Oregon ยท Status checked November 16, 2026
Water/Wastewater Financing Program
Business Oregon, Infrastructure Finance Authority
- Next date
- Year-round, by invitation after an intake form with your Regional Development Officer
- Funding
- Infrastructure loans up to $10M, up to 30 years. Partial grants up to 50% of the project, capped at $750K, with reduced rates for communities below state MHI whose rates are at least 1.25% of MHI. Technical assistance grants up to $50K with no match; TA loans at 1% for 10 years.
- Who can apply
- Cities, counties, county service districts, special districts, ports and tribal councils. Technical assistance only for populations of 15,000 or less.
- Pays for
- Design and construction needed to meet Safe Drinking Water Act or Clean Water Act requirements. TA covers water master plans (300+ connections), wastewater facility plans, regionalization and preliminary engineering studies.
- Tip
- Needs documentation from OHA or DEQ that the project is required for compliance. TA does not cover stormwater master plans, seismic plans, rate studies or asset management plans.
- How NEER helps
- Wastewater facility plans and water master plans built on calibrated models.
Program page Sources [1]