NJDEP with the New Jersey Infrastructure Bank (I-Bank)
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Applications accepted anytime in H2LOans. Principal forgiveness goes to ready projects while it lasts. Proposed SFY2028 plan expected mid-to-late December 2026.
- Funding
- SFY2027: base loan is half interest-free DEP money and half I-Bank AAA market rate. Disadvantaged communities: 100% forgiveness up to $2M–$3M ($30M pool). CSO: 50% forgiveness up to $5M ($30M); CSO in disadvantaged communities 100% up to $7M–$8M ($30M). Stormwater resilience: 50% up to $5M ($20M). Emerging contaminants: 100% up to $10M ($34M). Terms generally 30 years, up to 45 for CSO.
- Who
- Publicly owned treatment works (towns, utility authorities, counties), private entities through a public conduit, and private colleges for nonpoint source projects
- Pays for
- Wastewater plants, sewers, CSO abatement (grey and green), stormwater, green infrastructure, harmful algal bloom work, energy and water efficiency, from planning through construction.
SFY2027 is the last year of IIJA money, and DEP warns carryover will be limited. Long-term terms lock in with the plan in force when each operable segment is certified, so certify before June 30, 2027 to get SFY2027 packages. Disadvantaged status needs an affordability score of 86.19 or less. Smaller forgiveness pools: harmful algal blooms ($18M, 50% up to $2M) and energy and water efficiency ($12M, 50% up to $2M). DEP charges a 2% origination fee, waived on the forgiven part of affordability loans. Federal OSG grants (at least 80%, rolling, municipalities only) pair with a 20% forgiveness loan.
How NEER helps: Sewer and CSO models for long-term control plan projects; I/I and stormwater resilience studies.
NJDEP with the New Jersey Infrastructure Bank (I-Bank)
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- Applications accepted anytime in H2LOans. Principal forgiveness goes to ready projects while it lasts. Proposed SFY2028 plan expected mid-to-late December 2026.
- Funding
- SFY2027: base loan half interest-free, half I-Bank market rate. Lead lines: $146M forgiveness; 80% up to $16M for the poorest systems, 50% up to $10M for other disadvantaged systems, others at 80% interest-free. Emerging contaminants incl. PFAS: 100% up to $3M ($22M). Disadvantaged systems: 100% up to $2M–$3M, or up to $10M for projects ranked 450+ points. Systems of 1,000 or fewer: 100% up to $2M. Systems of 10,000 or fewer: 50% up to $1M.
- Who
- Public and investor-owned community water systems and nonprofit noncommunity systems
- Pays for
- Treatment, mains, storage, lead and galvanized service line replacement, PFAS and other emerging contaminant treatment, resilience.
State law (P.L.2021, c.183) requires all lead service lines replaced by 2031. Lead line projects now need monthly inspection reports and data with each payment request. NJ counts galvanized lines as downstream of lead unless shown otherwise, so they qualify. A $4.5M pool (50% up to $2M) for water supply resilience is in the plan, and DEP plans a call for projects under the 1981 Water Supply Bond Act. Loan terms up to 30 years, 35 in some cases. Small or disadvantaged systems can also apply anytime for federal EC-SDC grants for PFAS.
How NEER helps: Lead service line material prediction; water system models for PFAS and resilience alternatives.
NJDEP, New Jersey Water Bank
Rolling
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Rolling, first come first served
- Funding
- Up to $2M per applicant for planning and design; participants are also offered at least $2M in principal forgiveness or the best available package for construction
- Who
- Clean water and drinking water SRF borrowers that meet the affordability criteria and have a Water Bank technical assistance contract and a project pending in H2LOans
- Pays for
- Planning and design for wastewater, stormwater, water supply and nonpoint source projects in the technical assistance scope of work.
Apply in SAGE and H2LOans, and get DEP approval of the professional services agreement. Projects that already closed on a Water Bank loan are not eligible.
How NEER helps: Planning documents and design-phase hydraulic models.
New Jersey Infrastructure Bank
Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Rolling. Next I-Bank board meeting Dec 10, 2026.
- Funding
- 0.473% APR (Nov 2026), charged only on money drawn; 0.323% with the interest rate credit. Terms up to 5 full fiscal years.
- Who
- Water Bank project sponsors
- Pays for
- Bridge financing from design contract through construction, rolled into a long-term Water Bank loan near completion. Drinking water sponsors can also use it for planning and design, including asset management plans.
Close a short-term loan when you sign the design contract to lock in the plan year's long-term terms at certification. The rate changes monthly; check the I-Bank page. Disaster areas can use SAIL loans to bridge expected FEMA money.
New Jersey Infrastructure Bank (Resilience Infrastructure Bank) with NJOEM
Rolling
LoanMatch helpStormwater & flood
- Next date
- Rolling; start with the CHAMP application portal and an application meeting
- Funding
- 1% interest, charged only on money drawn; five-year draw period, then long-term repayment
- Who
- Counties, municipalities and their authorities that meet I-Bank credit standards
- Pays for
- Hazard mitigation and resilience projects in a state or local hazard mitigation plan, from planning through construction.
Can cover the local cost share of other Stafford Act mitigation grants, but not costs already paid by a grant. Projects come from NJOEM's priority list built from the hazard mitigation plan.
How NEER helps: Flood models that tie a project to a hazard mitigation plan action.
NJDEP, Blue Acres Program
Rolling
Grant (state buys flood-prone homes; land becomes open space)Stormwater & flood
- Next date
- Homeowner applications accepted anytime and held for future federal funding notices
- Funding
- Depends on the funding pool (CDBG-DR, FEMA FMA or HMGP, state CBT emergency buyouts, NRCS EWP)
- Who
- Homeowners apply; towns are contacted when applicants in their jurisdiction are selected
- Pays for
- Voluntary buyouts of flood-prone and flood-damaged homes, kept as flood storage and open space.
Homeowners not already on file when a federal notice comes out may not be considered, so towns should encourage repeat-flood owners to apply early.
How NEER helps: Flood depth and repetitive-loss mapping to target buyout areas.
GrantStormwater & flood
- Next date
- 2026 round closed in July 2026; awards were expected September 2026. No later round announced; check the agency.
- Funding
- $200K–$350K per region, up to four regions; up to $150K of each award for community-based organizations
- Who
- NJ municipalities and counties that form a region of adjacent towns; past Resilient NJ regions cannot apply
- Pays for
- Regional resilience action plans for flooding and other climate hazards. Planning only, not construction.
The plan's project list feeds later construction applications to FEMA, DCA and the Water Bank.
How NEER helps: Regional flood models and scenario maps for the action plan.
NJ Department of Community Affairs, Division of Disaster Recovery and Mitigation
Next cycle
GrantStormwater & flood
- Next date
- Round 2 closed Sep 30, 2026. Awards expected Nov 30, 2026; agreements from Aug 31, 2027.
- Funding
- Up to $5M per project, up to 100% of cost
- Who
- Cities, townships, counties, special districts and tribes in Bergen, Essex, Hudson, Middlesex, Passaic, Somerset, Union, Gloucester, Hunterdon, Mercer, Morris or Warren counties, with a FEMA-approved hazard mitigation plan
- Pays for
- Flood risk reduction infrastructure such as pump stations, drainage and public works retrofits, elevation and floodproofing.
Projects must finish by HUD's spending deadline (now Jan 13, 2029), and Round 2 awards depend on HUD extending it. Construction cannot have started. One project per applicant.
How NEER helps: Benefit-cost and flood reduction analysis for the cost effectiveness worksheet.
NJDEP, Division of Watershed and Land Management, with Rutgers Cooperative Extension
Rolling
Grant (technical assistance; the cash grants are closed)Stormwater & flood
- Next date
- Technical help available now. Tier A MS4 assistance grants and stormwater utility feasibility grants are closed.
- Funding
- No new cash. Past rounds: $25K–$75K MS4 grants; $2M for utility feasibility studies.
- Who
- NJ municipalities, with a focus on former Tier B towns
- Pays for
- Free regional engineers for MS4 mapping, watershed improvement plans, inspections and stormwater utility guidance.
Five NJ towns had stormwater utilities as of July 2026, including Maplewood, New Brunswick and Raritan Township. A utility fee is a steady way to repay a Water Bank stormwater loan. DEP's stormwater utility mailbox is SWUtility@dep.nj.gov.
How NEER helps: Watershed improvement plans, MS4 maps and stormwater models that support a utility fee.
GrantStormwater & flood
- Next date
- Last round closed Jun 2, 2025. Next deadline TBD; check the agency.
- Funding
- Not stated; no match required
- Who
- State, regional and local governments, county planning and health departments, state colleges and nonprofits
- Pays for
- Shovel-ready watershed restoration that carries out a TMDL or watershed-based plan, finished within 3 years.
Maintenance and permit compliance are not eligible.
How NEER helps: Watershed-based plan load estimates and BMP sizing.
NJ Department of Community Affairs
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- 2026 round closed March 2026. Next application expected in SAGE around late January 2027, due around mid-March 2027.
- Funding
- Up to $400K per public facilities project (SFY2026: $4.77M for about 12 awards)
- Who
- Non-entitlement New Jersey municipalities and counties listed in the RFP; projects must mainly benefit low- and moderate-income people
- Pays for
- Construction or improvement of essential public facilities.
Attending DCA's application workshop was mandatory in 2026, and applicants must contact the program before applying. DCA may exceed $400K for compelling reasons.
How NEER helps: Engineering support to define the project.
New Jersey Office of Emergency Management, Mitigation Unit
Check agency
GrantStormwater & flood
- Next date
- NJOEM had not posted an FY2026 intake date when checked; ask well before FEMA's Feb 26, 2027 FMA deadline
- Funding
- Passes through FEMA funds
- Who
- NJ counties and municipalities; they apply on behalf of homeowners and businesses
- Pays for
- NJOEM reviews sub-applications in FEMA GO and submits them to FEMA.
In the last posted cycle NJOEM wanted sub-applications in FEMA GO about two months before FEMA's deadline (Mar 7, 2025). FMA planning and project grants need NFIP participation. Contact mitigation@njsp.gov or 609-963-6900 x6208.
How NEER helps: Benefit-cost analysis and flood models for FEMA sub-applications.