South Carolina ยท Status checked November 16, 2026
SCEMD hazard mitigation intake (HMGP, BRIC) and SCDNR FMA
SC Emergency Management Division; SC Department of Natural Resources for FMA
- Next date
- FY2026 FMA due to SCDNR in FEMA GO by Feb 12, 2027. SCEMD lists HMGP for Helene (4829), Debby (4835) and the Nov 2024 Edisto River flooding (4858); intake dates not posted.
- Funding
- Passes through FEMA funds. HMGP is 75% federal, 25% non-federal (cash or in-kind).
- Who can apply
- SC jurisdictions with a FEMA-approved hazard mitigation plan; FMA also needs NFIP good standing
- Pays for
- SCEMD manages HMGP and BRIC subapplications; SCDNR manages FMA planning and project grants.
- Tip
- HMGP applications go through the SC Recovery Grants system. FEMA data show DR-4829 (Helene, declared Sep 29, 2024) with HMGP in 34 areas, and DR-4858 (declared Jan 10, 2025) in Bamberg, Calhoun and Orangeburg. DR-4908 (Jan 2026 winter storm, Oconee, Pickens and Greenville) did not list HMGP. For the FY2024-25 BRIC round, SCEMD submitted applications in FEMA GO by Jul 23, 2026. SCOR's Helene CDBG-DR can cover the HMGP and FMA match in six counties.
- How NEER helps
- Mitigation plan action items, flood models and benefit-cost support.
Program page Sources [1] [2] [3] [4]