Drinking water planning (SIPP) and Small System Equipment Assistance (SSEA)

Business Oregon and the Oregon Health Authority

Open nowGrant (100% forgivable loans)Drinking water
Next date
SSEA: Feb 15 and Aug 15, 2027. SIPP: the Feb 15, 2027 round is cancelled; next deadline Aug 15, 2027.
Funding
SIPP: up to $50K for feasibility, system partnership, master plan (under 300 connections) or seismic risk studies (300 to 3,300 connections); up to $20K for asset management plans, rate studies, leak detection, security or resiliency studies and community engagement plans. SSEA: up to $20K per project.
Who can apply
Community and nonprofit non-community water systems. SIPP favors systems under 300 connections; SSEA is for systems with 300 or fewer.
Pays for
SIPP pays for planning, not design or construction. SSEA pays for small equipment and instrument additions or replacements.
Tip
A system can get SIPP once every three years and once per activity, combining up to two project types per award. The study must be done within two years.
How NEER helps
Master plans, leak detection and resiliency studies built on water system models.

Program page Sources [1] [2] [3]

Sources

  1. Oregon Health Authority: Sustainable Infrastructure Planning Projects
  2. Business Oregon: Safe Drinking Water Revolving Loan Fund
  3. Oregon DWSRF 2025 Base and IIJA General Supplemental Intended Use Plan