Oregon ยท Status checked November 16, 2026
CDBG Public Works (water and wastewater) and stormwater planning
Business Oregon
- Next date
- 2026 round ran Jul 1 to Sep 30, 2026, with awards within 60 days. 2027 dates come with the 2027 Method of Distribution; check the agency.
- Funding
- Up to $2.5M per water or sewer project over five years (final design and construction combined), and no more than $20,000 per residential connection. Stormwater management plan grants up to $50K. About $6.1M for public works in 2026.
- Who can apply
- Non-metropolitan cities and counties. Not the 14 entitlement cities (including Portland, Salem, Eugene and Bend) or Clackamas, Multnomah, Washington and Marion counties. Area must be at least 51% low and moderate income.
- Pays for
- Final design or construction of water and wastewater treatment, pipes and reservoirs. Applicants apply for final design or construction; planning and feasibility studies are not funded here.
- Tip
- Contact Business Oregon to build a project concept and pre-application first. Systems under 125 connections can't reach the $2.5M cap. Water meters are required in the project area.
- How NEER helps
- Final design support backed by water and sewer models; stormwater management plans.
Program page Sources [1] [2]