Massachusetts ยท Status checked November 16, 2026
Drinking Water SRF, incl. lead service lines and PFAS
MassDEP, with the Massachusetts Clean Water Trust
- Next date
- Lead service line planning and construction loans: apply anytime while funds last, no PEF needed. PEFs for other 2027 projects closed Jul 24, 2026; draft 2027 plan expected in December 2026. PEFs for the 2028 plan expected mid-May to end of July 2027.
- Funding
- 2026 plan (the current one): almost $434M, including six new construction projects ($167.1M), $103.4M for lead line planning and construction loans, $10M for planning and PFAS design loans and a $5M emergency reserve. Loans are 2% for 20 years. Lead line loans are 0%, and their forgiveness has been 40%. Disadvantaged Communities get 6.6%, 13.2% or 19.8% forgiveness by tier (3.3%, 6.6% or 9.9% for PFAS projects). Cybersecurity grants up to $50,000.
- Who can apply
- Public water systems; cybersecurity grants are for small systems or disadvantaged communities
- Pays for
- Treatment (including PFAS), wells, storage, transmission mains, lead service line inventory and replacement, and cybersecurity fixes.
- Tip
- The 2026 plan offered no 0% PFAS loans; PFAS projects get the standard rate plus forgiveness paid from the federal emerging contaminants grant. For 2027, top-tier PFAS projects need finished water at or above 10 ppt PFAS6. Lead line grants ran out in 2025 and aren't expected again, and lead line loan money is federal with a limited window, so apply early. The 2026 plan capped each applicant at $15M. MassDEP told one district in 2026 to file a new PEF when its PFAS project slipped past its funding window.
- How NEER helps
- Lead service line material prediction; water system models for treatment and PFAS alternatives.
Program page Sources [1] [2] [3] [4] [5] [6] [7] [8] [9] [10]