Check before you apply. Amounts, dates and eligibility may be out of date or wrong. Confirm with the agency. About accuracy
Vermont ยท Status checked November 16, 2026

Clean Water SRF loans and loan forgiveness

Vermont DEC, Water Investment Division, with the Vermont Bond Bank

RollingLoanGrant (principal forgiveness)Wastewater (sewer)Stormwater & flood
Next date
Planning and design loans accepted on a rolling basis while funds last. Construction loans need a Project Priority List application each year: the next call is expected around mid-December 2026, due around mid-February 2027.
Funding
FFY2025 plan: municipal construction loans at 0% interest with a 2% yearly admin fee (2.75% for private borrowers). Planning forgiveness 50% up to $100,000 per project. Construction forgiveness 50% up to $1M per project for communities meeting affordability criteria; 100% for emerging contaminant projects. $5M planning loan put-aside. Floodplain buyout forgiveness up to $100,000 ($250,000 in manufactured home communities), $500,000 total.
Who can apply
Municipalities; private entities for some clean water projects. Only municipal applicants could get forgiveness under the FFY2025 plan.
Pays for
Wastewater treatment, collection systems, CSO separation, stormwater, flood resiliency work tied to a structural facility, groundwater protection and natural resources projects, from planning through construction.
Tip
Apply to the priority list every year you'll need construction money. Forgiveness is first come, first served and is reserved only once a complete application, QBS certification and draft engineering agreement are in. The FFY2025 plan bypassed projects that missed readiness dates (final design application by Nov 1, bond vote warned by Jan 31, voter approval by May 1, construction application by Jun 30). Terms shown are from the FFY2025 draft plan; check the agency for the FFY2026 plan.
How NEER helps
Planning studies and preliminary engineering reports built on calibrated sewer models; CSO and I/I studies.

Program page Sources [1] [2] [3] [4] [5]

Sources

  1. Vermont DEC: Clean Water SRF Draft Intended Use Plan for FFY2025 (Jul 2, 2025), copy on the UNM SWEFC SRF Switchboard
  2. UNM SWEFC SRF Switchboard: Vermont State Revolving Fund resources
  3. Vermont DEC: Annual Report on the Vermont EPA Pollution Control Revolving Fund (Jan 15, 2026), legislative report
  4. Vermont DEC: Proposed SFY26-27 Capital Budget Adjustment Policy Items, House Corrections and Institutions testimony (Mar 19, 2026)
  5. Vermont Bond Bank: State Revolving Funds