FEMA, through the state emergency management agency
Open now
GrantStormwater & flood
- Next date
- Feb 26, 2027 to FEMA. State deadlines come earlier.
- Funding
- $400M+ nationally, including about $20M for capability and capacity building
- Who
- NFIP communities in good standing with a FEMA-approved local hazard mitigation plan
- Pays for
- Localized flood risk reduction projects, elevation and acquisition of flood-prone properties, project scoping, planning and technical assistance.
In Oregon: Apply through OEM. OEM ran the re-released FY2024 FMA in 2026 (pre-applications closed Jun 12; OEM submitted Aug 6). It had not posted an FY2026 FMA intake when checked; ask OEM well before FEMA's Feb 26, 2027 deadline.
Last year of IIJA money for FMA.
How NEER helps: Benefit-cost analysis, H&H modeling for project scoping, repetitive loss area analysis (also earns CRS credit).
FEMA, through the State Hazard Mitigation Officer
Open now
GrantStormwater & flood
- Next date
- Deadline set for each qualifying flood disaster
- Funding
- $600M nationally
- Who
- Communities in states with a qualifying major flood disaster declaration
- Pays for
- Fast-tracked mitigation of repetitive and severe repetitive loss structures insured by the NFIP.
In Oregon: Oregon qualified for up to $10M in FY2026. Pre-applications through county or Tribal emergency managers closed Oct 9, 2026; invited subapplications are due to OEM Dec 18, 2026, and FEMA's deadline is Jan 14, 2027.
Ask the State Hazard Mitigation Officer whether Swift Current was triggered for your county.
How NEER helps: Identify and rank repetitive loss structures with flood models.
FEMA, through the state emergency management agency after a declaration
Open now
GrantStormwater & floodWastewater (sewer)Drinking water
- Next date
- Usually due within 12 months of the declaration. Confirm with the state.
- Funding
- Set as a share of each disaster’s federal assistance
- Who
- Jurisdictions in states with a major disaster declaration
- Pays for
- Cost-effective mitigation in the hazard mitigation plan: drainage upgrades, buyouts, flood warning, backup generators.
In Oregon: Apply through OEM. The last open round, DR-4854 (2024 wildfires; Gilliam, Grant, Umatilla, Wasco and Wheeler counties), closed Oct 3, 2025. FEMA's declaration data shows DR-4907 (Apr 7, 2026; Dec 15–21, 2025 storms and flooding in 11 counties) and DR-4881 (Jul 22, 2025; March 2025 storms in Coos, Curry, Douglas and Josephine) without HMGP. Ask OEM what is open, including HMGP Post Fire after the 2026 fire seasons.
Available only after a major disaster declaration in your state.
How NEER helps: Project definition and BCA backed by sewer and stormwater models.
FEMA, through the state emergency management agency
Awaiting NOFO
GrantStormwater & floodWastewater (sewer)Drinking water
- Next date
- FY2024–25 round closed Jul 23, 2026. FY2026 NOFO timing is under court order.
- Funding
- $1B for FY2024 and FY2025 combined
- Who
- States apply; local governments are subapplicants with an approved hazard mitigation plan
- Pays for
- Larger pre-disaster infrastructure projects plus capability and capacity building.
In Oregon: OEM ran the BRIC FY2024–25 round: pre-applications were due Apr 24, 2026 and OEM submitted subapplications Jul 23, 2026. Oregon had a $2M state allocation and a $1M building code plus-up.
FEMA restarted BRIC in March 2026 after a court order, with rewritten rules. Scope projects now so they are ready when FY2026 opens.
How NEER helps: Scoping studies and modeling to make projects application-ready.
LoanDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Letters of interest accepted anytime
- Funding
- About $6.5B available (November 2025 notice), plus $550M through SWIFIA for state authorities
- Who
- Public and private borrowers; projects generally $20M+ ($5M+ for communities of 25,000 or fewer)
- Pays for
- Long-term, low-rate loans for up to 49% of eligible costs for water, wastewater and stormwater projects.
Suited to large utility capital programs. Can be paired with SRF financing.
How NEER helps: Capital program optimization to package projects for a WIFIA loan.
GrantWastewater (sewer)Stormwater & flood
- Next date
- FY2025–26 allotments released Apr 2026; each state sets its own call
- Funding
- About $80M nationally for FY2025 and FY2026
- Who
- Municipalities; small and financially distressed communities need no cost share
- Pays for
- Combined and sanitary sewer overflow control and stormwater management projects.
Ask the state SRF program how and when it will distribute its allotment.
How NEER helps: Overflow and capacity modeling to define projects.
GrantDrinking water
- Next date
- Through the state drinking water program
- Funding
- $945.7M for FY2026, the final IIJA tranche
- Who
- Systems serving 10,000 or fewer people, or disadvantaged communities under state criteria
- Pays for
- PFAS and other emerging contaminant testing, planning and treatment. No local cost share.
In Oregon: Business Oregon takes EC-SDC money through the Safe Drinking Water Revolving Loan Fund's Emerging Contaminants application, due Feb 15 and Aug 15 while funds last.
EPA noted some states have been slow to spend earlier EC-SDC funds, so prior-year money may still be available.
How NEER helps: Source and treatment alternatives screening with water system models.
LoanGrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Applications accepted year-round through RD Apply
- Funding
- Loans up to 40 years; Jul–Sep 2026 rates were 2.875% (poverty) to 4.75% (market)
- Who
- Rural areas and towns of 10,000 or fewer people
- Pays for
- Drinking water, sanitary sewer, solid waste and stormwater drainage. Grants are combined with loans to keep user rates reasonable.
Grants are awarded alongside a loan, not on their own.
How NEER helps: Preliminary engineering reports with hydraulic models.
U.S. Economic Development Administration
Rolling
GrantDrinking waterWastewater (sewer)
- Next date
- No deadline; reviewed as received
- Funding
- EDA total FY2026 appropriation about $466M
- Who
- Distressed areas; project must be consistent with the regional CEDS
- Pays for
- Water and wastewater infrastructure that supports job creation, such as service to an industrial park.
Tie the project to named employers and jobs. Local match is required.
How NEER helps: Capacity analysis for new industrial load.
U.S. Army Corps of Engineers district
Rolling
Federal projectStormwater & floodDrinking waterWastewater (sewer)
- Next date
- Send a letter of request to the district anytime
- Funding
- Cost-shared federal study and construction
- Who
- Non-federal sponsors such as cities and counties
- Pays for
- §205 small flood risk management projects; §14 emergency streambank protection; §219 water and wastewater infrastructure where Congress has authorized it.
§219 needs specific authorization in a Water Resources Development Act, so start with your congressional office.
How NEER helps: Existing-conditions flood modeling to support the request.
GrantDrinking water
- Next date
- FY2026 NOFO expected before the end of 2026
- Funding
- FY2026 WaterSMART Grants appropriation: $15M
- Who
- Entities in Reclamation’s 17 western states, Alaska and Hawaii, with a non-federal cost share
- Pays for
- Water loss reduction, metering and AMI, efficiency and supply reliability projects.
In Oregon: Oregon is one of the 17 Reclamation states, so it is eligible.
Only the 17 Reclamation states are eligible.
How NEER helps: Water loss and pressure analysis with distribution models.