollar match. Usually no more than $20,000 per benefited household. 41 infrastructure applications asked for $24.5M for the 2029 biennium.
Who
Cities, towns, counties, consolidated governments, tribal governments, county water and sewer districts and regional water authorities. Private user associations must first form a county water and sewer district.
Pays for
Drinking water, wastewater treatment, sanitary or storm sewer, solid waste and bridge projects that fix health and safety problems.

Applications are taken only in even-numbered years. To get the full $750K, projected combined user rates must be at least 150% of the target rate. Costs count only after the Legislature authorizes the award. Emergency grants, usually up to $30,000, are taken continuously from Jul 1 of odd years until the money runs out.

How NEER helps: Preliminary engineering reports and models that document the health and safety problem.

MCEP infrastructure planning grants

Montana Department of Commerce, Community Development Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2027 biennium money is fully awarded. Check Commerce for a 2029 biennium cycle after the 2027 Legislature.
Funding
2027 biennium: up to $30,000, with a match of at least 20% of the total cost
Who
Same as MCEP construction grants
Pays for
Preliminary engineering reports for water, wastewater, stormwater and solid waste systems, and capital improvement plans.

In the 2027 biennium Commerce gave priority to capital improvement plans. A finished PER is what an MCEP, RRGL, SRF or CDBG construction application needs.

How NEER helps: Preliminary engineering reports and capital improvement plans backed by system models.

Renewable Resource Grant and Loan Program (RRGL) project grants

Montana DNRC, Conservation and Resource Development Division
Awaiting NOFO
GrantLoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 cycle closed May 15, 2026; ranking posted Nov 16, 2026. Legislature acts on HB 6 from January to June 2027; agreements no earlier than Jul 1, 2027. Next cycle: May 2028.
Funding
Up to $125,000 per grant. No match required, but scoring counts committed local funds. $250 application fee. RRGL also makes loans; check DNRC for terms.
Who
Cities, towns, counties, water and sewer districts, conservation and irrigation districts, tribal governments and state agencies
Pays for
Projects that conserve, manage, develop or protect renewable resources, including drinking water and wastewater improvements.

RRGL is commonly paired with MCEP, SRF and CDBG money on the same project. DNRC also has emergency grants and a small grant for private water systems.

How NEER helps: Technical narratives and engineering reports showing the water resource benefit.

RRG planning grants

Montana DNRC, Conservation and Resource Development Division
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Not accepting applications now. The cycle usually opens late summer to early fall; next expected around Aug to Sep 2027.
Funding
$40,000 for a preliminary engineering report; $30,000 for a technical narrative; $20,000 for PER updates, capital improvement plans, design-only work or asset management plans. No match required.
Who
Government entities such as cities, towns, counties, water and sewer districts and tribal governments
Pays for
Professional and technical services to produce an RRG project grant application: PERs, feasibility studies and design.

DNRC may award only one planning grant per applicant per cycle, so send one priority application. DNRC also offers technical assistance for local governments without an engineering firm.

How NEER helps: Preliminary engineering reports and capital improvement plans backed by system models.

CDBG Public and Community Facilities

Montana Department of Commerce, CDBG Program
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 applications closed Oct 30, 2026. Next cycle expected around October 2027.
Funding
Up to $750,000, with a 25% match unless a hardship waiver is approved
Who
Counties, incorporated cities and towns, and consolidated city-county governments. Counties apply for problems inside county water and sewer districts.
Pays for
Water, wastewater, storm water, flood and drainage, and other public facilities where at least 51% of beneficiaries are low to moderate income.

Water and sewer projects are area-wide, so applicants must document that at least 51% of the people served are LMI. More than $20,000 per LMI household needs a written justification. Apply through the Montana Grants and Loans Portal.

How NEER helps: Preliminary engineering reports and drainage studies that define the project.

MT DES hazard mitigation intake (FMA, BRIC, HMGP)

Montana Disaster and Emergency Services, Mitigation Bureau
Open now
GrantStormwater & flood
Next date
FY2026 FMA: complete application packets due to MT DES by Jan 29, 2027; MT DES submits to FEMA by Feb 26, 2027. Start with a Notice of Intent.
Funding
Passes through FEMA funds. FMA: 75% federal, 90% for repetitive loss, up to 100% for severe repetitive loss. BRIC: 75%, 90% for small and impoverished communities.
Who
Cities, counties, special districts and tribal governments with a FEMA-approved hazard mitigation plan
Pays for
MT DES takes Notices of Intent for open FEMA mitigation grants, then helps eligible applicants build applications in FEMA GO.

HMGP opens 30 days after a major disaster declaration and closes 8 months after it. DR-4655 (June 2022 flooding in Carbon, Flathead, Park, Stillwater, Sweet Grass, Treasure and Yellowstone counties) had $8.86M and closed Aug 14, 2023. FEMA's data shows HMGP for 2023 and 2024 flood declarations (DR-4726, DR-4745, DR-4801) but not for the April 2026 declarations DR-4901 and DR-4902 (December 2025 storms), so ask MT DES. MT DES's BRIC deadline for the FY2024–25 round was Jul 3, 2026.

How NEER helps: Flood models and benefit-cost analysis for FMA and BRIC applications.

Montana Resiliency Fund

Montana Disaster and Emergency Services, Mitigation Bureau
Next cycle
GrantMatch helpStormwater & flood
Next date
Last cycle: Notice of Interest Jan 7, 2026, applications Mar 6, 2026. No new cycle posted; check the agency.
Funding
75% state, 25% local. Amount per cycle set in each notice. The 2023 Legislature approved $4M a year for four years.
Who
Local governments, special districts, tribal organizations and state agencies with a FEMA-approved hazard mitigation plan
Pays for
State money for hazard mitigation projects and capability building, and to help cover the local share of FEMA mitigation grants.

Projects must match the state and local hazard mitigation plans. MT DES favors projects with a benefit-cost ratio of at least 1, a clear design and nature-based approaches.

How NEER helps: Flood models and benefit-cost analysis for mitigation projects.

INTERCAP loans

Montana Board of Investments
Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Rolling. The rate resets Feb 16 each year.
Funding
Variable rate: 4.50% from Feb 16, 2026 to Feb 15, 2027 (5.03% without autopay). Up to 15 years or the useful life.
Who
Montana government units as defined in 17-5-1604, MCA
Pays for
Flexible loans for equipment, real property improvements, cash flow, preliminary engineering costs and grant writing.

Useful for short-term or interim needs such as paying for a PER before grant money arrives.

How NEER helps: Preliminary engineering and planning studies.

Montana Coal Board impact grants

Montana Coal Board, attached to the Department of Commerce
Rolling
GrantDrinking waterWastewater (sewer)
Next date
Board meets quarterly. Applications for the Dec 10, 2026 meeting were due Oct 26, 2026; check Commerce for the next deadline.
Funding
Check the agency
Who
Counties, cities, towns, school districts, tribal governments and other governmental units, with at least 50% of funds going to designated coal-impacted units
Pays for
Grants for services or facilities needed because of growth or decline in coal mining or coal-burning plants.

Check the Coal Impact Area Report to see whether your community is designated. Apply through the Montana Grants and Loans Portal.

How NEER helps: Engineering reports for water and sewer needs tied to coal development or decline.

Local and regional County and regional cost-share programs.

Big Sky Resort Area District resort tax grants

Big Sky Resort Area District (BSRAD)
Check agency
GrantDrinking waterWastewater (sewer)
Next date
Microgrants open year-round until funds run out. FY27 annual and large capital awards are final; the board awards annual grants each October.
Funding
Microgrants up to $25,000; small capital grants $25,000 to $1M; large capital grants over $1M. A voter-approved 1% for infrastructure is dedicated to two water and sewer projects.
Who
Government, nonprofit and other entities serving the Big Sky community
Pays for
Resort tax money for capital projects and services, including water and sewer infrastructure.

Large capital and government programming requests are reviewed in alternating years. Awards are paid by reimbursement. In 2025 the board declined an $8M Gallatin Canyon sewer request and the water and sewer district withdrew a $15M treatment plant request (Explore Big Sky reporting).

How NEER helps: Sewer and water models and alternatives studies for district expansion.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. Reclamation WaterSMART newsletter, Summer 2026
  21. Reclamation, Status of WaterSMART Program Funding Opportunities (updated Jan 21, 2025)
  22. Montana DEQ: Engineering, Infrastructure and State Revolving Fund loan programs
  23. Montana DEQ: WPCSRF Base and Supplemental IUP and Project Priority List, SFY2027 (final, updated Jul 6, 2026)
  24. Montana DEQ: WPCSRF Emerging Contaminants IUP, SFY2027 (final, Jun 17, 2026)
  25. Montana DEQ: DWSRF Base and Supplemental IUP and Project Priority List, SFY2027 (final, Jul 7, 2026)
  26. Montana DEQ: DWSRF Emerging Contaminant IUP, SFY2027 (draft)
  27. Montana DEQ: DWSRF Lead Service Line Replacement IUP, SFY2023–2027 (amended Jul 7, 2026)
  28. Montana Commerce: MCEP Project Grants
  29. Montana Commerce: 2026 MCEP Construction Application Guidelines for the 2029 Biennium
  30. Montana Commerce: MCEP Infrastructure Project Grant Applicants for the 2029 Biennium
  31. Governor's Office of Budget and Program Planning: 2029 Biennium Budget Timelines
  32. Montana Commerce: MCEP Emergency Grants
  33. Montana Commerce: MCEP Planning Grants
  34. Montana DNRC: Renewable Resource Grants and Loans
  35. Montana DNRC: RRG Project Grants
  36. Montana DNRC: RRG Project Grant Application Guidelines, 2026 cycle
  37. Montana DNRC: RRG Planning Grants
  38. Montana DNRC: RRG Planning Grant Guidelines, 2027 Biennium
  39. Montana Commerce: CDBG Public and Community Facilities
  40. Montana Commerce: CDBG Public and Community Facilities Application Guidelines (Aug 2026)
  41. Montana Commerce Weekly Roundup, Sep 24, 2026
  42. MT DES: Flood Mitigation Assistance Grant
  43. MT DES: Hazard Mitigation Grant Program
  44. MT DES: Building Resilient Infrastructure and Communities
  45. MT DES Mitigation Minute, July 2026
  46. MT DES Mitigation Minute, September 2026
  47. MT DES Mitigation Minute, July 2023 (DR-4655 deadline, state mitigation account)
  48. OpenFEMA: Disaster Declarations Summaries, Montana since 2022
  49. MT DES: Montana Resiliency Fund Notice of Funding Opportunity
  50. Montana Board of Investments: INTERCAP
  51. Montana Commerce: Montana Coal Board
  52. Big Sky Resort Area District: Resort Tax Funding
  53. Explore Big Sky: Water-sewer district discusses BSRAD funding partnership (Nov 25, 2025; news report)