Massachusetts water infrastructure funding

Federal, state and local grants and loans that communities in Massachusetts can use for drinking water, wastewater and stormwater projects.

23Grant programs
6Loan programs
14Can apply now

Grants and loans by what they fund

Programs that offer both appear in both columns. Includes federal programs open to this state.

InfrastructureGrants 23Loans 6Match and other help 1
Drinking water
Wastewater (sewer)
Stormwater & flood

Open nowRollingCheck agencyOpening soonAwaiting NOFONext cycle

Why timing matters this cycle

Sources [1] [2] [3] [4] [5]

Key dates, next 12 months

“Expected” dates follow last year’s cycle. Confirm them with the agency.

  1. Nov 30, 2026
    Deadline
    MEMA FY2026 FMA Statement of Interest dueRequired before a Massachusetts FMA subapplication. Register for FEMA GO the same day.MEMA hazard mitigation intake (FMA, HMGP, BRIC)
  2. Dec 10, 2026
    Deadline
    Comments due on Massachusetts CDBG FFY 2027 proposed changesEmail comments to EOHLC by 5 PM. Mini-Entitlement communities send a preliminary activity list by Dec 15, 2026.Massachusetts CDBG (Community Development Fund and Mini-Entitlement)
  3. Dec 11, 2026
    Watch
    Federal continuing resolution expiresFY2027 EPA, FEMA and USDA budgets are not final. A lapse would pause federal grant processing.
  4. Dec 11, 2026
    Deadline
    MVP Planning 2.0 FY27 applications dueSubmit in the EEA Grants Management System by 11:59 PM. The request for responses was updated Nov 24, 2026.MVP Planning 2.0 grants
  5. ~Dec 2026 (expected)estimate
    Expected
    Draft 2027 SRF Intended Use PlansMassDEP says draft plans typically come out in December, followed by a 30-day comment period and a public hearing.Drinking Water SRF, incl. lead service lines and PFAS
  6. Jan 11, 2027
    Deadline
    MEMA FY2026 FMA subapplications dueDue to MEMA by 11:59 PM. Only projects whose Statement of Interest (due Nov 30, 2026) MEMA recommends go on to a full subapplication; benefit-cost analyses are due Dec 21, 2026.MEMA hazard mitigation intake (FMA, HMGP, BRIC)
  7. Dec 2026–Jan 2027estimate
    Expected
    Typical state cutoff for FMA subapplicationsStates set their own earlier deadlines. Confirm with the state emergency management agency.Flood Mitigation Assistance (FMA), FY2026
  8. ~Jan 15, 2027
    Deadline
    MWRA water and lead line loan applications for Feb 15 distributionApplications are due at least one month before each quarterly distribution (Feb 15, May 15, Aug 15, Nov 15).MWRA Local Water System Assistance Program and Lead Service Line Replacement loans
  9. ~Late Jan 2027estimate
    Expected
    ECO One Stop FY28 application period opensCovers MVP Action, Coastal Resilience, Dam and Seawall and other EEA grants. EEA says early 2027; the FY27 round opened Jan 20, 2026.MVP Action Grants (ECO One Stop)
  10. ~Late Jan 2027estimate
    Expected
    Community One Stop for Growth FY2028 Expressions of Interest openThe FY2027 round opened Jan 23, 2026.Community One Stop for Growth, incl. MassWorks Infrastructure
  11. Feb 26, 2027
    Deadline
    FEMA Flood Mitigation Assistance (FY2026) deadlineState applications due to FEMA.Flood Mitigation Assistance (FMA), FY2026
  12. ~Feb–Mar 2027estimate
    Expected
    FY2028 Community Project Funding requestsEach congressional office sets its own deadline.Community Project Funding (earmarks)
  13. ~Spring 2027estimate
    Expected
    ECO One Stop FY28 applications dueEEA says applications are due in spring 2027. The FY27 deadline was Mar 27, 2026, after an extension from Mar 20.MVP Action Grants (ECO One Stop)
  14. Mar 30, 2027 (proposed)
    Deadline
    Massachusetts CDBG FFY 2027 applications dueEOHLC proposes issuing the Community Development Fund and Mini-Entitlement applications Jan 19, 2027, due Mar 30, 2027.Massachusetts CDBG (Community Development Fund and Mini-Entitlement)
  15. ~Apr 2027estimate
    Expected
    Final 2027 SRF Intended Use PlansThe final 2026 plans were dated Apr 1, 2026. Projects that filed PEFs by Jul 24, 2026 learn whether they made the list.Clean Water SRF loans and loan forgiveness
  16. ~Early Jun 2027estimate
    Expected
    Community One Stop for Growth FY2028 full applications dueFY2027 full applications were accepted May 4 to Jun 3, 2026.Community One Stop for Growth, incl. MassWorks Infrastructure
  17. ~Jul 2027estimate
    Expected
    SRF Project Evaluation Forms for the 2028 planClean water and drinking water construction projects must file a PEF in eSRF to be considered. PEFs for the 2027 plan were due at noon on Jul 24, 2026.Drinking Water SRF, incl. lead service lines and PFAS
  18. Oct 1, 2027
    Deadline
    SRF project applications for the 2027 planProjects on the 2027 plan must submit a complete loan application with biddable plans and specifications, after appropriating the full project cost by Jun 30, 2027.Clean Water SRF loans and loan forgiveness
  19. ~Early Oct 2027estimate
    Expected
    MassDEP 604(b) proposals dueThe FY27 request for proposals was posted Aug 19, 2026 and closed Oct 7, 2026.MassDEP 604(b) and 319 water quality grants
  20. ~Late Oct 2027estimate
    Expected
    MassDEP 319 proposals dueThe FY27 request for proposals was posted Sep 2, 2026 and closed Oct 28, 2026.MassDEP 604(b) and 319 water quality grants

All programs

Filter by type, what it funds and whether it is open.

Federal Most federal water money reaches communities through the state programs below.

Flood Mitigation Assistance (FMA), FY2026

FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
Next date
Feb 26, 2027 to FEMA. State deadlines come earlier.
Funding
$400M+ nationally, including about $20M for capability and capacity building
Who
NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
Pays for
Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.

In Massachusetts: Apply through MEMA: the required Statement of Interest is due Nov 30, 2026, the benefit-cost analysis Dec 21, 2026, and subapplications Jan 11, 2027. See Massachusetts's MEMA entry.

Last year of IIJA money for FMA.

How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).

FMA Swift Current, FY2026

FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
Next date
Deadline set for each qualifying flood disaster
Funding
$600M nationally
Who
Communities in states with a qualifying major flood disaster declaration
Pays for
Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.

In Massachusetts: Swift Current needs a flood-related major disaster declaration. Massachusetts's most recent is DR-4780 (flooding that began Sep 11, 2023, declared May 15, 2024). Ask MEMA whether Massachusetts qualifies.

Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.

How NEER helps: Identify and rank repetitive loss structures with flood models.

Hazard Mitigation Grant Program (HMGP)

FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
Usually due within 12 months of the declaration. Confirm with the state.
Funding
Set as a share of each disaster’s federal assistance
Who
Jurisdictions in states with a major disaster declaration
Pays for
Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.

In Massachusetts: DR-4780 (severe storms and flooding, declared May 15, 2024) included hazard mitigation for Bristol and Worcester counties. DR-4919 (Feb 2026 winter storm, declared Jun 30, 2026) covers only the Mashpee Wampanoag Tribe. Ask MEMA what HMGP money remains.

Available only after a major disaster declaration in your state.

How NEER helps: Project definition and BCA backed by sewer and stormwater models.

Building Resilient Infrastructure & Communities (BRIC)

FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
Next date
FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
Funding
$1B for FY2024 and FY2025 combined
Who
States apply; local governments are subapplicants with an approved hazard mitigation plan
Pays for
Larger pre-disaster infrastructure projects plus capability and capacity building.

In Massachusetts: Apply through MEMA with a Statement of Interest. The FY2024–25 round is closed.

FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.

How NEER helps: Scoping studies and modeling to make projects application-ready.

Rolling
LoanDrinking waterWastewater (sewer)Stormwater & flood
Next date
Letters of interest accepted anytime
Funding
About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
Who
Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
Pays for
Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.

Suited to large utility capital programs. Can be paired with SRF financing.

How NEER helps: Capital program optimization to package projects for a WIFIA loan.

Opening soon
GrantWastewater (sewer)Stormwater & flood
Next date
FY2025–26 allotments released Apr 2026; each state sets its own call
Funding
About $80M nationally for FY2025 and FY2026
Who
Municipalities; small and financially distressed communities need no cost share
Pays for
Combined and sanitary sewer overflow control and stormwater management projects.

In Massachusetts: MassDEP takes rolling applications for these grants, up to $250,000 for planning or design in small and disadvantaged communities. See Massachusetts's Clean Water SRF entry.

Ask the state SRF program how and when it will distribute its allotment.

How NEER helps: Overflow and capacity modeling to define projects.

GrantDrinking water
Next date
Through the state drinking water program
Funding
$945.7M for FY2026, the final IIJA tranche
Who
Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
Pays for
PFAS and other emerging contaminant testing, planning and treatment. No local cost share.

EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.

How NEER helps: Source and treatment alternatives screening with water system models.

Rolling
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Applications accepted year-round through RD Apply
Funding
Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
Who
Rural areas and towns of 10,000 or fewer people
Pays for
Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.

Grants are awarded alongside a loan, not on their own.

How NEER helps: Preliminary engineering reports with hydraulic models.

Public Works & Economic Adjustment Assistance

U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
Next date
No deadline; reviewed as received
Funding
EDA total FY2026 appropriation about $466M
Who
Distressed areas; project must be consistent with the regional CEDS
Pays for
Water and wastewater infrastructure that supports job creation, such as service to an industrial park.

Tie the project to named employers and jobs. Local match is required.

How NEER helps: Capacity analysis for new industrial load.

Community Project Funding (earmarks)

Your U.S. Representative and Senators
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 requests likely due Feb–Mar 2027 (FY2027 office deadlines were early to mid March 2026)
Funding
FY2026: $893M clean water and $715M drinking water earmarks nationally
Who
Local governments and utilities with a ready project and documented local support
Pays for
One-time grants passed through the SRF accounts and other federal accounts.

Have the project description, cost estimate and support letters ready in January. Each office sets its own form and deadline.

How NEER helps: Project sheets with modeled benefits.

Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
Next date
Send a letter of request to the district anytime
Funding
Cost-shared federal study and construction
Who
Non-federal sponsors such as cities and counties
Pays for
§205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.

§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.

How NEER helps: Existing-conditions flood modeling to support the request.

Massachusetts MassDEP and the Massachusetts Clean Water Trust run both SRFs; MassDEP gives 604(b) and 319 water quality grants; EEA's ECO One Stop covers MVP Action, Coastal Resilience and Dam and Seawall grants; EOED's Community One Stop for Growth covers MassWorks; EOHLC runs state CDBG; MEMA handles hazard mitigation; MWRA and the Cape Cod and Islands Water Protection Fund help their member towns.

Clean Water SRF loans and loan forgiveness

MassDEP, with the Massachusetts Clean Water Trust
Next cycle
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Project Evaluation Forms (PEFs) for the 2027 plan closed Jul 24, 2026. Draft 2027 plan expected in December 2026, followed by a 30-day comment period and the final plan. PEFs for the 2028 plan expected mid-May to end of July 2027. Planning loans and sewer overflow (OSG) planning grants are accepted anytime with no PEF.
Funding
2026 plan (the current one): about $728M, including 29 new construction projects ($413M), 12 multi-year projects and $25M for planning, septic, OSG grants and an emergency reserve. Loans are 2% for 20 years; 30-year loans have been 2.2%; nutrient reduction projects can get 0%. Disadvantaged Communities get 3.3%, 6.6% or 9.9% of principal forgiven, by affordability tier. OSG planning or design grants up to $250,000. Nov 9, 2026: $108.1M in loan forgiveness for 46 wastewater projects.
Who
Cities, towns, districts, counties and other public borrowers
Pays for
Wastewater treatment, collection systems, CSO and SSO correction, I/I and sewer rehabilitation, stormwater and nonpoint source projects. Also planning loans, community septic loans and OSG planning grants.

Projects compete once a year: file a PEF in the eSRF portal by the end of July to get on next year's plan. Projects on the 2027 plan must appropriate the full cost by Jun 30, 2027, submit a complete application with biddable plans by Oct 1, 2027 and sign construction contracts by Jun 30, 2028. The 2026 plan capped each applicant at $50M and offered no 0% PFAS loans, and MassDEP says multi-year approval for new 2027 projects depends on available funding. Interim construction loans are 0%. The Trust has posted the 2027 affordability tiers.

How NEER helps: Sewer models for CSO, I/I and capacity projects; planning studies that support the PEF.

Drinking Water SRF, incl. lead service lines and PFAS

MassDEP, with the Massachusetts Clean Water Trust
Rolling
LoanGrant (principal forgiveness)Drinking water
Next date
Lead service line planning and construction loans: apply anytime while funds last, no PEF needed. PEFs for other 2027 projects closed Jul 24, 2026; draft 2027 plan expected in December 2026. PEFs for the 2028 plan expected mid-May to end of July 2027.
Funding
2026 plan (the current one): almost $434M, including six new construction projects ($167.1M), $103.4M for lead line planning and construction loans, $10M for planning and PFAS design loans and a $5M emergency reserve. Loans are 2% for 20 years. Lead line loans are 0%, and their forgiveness has been 40%. Disadvantaged Communities get 6.6%, 13.2% or 19.8% forgiveness by tier (3.3%, 6.6% or 9.9% for PFAS projects). Cybersecurity grants up to $50,000.
Who
Public water systems; cybersecurity grants are for small systems or disadvantaged communities
Pays for
Treatment (including PFAS), wells, storage, transmission mains, lead service line inventory and replacement, and cybersecurity fixes.

The 2026 plan offered no 0% PFAS loans; PFAS projects get the standard rate plus forgiveness paid from the federal emerging contaminants grant. For 2027, top-tier PFAS projects need finished water at or above 10 ppt PFAS6. Lead line grants ran out in 2025 and aren't expected again, and lead line loan money is federal with a limited window, so apply early. The 2026 plan capped each applicant at $15M. MassDEP told one district in 2026 to file a new PEF when its PFAS project slipped past its funding window.

How NEER helps: Lead service line material prediction; water system models for treatment and PFAS alternatives.

Asset Management Planning grants

MassDEP, with the Massachusetts Clean Water Trust
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
Paused: no applications taken for the 2027 plans. Grants from the 2026 plan and earlier are going ahead. Check the agency on the 2028 cycle.
Funding
When offered: up to 60% of cost or $150,000, whichever is less, with at least a 40% local match. The 2026 plan funded two clean water ($300K) and four drinking water ($443K) grants.
Who
Communities and utilities with wastewater, drinking water or stormwater systems
Pays for
Asset management plans for wastewater, drinking water or stormwater utilities, or any combination.

When the program runs, MassDEP favors systems serving under 10,000 people or with fewer than 3,330 connections, and first-time applicants. Staff time can cover part of the match.

How NEER helps: Asset inventories, condition and risk scoring built on network models.

MassDEP 604(b) and 319 water quality grants

MassDEP, Bureau of Water Resources, Watershed Planning Program
Next cycle
GrantStormwater & flood
Next date
FY27 rounds closed: 604(b) on Oct 7, 2026 and 319 on Oct 28, 2026. Next requests for proposals expected Aug to Sep 2027.
Funding
Check the agency
Who
Eligible entities named in each request for proposals
Pays for
604(b): finding nonpoint source water quality problems, choosing solutions and preliminary design of best management practices. 319: building those practices to cut nonpoint source pollution.

A 604(b) planning grant produces the design that a later 319 implementation grant can build. Both are posted on COMMBUYS.

How NEER helps: Stormwater and pollutant load models that pick and size the practices.

MVP Action Grants (ECO One Stop)

Executive Office of Energy and Environmental Affairs (EEA)
Opening soon
GrantStormwater & flood
Next date
FY28 Expressions of Interest closed Oct 16, 2026. FY28 application expected to open early 2027 and close in spring 2027, with awards in summer 2027. The FY27 round ran Jan 20 to Mar 27, 2026.
Funding
Up to $3M for one community, up to $5M for regional projects; 10% match, none for Tribes and designated rural and small towns. EEA says final terms come with the FY28 request for responses.
Who
MVP-designated municipalities, Tribes, and districts, boards and regional agencies applying with a municipal letter of support. Communities with older MVP plans must also apply to MVP 2.0 to stay eligible.
Pays for
Climate adaptation projects: stormwater and green infrastructure, culvert and small bridge work, dam removal, nature-based solutions and retrofit or relocation of critical infrastructure.

MVP Action is applied for through the ECO One Stop common application with Coastal Resilience, Dam and Seawall and other EEA grants. Submit an Expression of Interest in the fall to get staff feedback. Climate action plans and FEMA hazard mitigation plans aren't funded.

How NEER helps: Flood and stormwater models that define the project and show its benefit.

MVP Planning 2.0 grants

Executive Office of Energy and Environmental Affairs (EEA)
Open now
GrantStormwater & flood
Next date
FY27 applications due Dec 11, 2026, 11:59 PM, in the EEA Grants Management System
Funding
$50,000 per community or regional group for the planning steps, plus $50,000 per community for a seed project; two-year grant, no match
Who
Massachusetts municipalities (and Devens), Tribes, and regional planning agencies applying for municipalities. 32 communities with older MVP plans must apply this round to stay eligible for MVP Action grants.
Pays for
A two-year process to revisit community resilience priorities and turn them into projects, with project development support.

MVP 2.0 is applied for separately, not through ECO One Stop. The request for responses on COMMBUYS was updated and an addendum added on Nov 24, 2026; read the current version.

How NEER helps: Flood risk mapping to set priorities.

CZM Coastal Resilience Grants (ECO One Stop)

Massachusetts Office of Coastal Zone Management (CZM), EEA
Opening soon
GrantStormwater & flood
Next date
FY28 Expressions of Interest closed Oct 16, 2026. FY28 request for responses expected early 2027 through ECO One Stop.
Funding
FY27: up to $2M per project; 10% match, none for Tribes and designated rural and small towns
Who
The 78 municipalities in the Massachusetts coastal zone, certified 501(c)(3) nonprofits and Tribes
Pays for
Coastal vulnerability assessments, outreach, planning and bylaws, retrofit or relocation of vulnerable facilities such as seawalls, wastewater plants, pump stations, roads and culverts, and nature-based shoreline restoration.

FY27 grants, announced Aug 13, 2026, went to 12 recipients including Chatham, Falmouth, Hull, Revere, Salem and Wareham. The whole ECO One Stop round awarded more than $45M to 97 projects.

How NEER helps: Coastal flood and drainage models to compare options.

Dam and Seawall Repair or Removal Program (ECO One Stop)

Executive Office of Energy and Environmental Affairs (EEA)
Opening soon
GrantStormwater & flood
Next date
FY28 application period expected to open early 2027 through ECO One Stop; FY27 closed Mar 27, 2026
Funding
Design and permitting: up to $250K for dams, levees and other inland flood control, up to $500K for seawalls and coastal structures. Construction: up to $1M inland, up to $3M coastal. 10% match, none for Tribes and designated rural and small towns.
Who
Local government bodies and certified 501(c)(3) nonprofits
Pays for
Repair or removal of dams, levees, seawalls and other flood control structures.

Dams must be under DCR Office of Dam Safety jurisdiction, levees publicly owned and seawalls owned by the municipality or a nonprofit. High or significant hazard dams in poor or unsafe condition get preference. Construction applicants should have permits in hand and a MEPA filing before applying.

How NEER helps: Dam breach and flood models for design and removal studies.

Community One Stop for Growth, incl. MassWorks Infrastructure

Executive Office of Economic Development (EOED), with EOHLC and MassDevelopment
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FY2028 round expected to open early 2027. FY2027 Expressions of Interest opened Jan 23, 2026; full applications were due Jun 3, 2026.
Funding
FY2027: $330M through 403 awards in 14 programs, announced Oct 2, 2026
Who
Massachusetts public entities and their partners
Pays for
Public infrastructure tied to housing and economic development, site preparation and planning. Recent awards include well and wastewater design projects.

One application is matched to programs such as MassWorks, HousingWorks and Site Readiness. The optional Expression of Interest tells you which fit. Include a letter of support from the chief municipal officer.

How NEER helps: Water and sewer capacity studies that show the growth a project unlocks.

Massachusetts CDBG (Community Development Fund and Mini-Entitlement)

Executive Office of Housing and Livable Communities (EOHLC)
Opening soon
GrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
FFY 2027 applications proposed to open Jan 19, 2027 and close Mar 30, 2027. Comments on the proposed changes are due Dec 10, 2026; Mini-Entitlement communities send a preliminary activity list by Dec 15, 2026.
Funding
Proposed FFY 2027: $24.2M for the Community Development Fund (grants of $200,000 to $1M for one town, up to $1.25M for two and $1.45M for three or more; planning or design grants from $20,000) and up to $9M for 10 Mini-Entitlement communities (up to $900,000 each)
Who
Municipalities that are not HUD entitlement communities. Mini-Entitlement: Amherst, Beverly, Chelsea, Gardner, Greenfield, North Adams, Southbridge, Wareham, Webster and West Springfield.
Pays for
Housing, infrastructure, public facilities, downtown revitalization, planning and public services that benefit low- and moderate-income residents.

To apply, a town must have spent all FFY 2022–23 funds, 80% of FFY 2024 funds and 30% of FFY 2025 funds; waiver requests are due Feb 19, 2027. Grants run 24 months, Jul 1, 2027 to Jun 30, 2029. These terms are proposed until the One-Year Action Plan is final.

How NEER helps: Engineering studies that define water, sewer or drainage projects.

MEMA hazard mitigation intake (FMA, HMGP, BRIC)

Massachusetts Emergency Management Agency (MEMA)
Open now
GrantStormwater & flood
Next date
FY2026 FMA: Statement of Interest due Nov 30, 2026 (required); benefit-cost analysis Dec 21, 2026; subapplications to MEMA Jan 11, 2027, 11:59 PM
Funding
Passes through FEMA funds. FY2026 FMA: $400M nationwide, with a federal share of 75%, 90% or 100% depending on the activity and the property's repetitive loss status. BRIC pays up to 75%.
Who
State agencies, Tribes and local governments (the city or town, not a department). Project grants need a current FEMA-approved hazard mitigation plan.
Pays for
MEMA checks basic eligibility from the Statement of Interest, opens FEMA GO access and gives technical help to the projects it recommends, ranks subapplications through an interagency panel and submits them to FEMA.

There are separate Statement of Interest forms for construction projects and for capacity building, planning or advance assistance. HMGP for DR-4780 (Sep 2023 flooding in Bristol and Worcester counties) had about $984,000 statewide and closed to subapplications Mar 10, 2025. DR-4919 (Feb 2026 winter storm, declared Jun 30, 2026) covers only the Mashpee Wampanoag Tribe.

How NEER helps: Hazard mitigation plan actions and benefit-cost analysis backed by flood models.

Local and regional County and regional cost-share programs.

MWRA I/I Local Financial Assistance Program

Massachusetts Water Resources Authority (MWRA)
Rolling
GrantLoanWastewater (sewer)
Next date
Apply at least 30 days before the target distribution date; 90 days' notice for requests over $2M
Funding
Phase 16: $125M as 75% grant and 25% interest-free loan, repaid over 10 years. Phase 15: $100M in interest-free loans. Each community's share is set by its share of wholesale sewer charges.
Who
MWRA member sewer communities
Pays for
I/I planning, design, sewer rehabilitation, pipe replacement and public and private inflow removal.

Communities must use earlier phase funds first but can skip the loan-only Phases 13 and 15. MWRA surveys each community's three-year spending plan every spring.

How NEER helps: I/I and flow monitoring analysis with calibrated sewer models.

Rolling
LoanGrantDrinking water
Next date
Funds go out quarterly on or about Feb 15, May 15, Aug 15 and Nov 15; apply at least one month before
Funding
Water loans: $1.025B in interest-free 10-year loans over four phases (Phase 4: $300M, FY25–FY35). Lead lines: $200M in 10-year interest-free loans through FY33, plus a 25% grant where the community pays for the private side.
Who
47 MWRA member water communities
Pays for
Unlined and asbestos cement main replacement or lining, lead and galvanized service replacement, valves, hydrants, storage tanks, meters and related engineering.

Each year's draw is capped at the larger of 10% of the allocation or $500,000, with unused amounts rolling over. Lead line projects must remove both the public and private sides. Loans need a bond counsel opinion.

How NEER helps: Lead service line material prediction; water main condition and capital planning.

Cape Cod and Islands Water Protection Fund subsidy

Cape Cod and Islands Water Protection Fund Management Board
Check agency
GrantWastewater (sewer)
Next date
Tied to projects on MassDEP's Clean Water SRF plan; check the agency
Funding
25% subsidy on SRF-financed projects, paid over the loan term as principal comes due (since the 2023 plan)
Who
Cape Cod and Islands towns with wastewater or water quality projects on the Clean Water SRF plan
Pays for
Wastewater infrastructure and water quality remediation projects.

The subsidy depends on getting SRF financing, so the summer PEF filing matters.

How NEER helps: Sewer and nitrogen load planning for wastewater plans.

Sources

  1. CRS: FY2026 EPA water infrastructure appropriations
  2. Water Online: federal funding cliff (Aug 2026)
  3. CRS: FY2027 Interior-Environment appropriations (Oct 2026)
  4. CRS: BRIC recent developments (Jun 2026)
  5. FEMA FY2026 FMA NOFO summary (Granted, Oct 2026)
  6. American Flood Coalition: FMA
  7. FY2026 FMA Swift Current NOFO
  8. FEMA $600M Swift Current announcement
  9. Missouri SEMA Mitigation Management
  10. FEMA-4924-DR Missouri declaration map
  11. Kansas DR-4897 declaration notice
  12. GAO-26-107774: BRIC
  13. EPA WIFIA available funding
  14. EPA OSG FY2025–26 allocation memo
  15. EPA FY2026 EC-SDC allotment memo
  16. USDA Water & Waste Disposal Loan & Grant
  17. Grants.gov: EDA PWEAA (no deadline)
  18. House Appropriations FY27 member request guidance
  19. USACE CAP Section 205 fact sheet
  20. MassDEP, eSRF portal login page (PEF and application status)
  21. MassDEP, SRF Intended Use Plans (2026 final plans; no 2027 draft posted when checked Nov 26, 2026)
  22. MassDEP, 2026 Final Intended Use Plan for the Clean Water State Revolving Fund, Apr 1, 2026
  23. MassDEP, Notification of project solicitation period, PEFs for 2027 SRF Intended Use Plan projects, Jun 1, 2026
  24. MassDEP, Getting State Revolving Fund Financial Assistance
  25. Massachusetts Clean Water Trust, Disadvantaged Community Loan Forgiveness Program
  26. Mass. Treasury, Treasurer Goldberg announces $108.1 million in loan forgiveness for 46 municipal water projects, Nov 9, 2026
  27. Mass. Treasury, Clean Water Trust approves $244.5 million in new grants and loans at its July meeting, Jul 8, 2026
  28. Mass. Treasury, Clean Water Trust approves $135.2 million in new loans at its November meeting, Nov 4, 2026
  29. MassDEP, 2026 Final Intended Use Plan for the Drinking Water State Revolving Fund
  30. Massachusetts Clean Water Trust and MassDEP, Lead Service Line Replacement Program
  31. Mass. Treasury, Treasurer Goldberg highlights grant program to protect Massachusetts water infrastructure (cybersecurity grants), Aug 2026
  32. Mass. Treasury, Treasurer Goldberg announces $98.8 million in grants for 59 municipal water projects, Dec 2025
  33. Chelmsford Water District, Board minutes, May 20, 2026 (SRF and PEF timing)
  34. Massachusetts Clean Water Trust, Asset Management Planning Grant Program (paused notice, Jul 1, 2026)
  35. MassDEP, State Revolving Fund Applications & Forms
  36. COMMBUYS, DEP-BWR-NOI-FY27-604b grant announcement (BD-27-1045-BWR00-BWR01-132526)
  37. COMMBUYS, DEP-BWR-NOI-FY27-319 grant announcement (BD-27-1045-BWR00-BWR01-132812)
  38. EEA, MVP Action Grant
  39. EEA, Environment & Climate One Stop (important dates and eligibility)
  40. EEA, ECO One Stop Grants Catalogue
  41. COMMBUYS, Environment & Climate One Stop FY27 grants round (BD-26-1042-ENV-ENV01-124463)
  42. Governor's press release, Healey-Driscoll Administration awards $45 million to protect Massachusetts communities from flooding, extreme heat and climate impacts, Aug 13, 2026
  43. EEA, MVP 2.0 Planning Grant Details (FY27 round)
  44. COMMBUYS, Municipal Vulnerability Preparedness (MVP) Planning 2.0 FY27 (BD-27-1042-ENV-ENV01-134963)
  45. Massachusetts CZM, Coastal Resilience Grant Program
  46. EEA, Apply to the Dam and Seawall Grant Program
  47. TEC, Community One Stop for Growth is accepting EOIs, Feb 5, 2026 (secondary)
  48. GrantExec, Community One Stop for Growth Grant listing (secondary aggregator)
  49. Governor's press release, $40 million for Northeast Mass through 2027 Community One Stop for Growth, Oct 2, 2026 (copy on Rep. Kassner's site)
  50. EOHLC, Community Development Block Grant (CDBG)
  51. EOHLC, FFY 2027 Proposed Changes Memo, Massachusetts CDBG
  52. MEMA, Building Resilient Infrastructure and Communities (BRIC) & Flood Mitigation Assistance (FMA) Grant Programs
  53. MEMA, State Notice of Funding Opportunity, FY 2026 Flood Mitigation Assistance, Nov 12, 2026
  54. MEMA, Hazard Mitigation Grant Program (HMGP), incl. HMGP-4780-MA
  55. OpenFEMA, Disaster Declarations Summaries for Massachusetts since 2023
  56. MWRA, Local I/I Community Financial Assistance
  57. MWRA, Local Water System Assistance
  58. MWRA, Lead Service Line Replacement Program
  59. Cape Cod Commission, Cape Cod and Islands Water Protection Fund Board votes to modify funding model, award subsidies, Mar 22, 2024