MWRA water communities (Greater Boston and Chicopee Valley), Massachusetts · Status checked November 16, 2026
MWRA Local Water System Assistance Program and Lead Service Line Replacement loans
Massachusetts Water Resources Authority (MWRA)
- Next date
- Funds go out quarterly on or about Feb 15, May 15, Aug 15 and Nov 15; apply at least one month before
- Funding
- Water loans: $1.025B in interest-free 10-year loans over four phases (Phase 4: $300M, FY25–FY35). Lead lines: $200M in 10-year interest-free loans through FY33, plus a 25% grant where the community pays for the private side.
- Who can apply
- 47 MWRA member water communities
- Pays for
- Unlined and asbestos cement main replacement or lining, lead and galvanized service replacement, valves, hydrants, storage tanks, meters and related engineering.
- Tip
- Each year's draw is capped at the larger of 10% of the allocation or $500,000, with unused amounts rolling over. Lead line projects must remove both the public and private sides. Loans need a bond counsel opinion.
- How NEER helps
- Lead service line material prediction; water main condition and capital planning.
Program page Sources [1] [2]