Water Pollution Control SRF (WPCSRF), Montana's Clean Water SRF

Montana DEQ, with DNRC handling loan financing

Open nowLoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Loan applications accepted year-round. Get on the priority list first with the WPCSRF survey form; DEQ builds the list each spring. Draft SFY2028 plan expected around late May 2027.
Funding
SFY2027: 2.50% loans for up to 100% of cost, terms up to 30 years or useful life; 1.75% interim construction loans up to 3 years. Forgiveness by affordability score: 40% (max $700K), 60% (max $850K) or 80% (max $1M) of the loan. About $7.3M forgiveness in the FFY26 grants. Emerging contaminant grant (about $1M a year) is 100% forgiveness.
Who can apply
Cities, towns, counties, sanitary sewer districts, state agencies and other public bodies; nonpoint source projects also qualify
Pays for
Wastewater treatment, interceptors and collectors, I/I correction, sewer rehabilitation, CSO correction, new storm sewers and detention basins, and nonpoint source work, including stormwater.
Tip
Forgiveness needs a composite affordability score of 2.0 or more and goes first come, first served once a Uniform Application and draft plans and specs are in. Projects with a congressional earmark can't get forgiveness, and awarded projects must bid within 6 months of plan approval. SFY2027 emerging contaminant money is already assigned to listed projects, including Missoula stormwater treatment.
How NEER helps
Facility plans and preliminary engineering reports built on calibrated sewer models; I/I and stormwater studies.

Program page Sources [1] [2] [3]

Sources

  1. Montana DEQ: Engineering, Infrastructure and State Revolving Fund loan programs
  2. Montana DEQ: WPCSRF Base and Supplemental IUP and Project Priority List, SFY2027 (final, updated Jul 6, 2026)
  3. Montana DEQ: WPCSRF Emerging Contaminants IUP, SFY2027 (final, Jun 17, 2026)