SC Department of Environmental Services (technical) and SC Rural Infrastructure Authority (loans)
Open now
LoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
- Next date
- Fall 2026 call closed Nov 13, 2026. Project Questionnaires accepted anytime for the priority list; RIA takes loan applications Oct 1 to Jul 31. The FFY2027 call is expected early 2027 (last year: webinar Jan 29, PQs due Mar 20, 2026).
- Funding
- FY2027 rates: 2.70% standard, 2.50% incentive, 2.20% small system, 2.20% green (up to 25% of the loan). Up to 30 years, within useful life. 100% principal forgiveness, generally up to $2M per sponsor. FFY2026: $13.9M forgiveness and $250M in loans announced in January; the fall call listed $165M in loans and no forgiveness.
- Who
- Municipalities, counties, special purpose districts and joint regional entities. Forgiveness: systems under 10,000 people with MHI below the state MHI ($69,324) that can't afford an SRF loan, or a sustainable owner taking over a non-viable system.
- Pays for
- Treatment plants, pump stations, sewer rehabilitation and replacement, planning and evaluations, resiliency, and nonpoint source work such as stormwater conveyance and stream restoration.
To keep the FY2027 rate, get a construction permit and send RIA a complete loan application by Jul 31, 2027. The incentive rate needs a project first listed on the FY2026 or FY2027 plan and closed by Jun 30, 2027. Forgiveness sponsors must be current on audits. Sponsors must comply with their NPDES permit unless the project fixes it. Routine O&M isn't eligible. SCDES moved its FFY2026 clean water emerging contaminant grant to the drinking water fund. A separate $9.4M Helene decentralized-systems grant (100% forgiveness) covers the DR-4829 area. EPA also announced $697,000 in FY2025-26 sewer overflow and stormwater reuse (OSG) funds for South Carolina; check the agency for a call.
How NEER helps: Preliminary engineering reports built on calibrated sewer models; I/I, capacity and stormwater studies.
SC Department of Environmental Services (technical) and SC Rural Infrastructure Authority (loans)
Open now
LoanGrant (principal forgiveness)Drinking water
- Next date
- Fall 2026 call, billed as the last call for lead line and SRF emerging contaminant money, closed Nov 13, 2026. PQs accepted anytime; RIA takes loan applications Oct 1 to Jul 31. FFY2027 call expected early 2027.
- Funding
- Same FY2027 rates as clean water (2.70% standard, 2.50% incentive, 2.20% small system). 100% forgiveness, generally up to $2M per sponsor. Fall 2026 call: $70M in loans, no general forgiveness, $2.6M emerging contaminant forgiveness for any size system, $23M for lead lines at about half loan and half forgiveness. FFY2026 emerging contaminant plan: $11.3M, all as forgiveness.
- Who
- Community water systems owned by municipalities, counties, special purpose districts, joint regional entities, and nonprofit community systems set up under state law
- Pays for
- Treatment, wells, storage, mains, interconnections, planning, resiliency, lead service line replacement and PFAS projects.
Meter replacement counts as routine O&M and growth-driven projects usually aren't eligible. Emerging contaminant forgiveness also covers a sustainable system that extends service to homes on private wells over the PFAS limits. At least 49% of lead line work must be in disadvantaged areas. Helene: $17.8M in supplemental DWSRF money for the DR-4829 area, at least 30% as forgiveness, offered to disadvantaged communities first. Same Jul 31, 2027 loan and Sep 30, 2027 forgiveness agreement deadlines as clean water.
How NEER helps: Lead service line material prediction; water system models for PFAS alternatives and interconnections.
SC Rural Infrastructure Authority
Open now
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Round 2 applications due Mar 22, 2027, 5 p.m. Round 1 (Sep 14, 2026) awarded over $25M to 22 projects in November. Emergencies in Tier III and IV counties anytime.
- Funding
- Up to $1.5M per grant; more with written justification. FY2027 estimate: $35M Basic, $8.8M Economic. Tier I and II counties match at least 25% of construction; Tier III and IV pay only non-construction and ineligible costs.
- Who
- Local governments, special purpose and public service districts, and public works commissions that own the system. A local government can apply for a nonprofit water or sewer company.
- Pays for
- Construction of water, wastewater and stormwater drainage facilities. Basic ranks regional solutions first, then consent orders and emergencies, then other health issues, then aging infrastructure. Economic supports job creation.
RIA generally expects grant costs under $20,000 per customer or $10,000 per job, and 70% signed connection commitments for new line extensions. Water and sewer applicants complete RIA's Utility Viability Tool; stormwater applicants show current or planned stormwater fees. A delinquent audit can block an award. Unfunded Round 1 applications can be carried to Round 2 on written request.
How NEER helps: Engineering support and models that document the need and size the project.
SC Rural Infrastructure Authority
Rolling
GrantDrinking waterWastewater (sewer)
- Next date
- Apply anytime; considered in the order received while funds last
- Funding
- Up to $500K; about $1M budgeted for FY2027
- Who
- Public water and wastewater utilities; larger utilities or local governments can apply with or for them
- Pays for
- Studies of regional partnerships or consolidation: asset condition, financial and management capacity, options and next steps.
A study of a physical interconnection alone, with no other partnership, is generally not eligible. Projects should close within 18 months.
How NEER helps: Regionalization studies with water and sewer models of the combined system.
SC Rural Infrastructure Authority
Open now
GrantDrinking waterWastewater (sewer)
- Next date
- Next round due Mar 22, 2027, 5 p.m.
- Funding
- About $4M for FY2027. Assessment and planning help first; then up to $2M for priority capital work without a competitive round.
- Who
- Public water or sewer utilities serving 10,000 or fewer, or any size in Tier III and IV counties, with a viability concern such as repeated violations, missing audits, an old system or weak local economics
- Pays for
- A three-step program: rapid assessment, an action plan, then funding for the most critical improvements.
Needs a board or council resolution committing to cooperate. Systems of 3,300 or fewer with serious problems rank first. The application is separate from RIA's grant application.
How NEER helps: System assessments and capital plans backed by models.
SC Rural Infrastructure Authority
Next cycle
GrantDrinking waterWastewater (sewer)Stormwater & flood
- Next date
- Fully awarded. Federal (ARPA) expenditure deadline is Dec 31, 2026. No successor round announced.
- Funding
- $1.469B committed to 219 projects
- Who
- Local governments and public water and sewer utilities (past awards)
- Pays for
- ARPA-funded water, sewer and stormwater grants. New requests go to RIA's state grants and the SRFs.
RIA reported over $2B in SCIIP applications against the money available. For FY2027 it asked the legislature for $24M more in recurring money for the Rural Infrastructure Fund and Statewide Water and Sewer Fund. A current SCIIP grant doesn't bar an FY2027 state grant application.
SC Department of Commerce, with the Appalachian and Catawba councils of governments
Check agency
GrantDrinking waterWastewater (sewer)
- Next date
- FY2027 dates not confirmed. For FY2026, requests were due Nov 17, 2025 and invited applications Feb 2, 2026. Check the agency.
- Funding
- Up to $1M for construction, $250K non-construction, $100K planning. ARC pays up to 50% in Anderson, Oconee, Pickens and Spartanburg, 70% in Cherokee, 80% in Union, 30% in Greenville (FY2026 rules).
- Who
- Local governments and other public and nonprofit bodies in Anderson, Cherokee, Greenville, Oconee, Pickens, Spartanburg and Union counties
- Pays for
- Infrastructure including water and sewer systems that supports economic development.
Construction projects need an ARC basic agency (such as USDA RD, EDA or SC Commerce) as fiscal agent. SC Commerce also runs the Southeast Crescent Regional Commission program for other counties; its pre-applications are typically due in March.
How NEER helps: Preliminary engineering reports backed by system models.
SC Office of Resilience, Mitigation Department
Open now
GrantStormwater & flood
- Next date
- Applications due Jan 29, 2027, 11:59 p.m. ET (extended), in SCOR's online portal
- Funding
- $10M total: $5M for plans, studies and project scoping; $5M for stormwater restoration, stormwater improvements and voluntary buyouts. No minimum or maximum per project.
- Who
- Counties and municipalities; councils of government, tribes and 501(c)(3) nonprofits for some project types; homeowners for buyouts only
- Pays for
- Watershed and drainage studies, flood risk modeling, design to 90-100% construction documents, restoring existing drainage systems, construction of shovel-ready stormwater projects, and residential buyouts.
Aligned with the Strategic Statewide Resilience and Risk Reduction Plan; the 2026 round is stormwater only. Hazard mitigation plan status doesn't affect eligibility, and a benefit-cost analysis isn't required for studies or scoping. Choose recipient-run or state-run management; restoration and buyouts are state-run. Drainage ditch inventories and ownership mapping can qualify; septic mapping for water quality doesn't.
How NEER helps: Watershed and drainage studies, flood models and design for stormwater projects.
GrantMatch helpStormwater & flood
- Next date
- Helene infrastructure applications are under review; awards pending. Helene matching funds and plans and studies take requests year-round until funds run out. CDBG-MIT lists no open window.
- Funding
- Helene: $19.6M mitigation set-aside of about $150M CDBG-DR; up to $10M per stormwater infrastructure project. CDBG-MIT (2015-2016 storms): $162.188M total.
- Who
- Helene: units of local government and state agencies in Aiken, Anderson, Greenville, Greenwood, Laurens and Spartanburg counties. CDBG-MIT: HUD most impacted and distressed counties.
- Pays for
- Stormwater infrastructure that reduces riverine and surface flooding, buyouts, hazard mitigation plans, flood studies and design, and the local match for FEMA HMGP and FMA.
Helene infrastructure scoring weighs the share of low- and moderate-income residents served, the benefit-cost ratio and the flood risk reduced. Match requests are first come, first served. SCOR prefers spreading money across several projects over one large award.
How NEER helps: Flood studies, benefit-cost analysis and stormwater design for the six Helene counties.
GrantLoanMatch helpStormwater & flood
- Next date
- No open round listed. Used after a federally declared disaster. Check the agency.
- Funding
- Check the agency
- Who
- State and local governments in disaster areas and 501(c)(3) organizations
- Pays for
- The nonfederal share of federal disaster programs, infrastructure repairs not eligible for CDBG-DR, and loans and grants for cash-flow needs after a disaster.
The fund pays for SCOR's Helene Rapid Rebuild housing program. Contact the Reserve Fund manager at SCOR after a declaration.
SC Emergency Management Division; SC Department of Natural Resources for FMA
Open now
GrantStormwater & flood
- Next date
- FY2026 FMA due to SCDNR in FEMA GO by Feb 12, 2027. SCEMD lists HMGP for Helene (4829), Debby (4835) and the Nov 2024 Edisto River flooding (4858); intake dates not posted.
- Funding
- Passes through FEMA funds. HMGP is 75% federal, 25% non-federal (cash or in-kind).
- Who
- SC jurisdictions with a FEMA-approved hazard mitigation plan; FMA also needs NFIP good standing
- Pays for
- SCEMD manages HMGP and BRIC subapplications; SCDNR manages FMA planning and project grants.
HMGP applications go through the SC Recovery Grants system. FEMA data show DR-4829 (Helene, declared Sep 29, 2024) with HMGP in 34 areas, and DR-4858 (declared Jan 10, 2025) in Bamberg, Calhoun and Orangeburg. DR-4908 (Jan 2026 winter storm, Oconee, Pickens and Greenville) did not list HMGP. For the FY2024-25 BRIC round, SCEMD submitted applications in FEMA GO by Jul 23, 2026. SCOR's Helene CDBG-DR can cover the HMGP and FMA match in six counties.
How NEER helps: Mitigation plan action items, flood models and benefit-cost support.
SC Emergency Management Division
Open now
LoanMatch helpStormwater & flood
- Next date
- Letter of interest due to SCEMD Dec 4, 2026
- Funding
- 1% interest loans
- Who
- Local governments with a current FEMA-approved local hazard mitigation plan
- Pays for
- Low-interest loans for qualifying mitigation projects or the non-federal match on FEMA grants.
Can cover the non-federal match on FEMA mitigation grants.
How NEER helps: Flood models and benefit-cost support for the loan project.
SC Department of Environmental Services, Nonpoint Source Program
Next cycle
GrantStormwater & floodWastewater (sewer)
- Next date
- 2026 applications closed Aug 14, 2026. Next request for applications expected around August 2027.
- Funding
- No per-application maximum. 40% non-federal match. At least 75% of federal funds must go to on-the-ground practices.
- Who
- State agencies, local governments, public universities, soil and water conservation districts, regional planning bodies, watershed groups and nonprofits
- Pays for
- Practices that carry out an approved nine-element watershed plan, such as detention ponds, riparian buffers and failing septic system repair.
Inside an MS4, the work must go beyond the permit, can't be counted toward permit compliance and needs a signed letter of assurance from the permit holder.
How NEER helps: Watershed modeling to target and size practices.
SC Department of Environmental Services, Dam Safety Program
Opening soon
GrantStormwater & flood
- Next date
- Funding Cycle 3 coming; SCDES said dates follow the FY2027 state budget. Cycle 2 closed May 4, 2026.
- Funding
- About $3M in state funds through budget provisos. Cycle 1 awarded $717,307 to five dams; Cycle 2 selected nine for $1,447,648.
- Who
- Owners of state-regulated High or Significant hazard potential dams rated Poor or Unsatisfactory, or with an engineer-identified deficiency
- Pays for
- Cost-share grants to correct dam deficiencies SCDES has identified.
Low hazard and exempt dams aren't eligible. Check the Cycle 2 notice for match and award limits.
How NEER helps: Dam breach and spillway capacity models.