Oregon ยท Status checked November 16, 2026

CDBG Public Works (water and wastewater) and stormwater planning

Business Oregon

Next cycleGrantDrinking waterWastewater (sewer)Stormwater & flood
Next date
2026 round ran Jul 1 to Sep 30, 2026, with awards within 60 days. 2027 dates come with the 2027 Method of Distribution; check the agency.
Funding
Up to $2.5M per water or sewer project over five years (final design and construction combined), and no more than $20,000 per residential connection. Stormwater management plan grants up to $50K. About $6.1M for public works in 2026.
Who can apply
Non-metropolitan cities and counties. Not the 14 entitlement cities (including Portland, Salem, Eugene and Bend) or Clackamas, Multnomah, Washington and Marion counties. Area must be at least 51% low and moderate income.
Pays for
Final design or construction of water and wastewater treatment, pipes and reservoirs. Applicants apply for final design or construction; planning and feasibility studies are not funded here.
Tip
Contact Business Oregon to build a project concept and pre-application first. Systems under 125 connections can't reach the $2.5M cap. Water meters are required in the project area.
How NEER helps
Final design support backed by water and sewer models; stormwater management plans.

Program page Sources [1] [2]

Sources

  1. Business Oregon: Community Development Block Grant
  2. Oregon CDBG 2026 Method of Distribution (revised Mar 27, 2026)